Permits
2,956 permits • page 1 of 30
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 90 | roofing | 2026-10-12 | AUSTIN | 2204 ALEXANDER AVE BLDG 2 | BUILDING 2 1 STORY SFR 2/1 REAR OF MAIN HOUSE Revision: Permit Revision Narrative: This resubmittal documents three major revisions to the approved permit drawings for this residential development. 1. Conditioned Square Footage Unit 1: The total conditioned square footage for Unit 1 increased to include an enclosed dining room. The screened porch from the previous design is no longer part of the project scope. There are no other permit relevant revisions to Unit 1. Unit 2: The floor plan layout of Unit 2 has been revised. Floor plan on A1.2 show updated visitable route and bathroom smoke/carbon monoxide detector locations attic access and call out square footage and ceiling heights by space. Escape and rescue openings are called out in the window and door schedules on sheet A1.3. Shared Accessory Room: Introduced a new shared accessory room between Unit 1 & Unit 2. Updated FAR calculations are provided on A0.1. 2. Building Footprint & Envelope The proposed revision required minor adjustments to the building footprint & foundation. As part of the revised design the footprint of the wood deck also adjusted. Updated impervious cover and total building coverage calculations are provided on A0.1. Revisions to openings and new openings are shown in the updated window and door schedules on sheet A1.3. 3. Fire Separation Between Dwelling Units The revised design locates a shared accessory room per 2024 IRC R302.3.6 between Unit 1 and Unit 2. The function of the shared accessory room is to provide a storage space accessible from both units. The walls between the shared accessory room and dwelling units are separated per Table R302.3.6 Dwelling Shared Accessory Room Separation and separation requirements are vertically continuous from foundation to roof deck. Structures supporting the ceiling of the shared accessory room are separated per Table R302.3.6 Dwelling Shared Accessory Room Separation. There is no habitable space above or below the shared accessory room. All openings in walls separating dwelling units from the shared accessory room are compliant with R302.3.6.1 Opening Protection. All duct penetrations shall comply with R302.3.6.2 and shall not have openings into the shared accessory room. All other penetrations shall comply with R302.3.6.3. See A0.2 Fire Separation & Details for updated code compliance diagrams. | $0 | active | |
| 90 | roofing | 2026-10-12 | AUSTIN | 2204 ALEXANDER AVE BLDG 1 | BUILD 1 New construction of two dwelling units joined with a covered screened porch attached carport raised terrace and uncovered wood deck. New driveway approach leading to a ribbon driveway 1/1.5 Revision: Permit Revision Narrative: This resubmittal documents three major revisions to the approved permit drawings for this residential development. 1. Conditioned Square Footage Unit 1: The total conditioned square footage for Unit 1 increased to include an enclosed dining room. The screened porch from the previous design is no longer part of the project scope. There are no other permit relevant revisions to Unit 1. Unit 2: The floor plan layout of Unit 2 has been revised. Floor plan on A1.2 show updated visitable route and bathroom smoke/carbon monoxide detector locations attic access and call out square footage and ceiling heights by space. Escape and rescue openings are called out in the window and door schedules on sheet A1.3. Shared Accessory Room: Introduced a new shared accessory room between Unit 1 & Unit 2. Updated FAR calculations are provided on A0.1. 2. Building Footprint & Envelope The proposed revision required minor adjustments to the building footprint & foundation. As part of the revised design the footprint of the wood deck also adjusted. Updated impervious cover and total building coverage calculations are provided on A0.1. Revisions to openings and new openings are shown in the updated window and door schedules on sheet A1.3. 