Permits
2,003 permits • page 9 of 21
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 55 | solar | 2024-05-08 | AUSTIN | 11100 SLAUGHTER CREEK DR | Install new 11.455kW rooftop solar system for existing residential only | Adrian Buck | finaled | |
| 55 | solar | 2024-05-08 | AUSTIN | 6901 JESTER WILD DR | Install new 13.5kW energy storage system for existing residential only. This is in addition to an existing solar system. | Adrian Buck | finaled | |
| 55 | solar | 2024-05-07 | AUSTIN | 3607 PINNACLE RD UNIT 3 | Install new 13.44 KWDC/ 11.50 KWAC rooftop solar system servicing existing residential only. 2 11.50 KWDC Powerwall3 ESS. Line side tap. | Frederico Lopez | finaled | |
| 55 | solar | 2024-05-06 | AUSTIN | 5504 ARBOR ASH CT | Install new 8.69kW rooftop solar system for existing residential only | Adrian Buck | finaled | |
| 55 | solar | 2024-05-06 | AUSTIN | 6005 BROKEN SPOKE TRL | Faulk - Install new _8.8__kW rooftop solar system to existing residential only using line side tap. | Mark Bedell | finaled | |
| 55 | solar | 2024-05-06 | AUSTIN | 4905 WOODROW AVE UNIT A | Install new 15.800kW rooftop solar system for existing residential only. | Adrian Buck | finaled | |
| 55 | solar | 2024-05-06 | AUSTIN | 1700 NEWNING AVE | Install new 5.925kW rooftop solar system for existing residential only. | Adrian Buck | finaled | |
| 50 | solar | 2026-04-23 | AUSTIN | 3601 BLUESTEIN DR | Install new 17.00 KW rooftop solar system | Adrian Buck | active | |
| 50 | solar | 2026-04-22 | AUSTIN | 900 SPRINGDALE RD | Install a pergola with solar panels attached to the top | Jeffrey Shed | active | |
| 50 | solar | 2026-04-03 | AUSTIN | 9409 GLADSOME PATH | Install new 7.29 KWDC rooftop solar system servicing new residential only. Bluebonnet | Frederico Lopez | active | |
| 50 | solar | 2026-03-05 | AUSTIN | 16816 WIND CHIME DR | install new 5.72 KWDC rooftop solar system servicing new residential only. Bluebonnet | Frederico Lopez | active | |
| 50 | solar | 2026-02-27 | AUSTIN | 17116 WIND CHIME DR | Install new 7.79 KWDC rooftop solar system servicing new residential only Blu Bonnet | Frederico Lopez | active | |
| 50 | solar | 2026-02-27 | AUSTIN | 9513 GLADSOME PATH | Install new 7.48 kwdc rooftop solar system servicing new residential only Blue Bonnet | Frederico Lopez | active | |
| 50 | solar | 2026-02-26 | AUSTIN | 17221 ASTRAL LN | Install new 5.33 kwdc rooftop solar system servicing new residential only. Bluebonnet | Frederico Lopez | finaled | |
| 50 | solar | 2026-02-23 | AUSTIN | 4614 SEA SALT DR | Install new 3.8kW rooftop solar system to existing residential only using backfed breaker only. | Mark Bedell | finaled | |
| 50 | solar | 2026-02-06 | AUSTIN | 6805 CANNONLEAGUE DR | Gallardo - 39-34568 - Install new 3.8kW rooftop solar system to existing residential only using backfed breaker only. | Mark Bedell | finaled | |
| 50 | solar | 2026-02-03 | AUSTIN | 10502 GEORGIAN DR | Install new 3.8kW rooftop solar system to existing residential only using LINE SIDE TAP ONLY | Mark Bedell | finaled | |
| 50 | solar | 2026-01-26 | AUSTIN | 5211 GUADALUPE ST | Install new 6.16 kW DC rooftop solar system to existing residential | Mark Pride | finaled | |
| 50 | solar | 2026-01-26 | AUSTIN | 9113 GEORGIAN DR | Install new 13.64 kW DC rooftop solar system to existing residential | Mark Pride | finaled | |
| 50 | solar | 2026-01-15 | AUSTIN | 4113 IDLEWILD RD | Install new roof-mounted solar system and energy storage system to existing single family residence. Overhead AE | Wesley Davis | finaled | |
