Permits
2,211 permits • page 8 of 23
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 45 | roofing | 2026-03-26 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 7 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-03-25 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | Monty Lamb | active | |
| 45 | roofing | 2026-03-18 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 6 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-02-25 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 5 | TPO Roof Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-02-19 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | Colton Conklin | active | |
| 45 | roofing | 2026-02-19 | AUSTIN | 905 CONGRESS AVE | Restoration of interior finishes and millwork due to fire/water damage. Include replacement of damaged roofing skylights and rooftop equipment. | George Picken | active | |
| 45 | roofing | 2026-02-18 | AUSTIN | 905 CONGRESS AVE | Restoration of interior finishes and millwork due to fire/water damage. Include replacement of damaged roofing skylights and rooftop equipment. | Tu Huynh | active | |
| 45 | roofing | 2026-02-18 | AUSTIN | 905 CONGRESS AVE | Restoration of interior finishes and millwork due to fire/water damage. Include replacement of damaged roofing skylights and rooftop equipment. | Scott Schenk | active | |
| 45 | roofing | 2026-01-06 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | Tad Perkin | active | |
| 45 | roofing | 2025-12-31 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | $1 | Tres Davis | active |
| 45 | roofing | 2025-12-02 | AUSTIN | 701 CONGRESS AVE | Roof replacement - TPO | David Bernal | active | |
| 45 | roofing | 2025-11-20 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 4 | TPO Roof Replacement | Brad Davis | finaled | |
| 45 | roofing | 2025-11-06 | AUSTIN | 2406 BROKEN OAK DR | Express: Re-roof 2800 SqFt decking removal and replacement | $1 | Tyler Beal | active |
| 45 | roofing | 2025-09-15 | AUSTIN | 7601 BURNET RD | Roof Replacement for St. Louis Catholic Church | Steven Sartory | active | |
| 45 | roofing | 2025-08-28 | AUSTIN | 4330 BULL CREEK RD | Asphalt shingle roof replacement | Chris Macias | finaled | |
| 45 | roofing | 2025-08-27 | AUSTIN | 5010 OLD MANOR RD | Roof Replacement for City Office Building | Holly Zihlman | finaled | |
| 45 | roofing | 2025-08-18 | AUSTIN | 5440 BURNET RD | Non-structural re-roof like-for-like replacement only. | Cameron Smith | finaled | |
| 45 | roofing | 2025-07-24 | AUSTIN | 727 AIRPORT BLVD | Roof Replacement: Flute Fill and TPO Membrane over Existing Office/Warehouse | Michael Kastel | finaled | |
| 45 | roofing | 2025-07-24 | AUSTIN | 729 AIRPORT BLVD | Roof Replacement: Flute Fill and TPO Membrane over Existing Office/Warehouse | Michael Kastel | finaled | |
| 45 | roofing | 2025-07-14 | AUSTIN | 3613 BLUESTEIN DR | TPO Roof Replacement | David Bernal | finaled | |
| 45 | roofing | 2025-06-18 | AUSTIN | 600 CONGRESS AVE UNIT 3000 | REMODEL OF AN EXTERIOR ROOF DECK ON THE 30TH FLOOR - SCOPE INCLUDES REPLACEMENT OF EXTERIOR DOORS AND WINDOWS AND ROOFING STRUCTURAL REINFORCEMENT AND | Jesse Beckett | finaled | |
| 45 | roofing | 2025-06-18 | AUSTIN | 600 CONGRESS AVE UNIT 3000 | REMODEL OF AN EXTERIOR ROOF DECK ON THE 30TH FLOOR - SCOPE INCLUDES REPLACEMENT OF EXTERIOR DOORS AND WINDOWS AND ROOFING STRUCTURAL REINFORCEMENT AND | Erik Christiansen | finaled | |
| 45 | roofing | 2025-06-17 | AUSTIN | 600 CONGRESS AVE UNIT 3000 | REMODEL OF AN EXTERIOR ROOF DECK ON THE 30TH FLOOR - SCOPE INCLUDES REPLACEMENT OF EXTERIOR DOORS AND WINDOWS AND ROOFING STRUCTURAL REINFORCEMENT AND | Matt Dausch | active | |
| 45 | roofing | 2025-06-12 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | NATHAN DOELITSCH | finaled | |
| 45 | roofing | 2025-06-09 | AUSTIN | 6106 ROSS RD BLDG 2 | Bldg 2 - Repair broken gas line on roof due to storm damage | David L Kinney | finaled | |
| 45 | roofing | 2025-06-09 | AUSTIN | 6106 ROSS RD BLDG 1 | Bldg 1 - Repair broken gas line on roof due to storm damage | David L Kinney | finaled | |