3. Fire Separation Between Dwelling Units The revised design locates a shared accessory room per 2024 IRC R302.3.6 between Unit 1 and Unit 2. The function of the shared accessory room is to provide a storage space accessible from both units. The walls between the shared accessory room and dwelling units are separated per Table R302.3.6 Dwelling Shared Accessory Room Separation and separation requirements are vertically continuous from foundation to roof deck. Structures supporting the ceiling of the shared accessory room are separated per Table R302.3.6 Dwelling Shared Accessory Room Separation. There is no habitable space above or below the shared accessory room. All openings in walls separating dwelling units from the shared accessory room are compliant with R302.3.6.1 Opening Protection. All duct penetrations shall comply with R302.3.6.2 and shall not have openings into the shared accessory room. All other penetrations shall comply with R302.3.6.3. See A0.2 Fire Separation & Details for updated code compliance diagrams. | $0 | active | |
| 90 | roofing | 2026-04-20 | AUSTIN | 738 GUNTER ST | All Interior remodel with New Roof. No addition to the footprint or increase in house square footage. However a new roof will be added due to tree damage and itll increase the height of the structure from 14-4.5 to 15-8. | $190,000 | Daniel Besa | active |
| 90 | roofing | 2026-03-09 | AUSTIN | 5703 DUVAL ST | *Addressing active code violation* Addition/ remodel of existing 1-story single-family residential to include: carport was converted to garage w/o a permit; converting garage to (space not currently labeled) with addition of window seat utility room and half bath; addition to rear of property to include hallway 2 bedrooms and 1 bath; new rear uncovered wood deck; new covered front porch. Rolling in scope of work from expired 2025-078980 BP & PP: Express: Existing vinyl siding replacement existing wood frame single pane window replacement QTY x 6 existing roof shingle replacement (like for like) | $367,816 | Ryan Bollom | active |
| 80 | roofing | 2026-10-29 | AUSTIN | 3921 BALCONES DR | EXPRESS: We are replacing a garage door that is rotting with a new one. replacing 3 windows in the master bathroom with new ones that are the exact same size and brand. replacing some of the facia shingle mold and soffit around the house as needed due to rot repairing or replacing siding as needed and according to inspection report around the house due to rot. repairing some roof decking above the soffits installing a new composition roof and replacing the old one. replacing 3 air conditioning systems that were at their useful lifespans with high efficiency units replace can bulbs to LED bulbs installing a new tub in the master bath along with a new faucet in same location installing new tile flooring in the master bath installing new countertops/sinks/faucets in the master bath same locations installing a new toilet in master bath same location and repaint the entire house | Jeff Megerle | active | |
| 80 | roofing | 2026-10-27 | AUSTIN | 2307 LONGVIEW ST BLDG A | ePlan: Residential Expedited Review - New TWO UNIT RES. Bldg 1 New construction of a 2-Story Single Family Res. [5bed 5bath] with roof deck | Terry Herrin | active | |
| 80 | roofing | 2026-10-26 | AUSTIN | 4509 MERLE DR | Addition and interior remodel of existing one-story single-family residence. Remove portions of existing roof and interior walls; construct approx. 1143 SF one-story addition (kitchen living laundry bath support spaces) with new front porch and uncovered wood deck. New slab-on-grade foundation with drilled piers tied to existing pier-and-beam structure. New stucco exterior and asphalt shingle roofing at 4:12 to match existing. | $1 | Patrick Georgiou | active |