| 50 | solar | 2025-12-19 | AUSTIN | 11117 OLD LOCKHART RD UNIT A | Salinas 39-14279 - Install new 10kW rooftop solar system to existing residential only using line side tap. | Mark Bedell | finaled | |
| 50 | solar | 2025-12-19 | AUSTIN | 707 E MONROE ST BLDG 2 | Install new 5.52 kW DC rooftop solar system and 15.0 kWh energy storage system to existing residential | Mark Pride | finaled | |
| 50 | solar | 2025-12-05 | AUSTIN | 2108 TILLERY ST UNIT 2104 | Installing a generator interlock kit on the indoor laundry room panel to connect a portable battery backup system. Work includes converting the existi | active | ||
| 50 | solar | 2025-12-01 | AUSTIN | 4900 MUELLER BLVD | we are replacing damaged solar water heating panels on the dells childrens hospital the previous damage was by hail stones | Justin Spaulding | finaled | |
| 50 | solar | 2025-11-26 | AUSTIN | 1801 ALAMEDA DR UNIT 3 | Install new 8.28 kW DC rooftop solar system to existing residential | Mark Pride | finaled | |
| 50 | solar | 2025-11-26 | AUSTIN | 9421 GLADSOME PATH | Install new 5.20 kwdc rooftop solar system servicing new residential only. Bluebonnet | Frederico Lopez | finaled | |
| 50 | solar | 2025-11-21 | AUSTIN | 3910 AVENUE H | Install new 14.72 kW DC rooftop solar system to existing residential | Mark Pride | finaled | |
| 50 | solar | 2025-11-21 | AUSTIN | 1106 CRIPPLE CREEK DR | Install new 7.650 kw rooftop solar system and 13.5kw energy storage system for existing residential only. | Adrian Buck | finaled | |
| 50 | solar | 2025-11-20 | AUSTIN | 7506 SHERWOOD RD | Install new 3.915 kw rooftop solar system and 13.5kw energy storage system for existing residential only. | Adrian Buck | finaled | |
| 50 | solar | 2025-11-17 | AUSTIN | 1301 BARBARA JORDAN BLVD UNIT 301 | Install new modules and return wiring to low voltage. Repair pre-existing solar system damaged by hail. | Bryan Meklir | active | |
| 50 | solar | 2025-11-12 | AUSTIN | 6109 TWIN LEDGE DR | Install new 16.10 kW DC rooftop solar system and 10.0 kWh energy storage system to existing residential | Mark Pride | finaled | |
| 50 | solar | 2025-11-10 | AUSTIN | 5304 SAMUEL HUSTON AVE BLDG 1 | Install new 6.090 kw rooftop solar system and 13.5kw energy storage system for existing residential only. | Adrian Buck | finaled | |
| 50 | solar | 2025-11-05 | AUSTIN | 5304 SAMUEL HUSTON AVE BLDG 2 | Install new 5.220 kw rooftop solar system and 13.500kw energy storage system for existing residential only. | Adrian Buck | finaled | |
| 50 | solar | 2025-10-22 | AUSTIN | 2507 LAKEHURST DR | Remove solar panels & reinstall due to fire damage. | Eduardo Martell | finaled | |
| 50 | solar | 2025-10-03 | AUSTIN | 2208 ZACH SCOTT ST | Install new 6.800 kw rooftop solar system and 13.5 kw energy storage system for existing residential only. | Adrian Buck | finaled | |
| 50 | solar | 2025-09-26 | AUSTIN | 4924 SEA SALT DR | Install new 9.775 kw rooftop solar system for existing residential only. | Adrian Buck | finaled | |
| 50 | solar | 2025-09-26 | AUSTIN | 2512 BROKEN OAK DR | Install new 5.655 kw rooftop solar system for existing residential only. | Adrian Buck | finaled | |
| 50 | solar | 2025-09-24 | AUSTIN | 10700 FULTON AVE | Install new roof-mounted solar system and energy storage system to existing single family residence. Underground AE | Wesley Davis | finaled | |