| 45 | roofing | 2025-06-04 | AUSTIN | 1702 GILES ST | Emergency Permit from Storm Damage. Tree has fallen on power line and Austin Energy has cut power. ***Storm Related-Emergency inspection done on 6/3/ | William John Morris III | finaled | |
| 45 | roofing | 2025-06-02 | AUSTIN | 1428 WEBBERVILLE RD | Emergency (Storm Damage) - Service Replacement ***Storm Related-Emergency inspection done on 5/30/35. ESPA is required.-Hyatt*** | Benjamin Hubbard | finaled | |
| 45 | roofing | 2025-05-30 | AUSTIN | 1149 WEBBERVILLE RD | Emergency due to thunderstorm Emergency permit to replace riser only due to damaged by fallen tree. ***Emergency Inspection-Storm Damage-done on 5/29 | John Coppin | finaled | |
| 45 | roofing | 2025-05-29 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | Jerome Bell | finaled | |
| 45 | roofing | 2025-04-01 | AUSTIN | 8200 CAMERON RD BLDG B | Roof replacement | Holly Zihlman | finaled | |
| 45 | roofing | 2025-04-01 | AUSTIN | 8200 CAMERON RD BLDG A | Roof replacement | Holly Zihlman | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 10 | Roof Replacement for Building 10 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 12 | Roof Replacement for Building 12 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 1 | Roof Replacement for Building 1 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 9 | Roof Replacement for Building 9 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 11 | Roof Replacement for Building 11 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 13 | Roof Replacement for Building 13 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 8 | Roof Replacement for Building 8 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 2 | Roof Replacement for Building 2 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG E | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building E | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG C | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building C | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG K | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building K | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG A | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building A | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG H | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building H | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-03 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | Jacob Hussa | finaled | |
| 45 | roofing | 2025-01-23 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | $1 | Jacob Hussa | finaled |
| 45 | roofing | 2024-11-11 | AUSTIN | 6710 BURNET RD | Change of use from vehicle sales to vehicle rental. New CO no construction or change to the building profile. Potential roof replacement from hail dam | Cody Sprinkle | finaled | |
| 45 | roofing | 2024-10-18 | AUSTIN | 2219 MANOR RD | Mechanically attach new .60 mil. TPO over existing hail damage modified. No structural changes. | Daniel McCoy | finaled | |
| 45 | roofing | 2024-09-30 | AUSTIN | 607 RED RIVER ST | Roof Replacement | Molly Johnston | finaled | |
| 45 | roofing | 2024-09-12 | AUSTIN | 8733 BURNET RD | Roof Replacement to existing Retail Building | Molly Johnston | finaled | |
| 45 | roofing | 2024-08-13 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | David Paone | finaled | |
| 45 | roofing | 2024-07-03 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | Keating Kuhn | finaled | |
| 45 | roofing | 2024-07-03 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | David Demoss | finaled | |
| 45 | roofing | 2024-06-17 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | $1 | Cameron Treme | finaled |
| 45 | roofing | 2024-06-11 | AUSTIN | 3811 AIRPORT BLVD | Replacement of TPO roof system. New system to meet IECC minimum requirements of R-25. | Steven Sartory | finaled | |
| 45 | roofing | 2024-05-28 | AUSTIN | 6205 BURNET RD | Replace existing TPO membrane from hail damage april 9 2024. Remove existing .60 mil. TPO and replace with new .60 mil. TPO using TPO bonding adhesive | Daniel McCoy | finaled | |
