Permits
2,211 permits • page 7 of 23
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 50 | roofing | 2024-09-11 | AUSTIN | 7217 ELLINGTON CIR | Express: smoke detector installation water heater replacement roofing replacement | $1 | Jesus Gutierrez | finaled |
| 50 | roofing | 2024-09-09 | AUSTIN | 15433 FM 1325 RD | Roof Replacement (Shingles Only) Building Clubhouse | Patrick Daiello | finaled | |
| 50 | roofing | 2024-09-09 | AUSTIN | 15433 FM 1325 RD BLDG 13 | Roof Replacement (Shingles Only) Building 13 | Patrick Daiello | finaled | |
| 50 | roofing | 2024-09-09 | AUSTIN | 15433 FM 1325 RD BLDG 8 | Roof Replacement (Shingles Only) Building 8 | Patrick Daiello | finaled | |
| 50 | roofing | 2024-09-09 | AUSTIN | 15433 FM 1325 RD BLDG 4 | Roof Replacement (Shingles Only) Building 4 | Patrick Daiello | finaled | |
| 50 | roofing | 2024-09-09 | AUSTIN | 15433 FM 1325 RD BLDG 5 | Roof Replacement (Shingles Only) Building 5 | Patrick Daiello | finaled | |
| 50 | roofing | 2024-09-09 | AUSTIN | 15433 FM 1325 RD BLDG 9 | Roof Replacement (Shingles Only) Building 9 | Patrick Daiello | finaled | |
| 50 | roofing | 2024-09-09 | AUSTIN | 15433 FM 1325 RD BLDG 12 | Roof Replacement (Shingles Only) Building 12 | Patrick Daiello | finaled | |
| 50 | roofing | 2024-09-09 | AUSTIN | 15433 FM 1325 RD BLDG 7 | Roof Replacement (Shingles Only) Building 7 | Patrick Daiello | finaled | |
| 50 | roofing | 2024-09-09 | AUSTIN | 15433 FM 1325 RD BLDG 2 | Roof Replacement (Shingles Only) Building 2 | Patrick Daiello | finaled | |
| 50 | roofing | 2024-09-09 | AUSTIN | 15433 FM 1325 RD BLDG 6 | Roof Replacement (Shingles Only) Building 6 | Patrick Daiello | finaled | |
| 50 | roofing | 2024-09-09 | AUSTIN | 15433 FM 1325 RD BLDG 11 | Roof Replacement (Shingles Only) Building 11 | Patrick Daiello | finaled | |
| 50 | roofing | 2024-09-09 | AUSTIN | 15433 FM 1325 RD BLDG 3 | Roof Replacement (Shingles Only) Building 3 | Patrick Daiello | finaled | |
| 50 | roofing | 2024-09-09 | AUSTIN | 15433 FM 1325 RD BLDG 10 | Roof Replacement (Shingles Only) Building 10 | Patrick Daiello | finaled | |
| 50 | roofing | 2024-09-09 | AUSTIN | 15433 FM 1325 RD BLDG 1 | Roof Replacement (Shingles Only) Building 1 | Patrick Daiello | finaled | |
| 50 | roofing | 2024-09-05 | AUSTIN | 10430 MORADO CIR BLDG 16 | Roof Replacement for Building 16 | Matt Linder | finaled | |
| 50 | roofing | 2024-09-05 | AUSTIN | 10430 MORADO CIR BLDG 15 | Roof Replacement for Building 15 | Matt Linder | finaled | |
| 50 | roofing | 2024-09-04 | AUSTIN | 9006 QUEENSWOOD DR | Express: roof repair window replacement (like for like) exempt work (cabinetry tiling flooring upgrading plumbing fixtures) | $1 | Robert Suggs | finaled |
| 50 | roofing | 2024-08-28 | AUSTIN | 8308 WEXFORD DR | Express: drywall repair electrical panel replacement roof repair exempt work (painting) | $1 | Vadim Zelenskiy | finaled |
| 50 | roofing | 2024-08-28 | AUSTIN | 8308 WEXFORD DR | Express: drywall repair electrical panel replacement roof repair exempt work (painting) | Eduardo Martell | finaled | |
| 50 | roofing | 2024-08-23 | AUSTIN | 2200 SCENIC DR | Interior remodel: Replace windows size for size in same location water damage repairs replace stucco and wood siding repair roof to the extend of repl | Timothy R. Putman | finaled | |
| 50 | roofing | 2024-08-22 | AUSTIN | 2200 SCENIC DR | Interior remodel: Replace windows size for size in same location water damage repairs replace stucco and wood siding repair roof to the extend of repl | $1 | Joshua Cummins | finaled |