| 50 | solar | 2025-09-23 | AUSTIN | 1131 LOTT AVE | Install new 7.830 kw rooftop solar system for existing residential only. | Adrian Buck | finaled | |
| 50 | solar | 2025-09-15 | AUSTIN | 9505 GLADSOME PATH | Install new 5.60 kwdc rooftop solar system servicing new residential only | Frederico Lopez | finaled | |
| 50 | solar | 2025-08-29 | AUSTIN | 10508 FULTON AVE | Install new 8.28 kW DC rooftop solar system to existing residential | Mark Pride | finaled | |
| 50 | solar | 2025-08-28 | AUSTIN | 9728 GLADSOME PATH | Install new 5.26WDC rooftop solar system servicing new residential only. Bluebonnet utility | Frederico Lopez | finaled | |
| 50 | solar | 2025-08-21 | AUSTIN | 5016 SEA SALT DR | Install new 7.65 kw rooftop solar system for existing residential only. | Adrian Buck | finaled | |
| 50 | solar | 2025-08-15 | AUSTIN | 9717 GLADSOME PATH | Install new 5.20KWDC rooftop solar system servicing new residential only. Bluebonnet utility. | Frederico Lopez | finaled | |
| 50 | solar | 2025-08-14 | AUSTIN | 12102 CEARLEY DR | Install new roof-mounted solar system and energy storage system to existing single family residence. Underground AE | Wesley Davis | finaled | |
| 50 | solar | 2025-08-07 | AUSTIN | 4101 1/2 AVENUE H | Install (new) 5.66 kW DC rooftop solar system to existing residential | Mark Pride | finaled | |
| 50 | solar | 2025-08-06 | AUSTIN | 1111 VARGAS RD | Install new 5.53kW rooftop solar system to existing residential only using a line side tap. | Mark Bedell | finaled | |
| 50 | solar | 2025-08-06 | AUSTIN | 11208 THORNY BROOK TRL | Non-Austin Energy Solar install - PEC Subpanel replacement | John Harrell | finaled | |
| 50 | solar | 2025-07-28 | AUSTIN | 7212 HILLCROFT DR | Install new 11.4kW rooftop solar system to existing residential only using a line side tap. | Mark Bedell | finaled | |
| 50 | solar | 2025-07-24 | AUSTIN | 8627 THUNDERBIRD RD | Install new 7.225 kw rooftop solar system and 13.5 kw energy storage system for existing residential only. | Adrian Buck | finaled | |
| 50 | solar | 2025-06-26 | AUSTIN | 1221 BICKLER RD | Replacement of complete existing central heat and air system with or without duct work GE 4.0 Ton 18.0 SEER2 Connect Series Side-Discharge Inverter He | Charles Belote | finaled | |
| 50 | solar | 2025-06-26 | AUSTIN | 9902 DUELING OAK CIR | Replacement of complete existing central heat and air system with or without duct work GE 5.0 Ton 17.0 SEER2 Connect Series Side-Discharge Inverter He | Charles Belote | finaled | |
| 50 | solar | 2025-06-23 | AUSTIN | 1412 VALLEYRIDGE DR | Install new 6.800 kW DC kw rooftop solar system for existing residential only. | Adrian Buck | finaled | |
| 50 | solar | 2025-04-17 | AUSTIN | 2708 PARAGON FOX DR | Install new 12.18 kW rooftop solar system to existing residential | Mark Pride | finaled | |
| 50 | solar | 2025-02-20 | AUSTIN | 6811 HILLCROFT DR | WOODS - Install new _8.4__kW rooftop solar system to existing residential only using line side tap. | Mark Bedell | finaled | |
| 50 | solar | 2025-02-03 | AUSTIN | 10200 PARKFIELD DR | We plan to install a 10.35kW solar system on the residential property. | Joshua Collins | finaled | |
| 50 | solar | 2025-01-21 | AUSTIN | 11309 SENTINEL DR | ALLEN/STEADMAN - Install new _6.4__kW rooftop solar system to existing residential only using backfed breaker. | Mark Bedell | finaled | |
| 50 | solar | 2025-01-10 | AUSTIN | 9316 GLADSOME PATH | Install new 4.07 KWDC rooftop solar system servicing new residential only | Frederico Lopez | finaled | |