| 40 | roofing | 2026-04-21 | AUSTIN | 10819 HERMOSILLO DR | BLDG 2 - UNIT A (UNIT 1001 - 1007) WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS AND A ROOF TOP PATIO. | Seth Robinson | finaled | |
| 40 | roofing | 2026-04-17 | AUSTIN | 1023 E RIVERSIDE DR | Demo of existing roof and walls - Install new beam above garage doorway. Proposed building of a 2 Tier Deck above garage. Minor plumbing and electrica | $1 | Lior Shaked | active |
| 40 | roofing | 2026-04-14 | AUSTIN | 2413 WARE RD | Express: Repair and replace rotted and damaged roof and decking Revision-replacing rotten wood siding with cement fiberboard siding and replacing fro | $1 | Daniel Montanez | active |
| 40 | roofing | 2026-04-07 | AUSTIN | 8615 WINDING WALK | Express: repairing the roof and replacing the decking | $1 | Hunter Maloy | active |
| 40 | roofing | 2026-04-06 | AUSTIN | 809 LYDIA ST | Exterior repair new windows and doors (none extant) new roof structural repairs and prep for future tenant finish-out. Reconstruct historic canopy ref | Ruben Coronado | active | |
| 40 | roofing | 2026-04-03 | AUSTIN | 1605 W 11TH ST | Express: Replace siding insulation drywall doors and windows; new electrical new A/C drain line re-roof | $1 | Thomas Howells | active |
| 40 | roofing | 2026-04-01 | AUSTIN | 8700 SPARTA LN | Installation of a 10.58 kW BIPV solar shingle project. Supply side tap. No MPU. Utility is Austin Energy. REVISION 1: Add aux EP | Jared Vaught | finaled | |
| 40 | roofing | 2026-03-31 | AUSTIN | 906 E APPLEGATE DR | Replace a 4 cast Iron waste and vent riser from the floor thru the roof. Approximately 10 ft. total. | Gary Werner | finaled | |
| 40 | roofing | 2026-03-31 | AUSTIN | 418 HEARTWOOD DR | EXPRESS: Refoof project tear down to decking and replace with architectural shingle | $1 | Louis Imbriaco | active |
| 40 | roofing | 2026-03-30 | AUSTIN | 1408 SANCHEZ ST | Express: Replace water heater replace roofing demo & replace sagging.ceiling drywall in the living room replace Kitchen GFCL -outlets replace high use | Salomon Garcia | finaled | |
| 40 | roofing | 2026-03-30 | AUSTIN | 1408 SANCHEZ ST | Express: Replace water heater replace roofing demo & replace sagging.ceiling drywall in the living room replace Kitchen GFCL -outlets replace high use | $1 | Libia Cruz | finaled |
| 40 | roofing | 2026-03-30 | AUSTIN | 3718 MENCHACA RD | UNIT 301 - New 3 story with attached garage office and roof top. 3/3.5 Revision 1: Revisions to exterior building materials. | $1 | Tammy Lindenberg | active |
| 40 | roofing | 2026-03-30 | AUSTIN | 3718 MENCHACA RD | UNIT 301 - New 3 story with attached garage office and roof top. 3/3.5 | Christopher Roman | active | |
| 40 | roofing | 2026-03-30 | AUSTIN | 3718 MENCHACA RD | UNIT 305 - New 3 story with attached garage office and roof top. 3/3.5 | Richard Valdez | active | |
| 40 | roofing | 2026-03-30 | AUSTIN | 3718 MENCHACA RD | UNIT 304 - New 3 story with attached garage office and roof top. 3/3.5 | Richard Valdez | active | |
| 40 | roofing | 2026-03-30 | AUSTIN | 3718 MENCHACA RD | UNIT 301 - New 3 story with attached garage office and roof top. 3/3.5 | Richard Valdez | active | |
| 40 | roofing | 2026-03-30 | AUSTIN | 3718 MENCHACA RD | UNIT 301 - New 3 story with attached garage office and roof top. 3/3.5 | Michael S. Bryant | active | |
| 40 | roofing | 2026-03-30 | AUSTIN | 3718 MENCHACA RD | UNIT 304 - New 3 story with attached garage office and roof top. 3/3.5 | Christopher Roman | active | |
| 40 | roofing | 2026-03-30 | AUSTIN | 1408 SANCHEZ ST | Express: Replace water heater replace roofing demo & replace sagging.ceiling drywall in the living room replace Kitchen GFCL -outlets replace high use | Homero Canet | finaled | |
| 40 | roofing | 2026-03-30 | AUSTIN | 3718 MENCHACA RD | UNIT 305 - New 3 story with attached garage office and roof top. 3/3.5 | Michael S. Bryant | active | |
| 40 | roofing | 2026-03-30 | AUSTIN | 3718 MENCHACA RD | UNIT 305 - New 3 story with attached garage office and roof top. 3/3.5 | Christopher Roman | active | |
| 40 | roofing | 2026-03-30 | AUSTIN | 3718 MENCHACA RD | UNIT 304 - New 3 story with attached garage office and roof top. 3/3.5 | Michael S. Bryant | active | |