| 50 | roofing | 2024-08-22 | AUSTIN | 2200 SCENIC DR | Interior remodel: Replace windows size for size in same location water damage repairs replace stucco and wood siding repair roof to the extend of repl | Mario Martinez Jr | finaled | |
| 50 | roofing | 2024-08-20 | AUSTIN | 408 BLUEBERRY HILL | Express: Fire Loss General demo framing repairs roof replacement plumbing electrical HVAC siding drywall insulation cabinets finish carpentry repairs. | Mario Vazquez | finaled | |
| 50 | roofing | 2024-08-15 | AUSTIN | 408 BLUEBERRY HILL | Express: Fire Loss General demo framing repairs roof replacement plumbing electrical HVAC siding drywall insulation cabinets finish carpentry repairs. | $1 | Jacob Hussa | finaled |
| 50 | roofing | 2024-08-13 | AUSTIN | 4808 RUSSET HILL DR | Express: Change windows siding roof and a tub to shower conversion. Revision-electrical panel upgrade and water heater replacement | Dylan James Byrd | finaled | |
| 50 | roofing | 2024-08-12 | AUSTIN | 4521 WEST GATE BLVD | Overlay new PVC .60 mil membrane over existing due to hail damage | Daniel McCoy | finaled | |
| 50 | roofing | 2024-08-07 | AUSTIN | 4808 RUSSET HILL DR | Express: Change windows siding roof and a tub to shower conversion. Revision-electrical panel upgrade and water heater replacement | Justin Rubio | finaled | |
| 50 | roofing | 2024-08-05 | AUSTIN | 6603 BOURG CV | Express: tub-to-shower replacement window replacement (like for like) roof replacement HVAC replacement sheetrock repair | Salomon Garcia | finaled | |
| 50 | roofing | 2024-08-04 | AUSTIN | 6603 BOURG CV | Express: tub-to-shower replacement window replacement (like for like) roof replacement HVAC replacement sheetrock repair | $1 | Hector Perez Millan | finaled |
| 50 | roofing | 2024-08-02 | AUSTIN | 1912 W 40TH ST | *partial demo* interior remodel: remodel of existing kitchen and bathroom asphalt shingle roof replacement repair of roof damage from Feb/2021 storm R | $1 | Marc Nightwine | finaled |
| 50 | roofing | 2024-08-02 | AUSTIN | 3818 FAR WEST BLVD UNIT 102 | Roof Replacement TPO for Units 102-111 | Harold Peterson | finaled | |
| 50 | roofing | 2024-08-02 | AUSTIN | 500 MAIRO ST | Partial renovation of existing elementary school to include replacement roof | ELIGIO BLANCO | finaled | |
| 50 | roofing | 2024-07-29 | AUSTIN | 500 MAIRO ST | Partial renovation of existing elementary school to include replacement roof | Kwangsub Kim | finaled | |
| 50 | roofing | 2024-07-23 | AUSTIN | 500 MAIRO ST | Partial renovation of existing elementary school to include replacement roof | Jesse Beckett | finaled | |
| 50 | roofing | 2024-07-11 | AUSTIN | 810 W HOWARD LN | Roof Replacement | Holly Zihlman | finaled | |
| 50 | roofing | 2024-07-10 | AUSTIN | 6101 PATTON RANCH RD | Partial renovation of existing Elementary School to include replacement of roof. | Kenneth Tumlinson | finaled | |
| 50 | roofing | 2024-07-09 | AUSTIN | 1310 CLOVERLEAF DR | PANEL SWAP EMERGENCY STORM DAMAGE ADD CAN LIGHTS 12 | Juan Garcia | finaled | |
| 50 | roofing | 2024-06-26 | AUSTIN | 11909 HURRICANE HAZE DR | Installation of solar panels on existing residential roof. 4.62 kW. | David Conrad | finaled | |
| 50 | roofing | 2024-06-26 | AUSTIN | 5415 TIPTON DR | Express: roof/window/siding replacement (like for like) foundation repair interior wall reinsulation tub/shower/surround remodel HVAC/plumbing equipme | Jerry L Roudebush | finaled | |