| 50 | solar | 2025-01-10 | AUSTIN | 9320 GLADSOME PATH | Install new 4.81 KWDC rooftop solar system servicing new residential only | Frederico Lopez | finaled | |
| 50 | solar | 2025-01-08 | AUSTIN | 9312 GLADSOME PATH | Install new 5.18 KWDC rooftop solar system servicing new residential only. Bluebonnet utility. | Frederico Lopez | finaled | |
| 50 | solar | 2024-12-10 | AUSTIN | 16909 VERNAL RD | Install new 4.81 KWDC rooftop solar system servicing new residential only. Bluebonnet utility. | Frederico Lopez | finaled | |
| 50 | solar | 2024-12-10 | AUSTIN | 17201 VERNAL RD | Install new 4.81 KWDC rooftop solar system servicing new residential only. Bluebonnet utility. | Frederico Lopez | finaled | |
| 50 | solar | 2024-11-20 | AUSTIN | 811 N TUMBLEWEED TRL | Install new 23.375kW rooftop solar system for residential only. | Adrian Buck | finaled | |
| 50 | solar | 2024-11-04 | AUSTIN | 17108 VERNAL RD | residential solar system on new home build (no battery) | Phillip Hensley | finaled | |
| 50 | solar | 2024-10-22 | AUSTIN | 17112 VERNAL RD | New solar system installation for new residential home build - Bluebonnet Utility | Phillip Hensley | finaled | |
| 50 | solar | 2024-10-15 | AUSTIN | 900 S 2ND ST BLDG 23 | Install new 4.00 KWDC rooftop solar system servicing new residential only. | Frederico Lopez | finaled | |
| 50 | solar | 2024-10-15 | AUSTIN | 11307 SENTINEL DR | Install new 6.970kW rooftop solar system for existing residential only. | Adrian Buck | finaled | |
| 50 | solar | 2024-10-15 | AUSTIN | 900 S 2ND ST BLDG 22 | Install new 4.00 KWDC rooftop solar system servicing new residential only. | Frederico Lopez | finaled | |
| 50 | solar | 2024-10-02 | AUSTIN | 13207 LAMPLIGHT VILLAGE AVE | Padilla - Install new _6.4__kW rooftop solar system to existing residential only using line side tap. | Mark Bedell | finaled | |
| 50 | solar | 2024-10-01 | AUSTIN | 10901 RUNNING BUCK LN | Install new/additional _7.2__kW rooftop solar system to existing residential only using line side tap. Utility company - __PEC___ | Mark Bedell | finaled | |
| 50 | solar | 2024-09-17 | AUSTIN | 16905 VERNAL RD | Install 5.18 KWDC rooftop solar system servicing new residential only. Bluebonnet utility. | Frederico Lopez | finaled | |
| 50 | solar | 2024-09-05 | AUSTIN | 9725 GLADSOME PATH | Install new 6.66 KWDC rooftop solar system servicing new residential only. Bluebonnet electric. | Frederico Lopez | finaled | |
| 50 | solar | 2024-08-28 | AUSTIN | 4612 RED RIVER ST | Install new 17.48kW rooftop solar system for existing residential only. | Adrian Buck | finaled | |
| 50 | solar | 2024-08-26 | AUSTIN | 13609 ZINK BND | Install new roof-mounted solar and energy storage system to existing single family residence. | Wesley Davis | finaled | |
| 50 | solar | 2024-08-21 | AUSTIN | 2604 SCHWARTZ LN | new solar system installation for new residential home build | Phillip Hensley | finaled | |
| 50 | solar | 2024-08-12 | AUSTIN | 2521 SCHWARTZ LN | new solar system installation for new residential home build | Phillip Hensley | finaled | |
| 50 | solar | 2024-08-05 | AUSTIN | 2600 SCHWARTZ LN | new solar system installation for new residential home build | Phillip Hensley | finaled | |
| 50 | solar | 2024-08-05 | AUSTIN | 2509 SCHWARTZ LN | new solar system installation for new residential home build | Phillip Hensley | finaled | |