| 80 | roofing | 2026-10-24 | AUSTIN | 1851 WESTLAKE DR | ePlan: Residential Expedited Review - Remodel to Existing 2-Story Single Family Res. Work to include interior remodel Replace Deck. all new doors and windows replace roof | JAIME RODRIGUEZ | active | |
| 80 | roofing | 2026-10-23 | AUSTIN | 7205 KENOSHA PASS | Electrical service rebuild 200A overhead service. Includes a new roof penetration for 2-inch rigid riser feeding into a new 200A lever bypass meter can. A main disconnect is being added to the exterior of the home - with a verifiable grounding and bonding system and surge protection. | Joshua Stanley | active | |
| 80 | roofing | 2026-10-22 | AUSTIN | 8933 IVEANS CV | Addition/ remodel of 1 story SFR Construct a 455 SF addition and minor interior remodel including new foundation framing roofing drywall flooring cabinetry new electrical fixtures and wiring and new plumbing fixtures. No major demolition. | Albert L. Fischer | active | |
| 80 | roofing | 2026-10-22 | AUSTIN | 9416 LIGHTWOOD LOOP | New attached covered screened patio approx. 595 sq ft total (380 sq ft screened + 215 sq ft open) located on north/backyard side of house. Hip roof structure approximately 11-12ft peak height with 36 overhang on open sides. Includes new concrete slabs electrical extension from existing panel. Structure does not encroach into P.U.E. which is 32.5ft from the rock wall/property boundary | $1 | John Douglas | active |
| 80 | roofing | 2026-10-16 | AUSTIN | 7705 KESWICK DR | Express- Residential Reroof (shingle to shingle) | $1 | Stacie Feller | active |
| 80 | roofing | 2026-10-14 | AUSTIN | 10225 PINEHURST DR | Express: Re-roofing - Removing 45.33 SQ of concrete roof tiles and replacing with laminate shingles on main dwelling | $1 | Patrick Nussbeck | active |
| 80 | roofing | 2026-10-07 | AUSTIN | 1804 E 22ND ST BLDG 1 | ePlan: Residential Expedited Review - BLDG 1: New 2-story single family residence w/ 1-car carport 3 bed 3.5 bath balcony covered patio roof deck above 2nd floor. Part of 3-unit use. | John Delario Jr | active | |
| 80 | roofing | 2026-10-06 | AUSTIN | 1109 RUTH AVE | Addition Primary suite and laundry addition raising the roof line on the entire house to increase the pitch and extending the front covered patio. | Terry Herrin | active | |
| 80 | roofing | 2026-09-28 | AUSTIN | 1140 MASON AVE | *Partial Demo* Interior remodel and the permitting of a roof extension to main house. | $290,000 | Patrick Georgiou | active |
| 80 | roofing | 2026-05-22 | AUSTIN | 4205 RAMSEY AVE | Renovate existing 1-story ADU: Replace windows doors siding & roofing. Update MEP. Reconfigure floor plan/plumbing locations. Replace foundation in | Pedro Delgado | active | |
| 80 | roofing | 2026-04-30 | AUSTIN | 2306 WILLOW ST | Addition to existing 1-story single-family residential to include: new covered rear patio; leveling out roof. | Martin Medina | active | |
| 80 | roofing | 2026-04-22 | AUSTIN | 601 RIO GRANDE ST UNIT 300 | ePlan: Commercial Expedited Review - Exterior Remodel of an Existing Pool Bar Area and Addition of New Roof Area Over Two Portions of Level 3 (16000 S | $1,500,000 | active | |
| 80 | roofing | 2026-04-22 | AUSTIN | 601 RIO GRANDE ST UNIT 300 | ePlan: Commercial Expedited Review - Exterior Remodel of an Existing Pool Bar Area and Addition of New Roof Area Over Two Portions of Level 3 (16000 SF) | $1,500,000 | active | |
| 80 | roofing | 2026-04-20 | AUSTIN | 738 GUNTER ST | All Interior remodel with New Roof. No addition to the footprint or increase in house square footage. However a new roof will be added due to tree da | $190,000 | Daniel Besa | active |
| 80 | roofing | 2024-08-28 | AUSTIN | 1211 SAN BERNARD ST | **Partial demolition to east wall and partial of roof structure to accomodate new addition of 2-bedrooms 1-car garage and 1-car carport addition to ex | $214,000 | active | |
| 75 | roofing | 2026-10-27 | AUSTIN | 7013 HILLCROFT DR | INSTALLATION OF SOLAR PANELS ON THE ROOF OF THE HOME | John Harrell | active | |