| 50 | roofing | 2024-06-20 | AUSTIN | 4802 WEST GATE BLVD | Repair fire damage to the roof and wires of a 4-plex residence This includes units 101 102 103 and 104 DB - MRT | Joe D Woods | finaled | |
| 50 | roofing | 2024-06-17 | AUSTIN | 5415 TIPTON DR | Express: roof/window/siding replacement (like for like) foundation repair interior wall reinsulation tub/shower/surround remodel HVAC/plumbing equipme | Gabriel Nieves | finaled | |
| 50 | roofing | 2024-06-13 | AUSTIN | 12120 JOHNNY WEISMULLER LN UNIT 2 | express one drywall patch & roof replacement of shingles & rotted decking | $1 | Maria L Aleman | finaled |
| 50 | roofing | 2024-06-13 | AUSTIN | 9600 S IH 35 SVRD SB BLDG L | Nonstructural reroof to existing Retail Bldg. *MUST COMPLY W/CURRENT COA ENERGY CODES* | active | ||
| 50 | roofing | 2024-06-11 | AUSTIN | 4808 RUSSET HILL DR | Express: Change windows siding roof and a tub to shower conversion. Revision-electrical panel upgrade and water heater replacement | $1 | Carlos Diaz | finaled |
| 50 | roofing | 2024-06-10 | AUSTIN | 1017 FALLWELL LN | Roof Replacement for Blower C Bldg. | Holly Zihlman | finaled | |
| 50 | roofing | 2024-06-10 | AUSTIN | 500 MAIRO ST | Partial renovation of existing elementary school to include replacement roof | Seth Adams | finaled | |
| 50 | roofing | 2024-06-07 | AUSTIN | 6203 SHADOW VALLEY DR UNIT 1 | Emergency Service Rebuild due to storm damage. Service will be rebuilt with new equipment to code. | Randall Mallory | finaled | |
| 50 | roofing | 2024-06-06 | AUSTIN | 4705 AVENUE F | Storm damage to riser meter hub . Replaced riser and hub no damage to actual meter no meter can required | Curtis Sellers | finaled | |
| 50 | roofing | 2024-06-06 | AUSTIN | 5604 SUNDAY SILENCE DR | Express: Replace walk in shower Replace HVAC unit. **Full HVAC replacement New Roof New rear sliding glass door New weather stripping on all exterior | $1 | Luis Nunez | finaled |
| 50 | roofing | 2024-05-31 | AUSTIN | 2600 LONGHORN BLVD | Roof Replacement | Holly Zihlman | finaled | |
| 50 | roofing | 2024-05-28 | AUSTIN | 8620 BURNET RD UNIT 100 | Re-roof- Remove existing single ply membrane only leaving insulation in place. Mechanically attach separator coverboard. Mechanically attach white TPO | finaled | ||
| 50 | roofing | 2024-05-24 | AUSTIN | 8301 FURNESS DR | Demolition of existing roof mounted heat recovery units (HRUs) and installations of new HRUs. Demo of select ground source heat pumps and replacement | Edgar Kleck | finaled | |
| 50 | roofing | 2024-05-23 | AUSTIN | 809 RIO GRANDE ST | Single-layer roof replacement 22 sq total of asphalt dimensional shingles and 6 squares of modified bitumen roofing. No roof or attic penetrations. | Nathan Navarro | finaled | |
| 50 | roofing | 2024-05-21 | AUSTIN | 1404 PARK CENTER DR | This is a CRAC and Roof top unit replacement project. The scope of work includes limited mechanical and electrical work per plans. ***NEED TO PULL LI | Weslee Jones | finaled | |
| 50 | roofing | 2024-05-21 | AUSTIN | 1404 PARK CENTER DR | This is a CRAC and Roof top unit replacement project. The scope of work includes limited mechanical and electrical work per plans. ***NEED TO PULL LI | Edward Neal Jr | finaled | |
| 50 | roofing | 2024-05-21 | AUSTIN | 808 HOLLYBLUFF ST | EMERGENCY - storm damage; rebuild and replace 125A overhead service and riser | Charles D Gordon | finaled | |