| 50 | solar | 2024-08-05 | AUSTIN | 2513 SCHWARTZ LN | new solar system installation for new residential home build | Phillip Hensley | finaled | |
| 50 | solar | 2024-08-05 | AUSTIN | 2512 SCHWARTZ LN | new solar system installation for new residential home build | Phillip Hensley | finaled | |
| 50 | solar | 2024-08-05 | AUSTIN | 2520 SCHWARTZ LN | new solar system installation for new residential home build | Phillip Hensley | finaled | |
| 50 | solar | 2024-08-05 | AUSTIN | 2501 SCHWARTZ LN | new solar system installation for new residential home build | Phillip Hensley | finaled | |
| 50 | solar | 2024-08-05 | AUSTIN | 2517 SCHWARTZ LN | new solar system installation for new residential home build | Phillip Hensley | finaled | |
| 50 | solar | 2024-08-05 | AUSTIN | 2605 SCHWARTZ LN | new solar system installation for new residential home build | Phillip Hensley | finaled | |
| 50 | solar | 2024-08-05 | AUSTIN | 2609 SCHWARTZ LN | new solar system installation for new residential home build | Phillip Hensley | finaled | |
| 50 | solar | 2024-08-05 | AUSTIN | 2505 SCHWARTZ LN | new solar system installation for new residential home build | Phillip Hensley | finaled | |
| 50 | solar | 2024-08-02 | AUSTIN | 16913 VERNAL RD | Install new 5.55 KWDC rooftop solar system servicing new residential only. Bluebonnet utility | Frederico Lopez | finaled | |
| 50 | solar | 2024-08-02 | AUSTIN | 9716 GLADSOME PATH | Install new 5.55 KWDC rooftop solar system servicing new residential only. Bluebonnet utility | Frederico Lopez | finaled | |
| 50 | solar | 2024-07-30 | AUSTIN | 2601 SCHWARTZ LN | new solar system installation for new residential home build | Phillip Hensley | finaled | |
| 50 | solar | 2024-07-09 | AUSTIN | 910 W ELIZABETH ST | Residential Solar installation of an 8.4 kw rooftop solar system and a 20 kWh battery backup system. | Eric Kay | finaled | |
| 50 | solar | 2024-07-09 | AUSTIN | 3300 MANOR RD | Installation of Auxillary Power System including 3 solar shade structures | finaled | ||
| 50 | solar | 2024-07-08 | AUSTIN | 2608 SCHWARTZ LN | new solar system installation for new residential home build | Phillip Hensley | finaled | |
| 50 | solar | 2024-07-08 | AUSTIN | 2616 SCHWARTZ LN | New solar system installation for new resdiential home build | Phillip Hensley | finaled | |
| 50 | solar | 2024-07-03 | AUSTIN | 6612 ALLEYTON DR | Install new 5.10kW rooftop solar system for existing residential only. This is in addition to an existing solar system | Adrian Buck | finaled | |
| 50 | solar | 2024-06-28 | AUSTIN | 7316 HILLCROFT DR | residential 28 solar panel installation on home | Josef Hernandez | finaled | |
| 50 | solar | 2024-06-25 | AUSTIN | 8404 AMBERGILL CT | Install new 12 KW rooftop solar system to existing residential only. | Eric Hoffman | finaled | |
| 50 | solar | 2024-06-14 | AUSTIN | 14408 KOTI WAY | New Solar system installation for new residential home build. | Phillip Hensley | finaled | |
| 50 | solar | 2024-05-09 | AUSTIN | 13008 DIONYSUS DR | Ridge - Install new _7.2__kW rooftop solar system to existing residential only using backfed breaker. | Mark Bedell | finaled | |
| 45 | solar | 2026-04-17 | AUSTIN | 10610 SIERRA OAKS | Disconnect and reconnect meter to install battery backup. Aux Electrical Permit #: 2026-043420 EP | Martin Rodriguez | finaled | |
| 45 | solar | 2026-04-17 | AUSTIN | 3201 CATALINA DR | Installing (1) Tesla PW3 Battery and a Main Panel Upgrade (SPAN). | Michael Solano | finaled |