| 75 | roofing | 2026-10-24 | AUSTIN | 5604 N SCOUT ISLAND CIR | Express: Replace roof (not going past decking) and gutters repairs due to water damage (insulation and drywall) | $1 | Ali Khan | active |
| 75 | roofing | 2026-10-21 | AUSTIN | 4905 CRESTWAY DR | Express: roof decking/fascia replacement | $1 | Jeffrey Jones | finaled |
| 75 | roofing | 2026-10-19 | AUSTIN | 4825 DAVIS LN BLDG 3 | Remove and replace shingles on existing roof shingle replacement only. | Brad Davis | active | |
| 75 | roofing | 2026-10-19 | AUSTIN | 9416 GAMBOL DR | Express: Installation of a 3.312 kW BIPV solar shingle system. Breaker tie-in. Shingles are nailed to the roof. This is a new construction home. | Jared Vaught | active | |
| 75 | roofing | 2026-10-19 | AUSTIN | 4825 DAVIS LN BLDG 1 | Remove and replace shingles on existing roof shingle replacement only. | Brad Davis | active | |
| 75 | roofing | 2026-10-19 | AUSTIN | 9416 GAMBOL DR | Express: Installation of a 3.312 kW BIPV solar shingle system. Breaker tie-in. Shingles are nailed to the roof. This is a new construction home. | $1 | Martin DeBono | active |
| 75 | roofing | 2026-10-19 | AUSTIN | 4825 DAVIS LN BLDG 2 | Remove and replace shingles on existing roof shingle replacement only. | Brad Davis | active | |
| 75 | roofing | 2026-10-19 | AUSTIN | 4825 DAVIS LN BLDG 4 | Remove and replace shingles on existing roof shingle replacement only. | Brad Davis | active | |
| 75 | roofing | 2026-10-19 | AUSTIN | 4825 DAVIS LN BLDG 5 | Remove and replace shingles on existing roof shingle replacement only. | Brad Davis | active | |
| 75 | roofing | 2026-10-19 | AUSTIN | 4825 DAVIS LN BLDG 6 | Remove and replace shingles on existing roof shingle replacement only. | Brad Davis | active | |
| 75 | roofing | 2026-10-19 | AUSTIN | 9420 GAMBOL DR | Express: Installation of a 3.68 kW BIPV solar shingle system. Breaker tie-in. Shingles are nailed to the roof. This is a new construction home. | $1 | Martin DeBono | active |
| 75 | roofing | 2026-10-19 | AUSTIN | 9420 GAMBOL DR | Express: Installation of a 3.68 kW BIPV solar shingle system. Breaker tie-in. Shingles are nailed to the roof. This is a new construction home. | Jared Vaught | active | |
| 75 | roofing | 2026-10-13 | AUSTIN | 306 W JOHANNA ST | Express: Fire Damage Drywall insulation cabinetry trim flooring roof repair HVAC plumbing electrical windows. | Eddie Guerrero | active | |
| 75 | roofing | 2026-10-12 | AUSTIN | 901 TRINITY ST | Re-roof: roof replacement replace 25000 SQ with TPO 10000 SQ metal panels. | Antonio Flores | active | |
| 75 | roofing | 2026-10-11 | AUSTIN | 7104 MC NEIL DR BLDG C | Replacement of any self-contained packaged units Replacement of Roof Top Packaged Unit Only. | Carlos Lopez | active | |
| 75 | roofing | 2026-10-08 | AUSTIN | 4825 DAVIS LN BLDG 8 | Remove and replace shingles on existing roof shingle replacement only. | Brad Davis | active | |
| 75 | roofing | 2026-10-08 | AUSTIN | 4825 DAVIS LN BLDG 10 | Remove and replace shingles on existing roof shingle replacement only. | Brad Davis | active | |
| 75 | roofing | 2026-10-08 | AUSTIN | 6501 SKINNER CV | Interior Remodel - Remodel 3 bathrooms remodel laundry room rolling in expired permit 2025-035956 BP scope - roof replacement new metal roof | $1 | Shea Spain | active |
| 75 | roofing | 2026-10-08 | AUSTIN | 4825 DAVIS LN BLDG 9 | Remove and replace shingles on existing roof shingle replacement only. | Brad Davis | active | |
| 75 | roofing | 2026-10-08 | AUSTIN | 4825 DAVIS LN BLDG 7 | Remove and replace shingles on existing roof shingle replacement only. | Brad Davis | active | |
| 75 | roofing | 2026-10-02 | AUSTIN | 1907 KENWOOD AVE UNIT A | Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit A: 3 bedroom 2 bath with front covered porch rear covered balcony and addition of foyer & HVAC closet. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT. | Joe R Maldonado | active | |
| 75 | roofing | 2026-05-28 | AUSTIN | 2010 ALAMEDA DR | AISD Travis Heights Elementary School in Austin: project involves roof replacement at the Pre K classrooms cafeteria and gym electrical panel cover re | Rafael Thrash | active | |