| 40 | roofing | 2026-03-25 | AUSTIN | 3401 SPANISH OAK DR | New detached three post metal pergola. Floor drain to open air. 4/3/26 SM - Permit to include outdoor kitchen with roof covering. Kitchen will have e | Mark Brown | active | |
| 40 | roofing | 2026-03-25 | AUSTIN | 9809 CURLEW DR | Total Demo of 1320 SF wood stud construction vinyl siding metal roof Circa 1984 ... | $0 | Kellie Jones | active |
| 40 | roofing | 2026-03-24 | AUSTIN | 1867 WESTLAKE DR BLDG BD | New boat dock construction. Single slip with single sloped roof. composite decking metal framing metal roof electrical. | Eric Martin Cerda | active | |
| 40 | roofing | 2026-03-23 | AUSTIN | 2315 LAKE AUSTIN BLVD | Completely remove existing historical tile wood shingles and spaced sheathing down to structure for existing sloped concrete tile roof. Clean and salv | Miguel Juarez | active | |
| 40 | roofing | 2026-03-19 | AUSTIN | 3817 WESTLAKE DR | Includes replacing cabinetry in the existing boat dock replacing the dock roof and replacing the dock enclosure with no structural modifications. Incl | Arthur Bucher | active | |
| 40 | roofing | 2026-03-18 | AUSTIN | 8700 SHOAL CREEK BLVD BLDG TNFM1 | ePlan-Expedited Review: New Construction of a Multi-Family Building. Fire Area 1 - also contains Fitness Club Business Center on Level 2 and Roof Club | Juan Cervantes | active | |
| 40 | roofing | 2026-03-13 | AUSTIN | 7304 BARLEY CV | Express: Reroof with no structure changes | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-03-13 | AUSTIN | 8930 GALEWOOD DR BLDG A | Re Roof | Nikki Ramirez | finaled | |
| 40 | roofing | 2026-03-12 | AUSTIN | 2808 GUADALUPE ST | Reroof | Stacie Feller | finaled | |
| 40 | roofing | 2026-03-12 | AUSTIN | 2901 S CAPITAL OF TEXAS HWY NB UNIT G02B | The 1 backflow for the chiller on the roof is damaged beyond repair. The assembly will be replaced with a new 1 watts 009QT. | David Everett | active | |
| 40 | roofing | 2026-03-12 | AUSTIN | 11714 BIG TRL | Express: Interior non-structural remodel (all flooring exterior siding windows roof HVAC all cabinets all tile garage doors appliances all light fixtu | Norberto Martinez | active | |
| 40 | roofing | 2026-03-11 | AUSTIN | 11005 PLUMEWOOD DR | upgrade existing 200amp service to new 200amp service through the roof PEC | Joshua D. Sierakowski | finaled | |
| 40 | roofing | 2026-03-11 | AUSTIN | 8303 GRAYLEDGE DR | Express: partial reroof. Material change (asphalt shingles to metal) and 1850 sqft redeck | $1 | Stacie Feller | active |
| 40 | roofing | 2026-03-09 | AUSTIN | 2200 DENTON DR | SIMPLE RE-ROOF - OVA | Holly Zihlman | finaled | |
| 40 | roofing | 2026-03-09 | AUSTIN | 9230 NEILS THOMPSON DR | SIMPLE RE-ROOF - OVA | Holly Zihlman | active | |
| 40 | roofing | 2026-03-09 | AUSTIN | 5412 E MARTIN LUTHER KING JR BLVD | Interior remodel foundation repair new roof limited to shingles faccia and trim window and door like for like change out light switches and outlets i | Turner Whatley | active | |
| 40 | roofing | 2026-03-07 | AUSTIN | 6207 HARWIN LN | Express: Bath 1 to new tub/tile surround. Bath 2 to shower/tile surround. Replace copper pipes to PEX drains to PVC and new fans exhausted thru roof f | June Gordon | active | |
| 40 | roofing | 2026-03-04 | AUSTIN | 10000 RESEARCH BLVD SVRD SB UNIT 115 | Remodel of existing retail space. Demo front entry and extend it under existing roof on existing foundation to capture 73 additional Sq.Ft. MEP scope. | Joe Patino | finaled | |
| 40 | roofing | 2026-03-04 | AUSTIN | 15019 TERRA VERDE DR | Add a roof above the existing slab in the back yard. The roof area will be larger than the current slab area. Due to the heritage trees in the backya | $1 | Aletta van der Walt | active |
| 40 | roofing | 2026-03-04 | AUSTIN | 1702 KERR ST | Retroactively permit open-air structure over an existing roof deck and add screen wall and storage in an existing carport | Terry Herrin | active | |
| 40 | roofing | 2026-03-03 | AUSTIN | 11714 BIG TRL | Express: Interior non-structural remodel (all flooring exterior siding windows roof HVAC all cabinets all tile garage doors appliances all light fixtu | $1 | David Wagner | active |