| 75 | roofing | 2026-05-15 | AUSTIN | 1712 E 11TH ST | The proposed work consists of the replacement of AHU-1 and AHU-3 with associated penthouse and roof curb replacement of RTU-1A 1B 1C 1D and 2A and ins | Michael Irwin | active | |
| 75 | roofing | 2026-05-04 | AUSTIN | 910 W 25TH ST | Fire Damage Remediation and Rebuild on 3 Floors Multiple units 210 505 506 605 606. Project will require Mechanical and Electrical Roof repaid with s | $4 | Jonathan Standley | active |
| 75 | roofing | 2026-05-04 | AUSTIN | 910 W 25TH ST | Fire Damage Remediation and Rebuild on 3 Floors Multiple units 210 505 506 605 606. Project will require Mechanical and Electrical Roof repaid with s | Raul Alonso | active | |
| 75 | roofing | 2026-03-23 | AUSTIN | 1509 WETHERSFIELD RD | Express: Fire damage repair 4/6/26 SM - REVISED**: Full interior remodel like for like. New roof New siding and sheathing New electrical plumbing a | $365,000 | Matthew Nelms | active |
| 75 | roofing | 2026-03-23 | AUSTIN | 1509 WETHERSFIELD RD | Express: Fire damage repair 4/6/26 SM - REVISED**: Full interior remodel like for like. New roof New siding and sheathing New electrical plumbing and mechanical. New windows | $365,000 | Urban Wolff | active |
| 75 | roofing | 2026-01-23 | AUSTIN | 7802 GINKGO CV | Express: Single roof replacement (located in WUI) | $41,923 | Chris Dammert | finaled |
| 75 | roofing | 2025-03-18 | AUSTIN | 6908 VILLITA AVENIDA | Express: siding replacement insulation window/door replacement (like for like) roof fascia drywall repair | $40,000 | Brenda Hernandez | finaled |
| 70 | roofing | 2026-10-22 | AUSTIN | 1208 E 52ND ST UNIT 110 | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | Eleazar R Trevino | active | |
| 70 | roofing | 2026-10-22 | AUSTIN | 1208 E 52ND ST UNIT 109 | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | Eleazar R Trevino | active | |
| 70 | roofing | 2026-10-22 | AUSTIN | 1208 E 52ND ST UNIT 108 | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | Eleazar R Trevino | active | |
| 70 | roofing | 2026-10-21 | AUSTIN | 1208 E 52ND ST UNIT 208 | 7 DAY - renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C) | HERIDO MORALES | active | |
| 70 | roofing | 2026-10-21 | AUSTIN | 1208 E 52ND ST UNIT 110 | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | HERIDO MORALES | active | |
| 70 | roofing | 2026-10-21 | AUSTIN | 1208 E 52ND ST UNIT 210 | 7 DAY - renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C) | HERIDO MORALES | active | |
| 70 | roofing | 2026-10-21 | AUSTIN | 1208 E 52ND ST UNIT 209 | 7 DAY - renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C) | HERIDO MORALES | active | |
| 70 | roofing | 2026-10-21 | AUSTIN | 1208 E 52ND ST UNIT 109 | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | HERIDO MORALES | active | |
| 70 | roofing | 2026-10-21 | AUSTIN | 1208 E 52ND ST UNIT 108 | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | HERIDO MORALES | active | |
| 70 | roofing | 2026-10-21 | AUSTIN | 600 CONGRESS AVE UNIT 3000 | REMODEL OF AN EXTERIOR ROOF DECK ON THE 30TH FLOOR - SCOPE INCLUDES REPLACEMENT OF EXTERIOR DOORS AND WINDOWS AND ROOFING STRUCTURAL REINFORCEMENT AND MODIFICATION OF EXISTING ELECTRICAL AND PLUMBING SYSTEMS. | Matt Dausch | active | |
| 70 | roofing | 2026-10-20 | AUSTIN | 1140 MASON AVE | *Partial Demo* Interior remodel and the permitting of a roof extension to main house. | Reynaldo Loredo | active | |
| 70 | roofing | 2026-10-20 | AUSTIN | 12008 SAXONY LN | Express: Remove and replace roof shingles as well as approximately 400 sq ft of decking between two slopes. Remove & replace windows with like for like sizes. Some siding & trim will also be removed & replaced on two elevations of the home. | $1 | GILBERT ALVAREZ | finaled |
| 70 | roofing | 2026-10-19 | AUSTIN | 1140 MASON AVE | *Partial Demo* Interior remodel and the permitting of a roof extension to main house. | Victor Martinez | active | |
| 70 | roofing | 2026-10-18 | AUSTIN | 8933 IVEANS CV | Addition/ remodel of 1 story SFR Construct a 455 SF addition and minor interior remodel including new foundation framing roofing drywall flooring cabinetry new electrical fixtures and wiring and new plumbing fixtures. No major demolition. | Omar Beltran | active | |
| 70 | roofing | 2026-08-18 | AUSTIN | 1851 WESTLAKE DR | ePlan: Residential Expedited Review - Remodel to Existing 2-Story Single Family Res. Work to include interior remodel Replace Deck. all new doors and windows replace roof | active | ||
| 70 | roofing | 2026-07-15 | AUSTIN | 7603 RUSTLING CIR | ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 2.5bath] Work to include: First floor Interior remodel First Floor Addition new roof new beds new baths [5bed 3.5bath]. | $1 | Tony Diaz | active |
| 70 | roofing | 2026-07-13 | AUSTIN | 7603 RUSTLING CIR | ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 2.5bath] Work to include: First floor Interior remodel First Floor Addition new roof new beds new baths [5bed 3.5bath]. | Hung Pham | active | |
| 70 | roofing | 2026-07-13 | AUSTIN | 7603 RUSTLING CIR | ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 2.5bath] Work to include: First floor Interior remodel First Floor Addition new roof new beds new baths [5bed 3.5bath]. | Hung Pham | active | |
| 70 | roofing | 2026-06-04 | AUSTIN | 2507 WESTLAKE DR | Minor construction limited to maintenance/replacement of an existing shoreline access approx.240 sqft of ground-level boardwalks. There will be no increase in the existing footprint of the dock bulkhead or shoreline access. **Replacement of metal roof resurface 2nd floor deck and replace treads on existing stairs. The area of the roof and deck will remain unchanged. Some plywood decking will need replacement. No structural modifications. No expansion of footprint. No disturbing of shoreline or lakebed. Add replacement or repair of hydraulic lift. | $25,000 | Robert Depwe | finaled |
| 70 | roofing | 2026-05-21 | AUSTIN | 4205 RAMSEY AVE | Renovate existing 1-story ADU: Replace windows doors siding & roofing. Update MEP. Reconfigure floor plan/plumbing locations. Replace foundation in | $1 | Bijan Nayebi | active |
| 65 | roofing | 2026-10-29 | AUSTIN | 1801 E 38TH HALF ST | Re-Roof of metal R-panel roof system and replacing with a metal R-panel roof system (same color as existing). No structural or insulation improvements. | Andre Calixto | active | |
| 65 | roofing | 2026-10-28 | AUSTIN | 10733 CHESTNUT RIDGE RD | Express: Replace roof (not going past decking) | $1 | Bryan Swimm | active |
| 65 | roofing | 2026-10-27 | AUSTIN | 2310 PATSY PKWY | Addition to the back of existing structure. The addition will add 3 bedrooms a hallway and one full bathroom. Roof will be extended and a 100sf uncovered patio is added in the back. Upgrade electrical main panel and add sub panel for the new addition | $1 | Adnan Suleiman | active |
| 65 | roofing | 2026-10-26 | AUSTIN | 803 AZIE MORTON RD | Express - Reroof | $1 | Stephen Moffitt | active |
| 65 | roofing | 2026-10-26 | AUSTIN | 10720 SYCAMORE HILLS RD | Express - Reroof Only | $1 | Michael Vela | finaled |
| 65 | roofing | 2026-10-26 | AUSTIN | 2207 HANCOCK DR | remove membrane layover and modified built up install 3 iso board and .60 mil tpo roofing system (Building has r24 paper backed insulation installed between rafters). | Chad Robinson | active | |
| 65 | roofing | 2026-10-26 | AUSTIN | 2811 DEL CURTO RD BLDG C | Express - Reroof and siding | $1 | Lior Shaked | active |
| 65 | roofing | 2026-10-26 | AUSTIN | 9730 ANCHUSA TRL | Detached shed/garage for trailer storage and workshop. It will be a steel bldg 24 ft x 30 ft 10 ft side ht with a 3/12 roof pitch. Vertical roof/siding. The foundation will be concrete and electricity will be run to the structure-est. 40-50 amp. No water/plumbing. | $0 | William Fox | active |
| 65 | roofing | 2026-10-26 | AUSTIN | 4705 TWIN VALLEY DR | Express: Reroof down to deck and replace with like color using GAF UHDZ Timberline Weathered Wood (Class A) materials for all components just replacing the roof accordingly Austin City WUI compliance. | $1 | Stephen Moffitt | active |
| 65 | roofing | 2026-10-25 | AUSTIN | 11129 COMISO PALA PATH | Express: Re-roof (located in WUI) | $1 | Stacie Feller | active |
| 65 | roofing | 2026-10-23 | AUSTIN | 3801 RED RIVER ST | Bathroom addition to existing 1-story single family residence. New bath includes 2 sinks 1 wc 1 shower new windows new framing new siding new foundation and roof. 3 bed/2 bath | Vanessa Vega | active | |
| 65 | roofing | 2026-10-23 | AUSTIN | 8521 FULBRIGHT LN | Add concrete footers under existing concrete patio build a new gable roof tying into existing roof add two can lights and one ceiling fan tie into existing gutters and add two downspouts. Detailed description of work is attached. | $1 | Vivienne Bennett | active |
| 65 | roofing | 2026-10-22 | AUSTIN | 610 E STASSNEY LN UNIT B | Clean off existing roof of dirt dust and debris then apply liquid maintenance coating to existing roof. | Alex Simon | active | |
| 65 | roofing | 2026-10-22 | AUSTIN | 16013 N IH 35 SVRD NB | Overlay existing roof with Duro-Last. No tear-off or structural alterations. Existing garage. | Ken Wells | active | |
| 65 | roofing | 2026-10-21 | AUSTIN | 8840 BUSINESS PARK DR | TPO Roof Overlay | Matthew Lamz | active | |
| 65 | roofing | 2026-10-21 | AUSTIN | 1200 E 52ND ST | Tear off and replace a TPO roof with a new TPO roof. Existing multifamily building. | Matthew Lamz | active | |
| 65 | roofing | 2026-10-21 | AUSTIN | 2036 CENTIMETER CIR | Removing the existing roofing assembly down to the substrate repairing any damaged structural decking and installing new code-compliant rigid insulation and cover board. | Heath Talley | active | |
| 65 | roofing | 2026-10-21 | AUSTIN | 8900 BUSINESS PARK DR | TPO ROOF OVERLAY | Matthew Lamz | active | |
| 65 | roofing | 2026-10-20 | AUSTIN | 5903 BURROUGH DR | Addition extend roof canopy over patio slab | James D. Dougherty | active | |
| 65 | roofing | 2026-10-20 | AUSTIN | 305 E HUNTLAND DR | TPO Roofing System - Full Tear-Off & Replacement | Nathan Navarro | active | |
| 65 | roofing | 2026-10-19 | AUSTIN | 4825 DAVIS LN | remove and replace shingles on existing roof of leasing building. | Brad Davis | active | |
| 65 | roofing | 2026-10-19 | AUSTIN | 8617 PEAFOWL ST | *Green Building* New 2-story 5 bedroom 4 bathroom single family residence with attached garage covered front porch and rear covered patio. Revision 1: Changed roof pitch to 5:12. Changed all side and rear to stucco. Changed stone rowlock to stucco cap. Lowered porch towner and expanded front porch footprint. | William B. Crist Jr. | active | |
| 65 | roofing | 2026-10-16 | AUSTIN | 6301 E STASSNEY LN BLDG 8 | TPO Roof Overlay. Adding 1/2 Coverboard and TPO Membrane over Existing Roof. Existing warehouse. | Griffin Glaude | active | |
| 65 | roofing | 2026-10-16 | AUSTIN | 6301 E STASSNEY LN BLDG 9 | TPO Roof Overlay. Adding 1/2 Coverboard and TPO Membrane over Existing Roof. | Griffin Glaude | active | |
| 65 | roofing | 2026-10-16 | AUSTIN | 3210 HILLBILLY LN | Partial demolition to remove roof and carport of existing single story accessory office building. Interior remodel of existing space. | $0 | Hugo Reynolds | active |
| 65 | roofing | 2026-10-16 | AUSTIN | 2905 OAK CREST AVE | 5.28 kW roof mounted solar electric system | Mark Pride | active | |
| 65 | roofing | 2026-10-15 | AUSTIN | 3909 CORDOVA DR | Express- WUI Zone C Reroofing with Class A Fire roofing material- Owens Corning Duration shingles and underlayment mesh-in ventilation | $1 | Fareed Tulbah | active |
| 65 | roofing | 2026-10-15 | AUSTIN | 4711 CRESTWAY DR | Addition: Re-roofing existing front porch with new porch addition. Revision 01 to add EP and PP | Willie Rivera | active |
100 rows shown