| 50 | roofing | 2024-05-21 | AUSTIN | 806 HOLLYBLUFF ST | EMERGENCY - storm damage; rebuild and replace 125A overhead service and riser | Charles D Gordon | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement for Preliminary Treatment A | David Bernal | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement for Preliminary Treatment B | David Bernal | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement for Sludge Transfer Facility | David Bernal | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement - SAR Roof Replacements - Secondary Sludge Pump Train A | David Bernal | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement for Flow Equalization Bldg. A | David Bernal | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1924 E 38TH HALF ST | Roof Repair/ Membrane Replacement Remove Existing TPO Membrane and Install New. Replace comping and gutters no change to Structure | Will Atterberry | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 404 S LAMAR BLVD SB | Replacement of MAU on roof | Daniel Manrique-Greenwood | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement for Utility Pump Building | David Bernal | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement - SAR Roof Replacements - Flow Equalization Bld. B | David Bernal | finaled | |
| 50 | roofing | 2024-05-17 | AUSTIN | 5415 TIPTON DR | Express: roof/window/siding replacement (like for like) foundation repair interior wall reinsulation tub/shower/surround remodel HVAC/plumbing equipme | $1 | Gabriel Dunlap | finaled |
| 50 | roofing | 2024-05-17 | AUSTIN | 3001 BOXDALE DR | EMERGENCY REPAIR on riser and meter from storm damage | Averil White | finaled | |
| 50 | roofing | 2024-05-15 | AUSTIN | 5604 SUNDAY SILENCE DR | Express: Replace walk in shower Replace HVAC unit. **Full HVAC replacement New water heater New Roof New rear sliding glass door New weather stripping | Salomon Garcia | finaled | |
| 50 | roofing | 2024-05-14 | AUSTIN | 5808 ADAIR DR | express fire damage repair roof dormer truss & drywall | Alfonso Martinez | finaled | |
| 50 | roofing | 2024-05-13 | AUSTIN | 8108 BRIARWOOD LN | Storm damage*** rebuild main electrical service panel due to storm damage | Brian Robert West | finaled | |
| 50 | roofing | 2024-05-13 | AUSTIN | 5808 ADAIR DR | express fire damage repair roof dormer truss & drywall | Kris Koester | finaled | |
| 50 | roofing | 2024-05-13 | AUSTIN | 11911 ARBOR DOWNS RD | Express: roof decking repair shingle replacement (exempt) | $1 | Dylan Trotsek | finaled |
| 50 | roofing | 2024-05-07 | AUSTIN | 6101 PATTON RANCH RD | Partial renovation of existing Elementary School to include replacement of roof. | Alexis Stecker | finaled | |
| 50 | roofing | 2024-05-07 | AUSTIN | 8200 CROSS PARK DR | Roof Replacement. | David Bernal | finaled | |
| 50 | roofing | 2024-05-07 | AUSTIN | 1100 SUMMIT ST | express existing uncovered wood deck due to fire damage Eric Thomas approved for this to be processed as express fire damage Revision: Re-roof stru | Austin Johnson | active | |
| 50 | roofing | 2024-05-06 | AUSTIN | 4404 ADELPHI LN | REPAIR OF SOLAR SYSTEM DUE TO HAIL DAMAGE | Albert Garza | finaled | |
| 50 | roofing | 2024-05-06 | AUSTIN | 508 GATE TREE LN | Repair only permit pulled asap; Mast replacement storm damage. ***EMERGENCY INSPECTION DONE ON 4/29/24-HYATT*** | Brian Robert West | finaled | |
| 50 | roofing | 2024-05-06 | AUSTIN | 5317 HARVEST LN | Storm damage Replaced riser and meter socket damaged from storm. Inspected and re connected on 4/29 ***EMERGENCY INSPECTION DONE ON 4/29/24-HYATT*** | Brian Robert West | finaled | |
| 45 | roofing | 2026-04-23 | AUSTIN | 2000 CEDAR BEND DR BLDG 1 | RE-ROOF | Steven Needham | active | |
| 45 | roofing | 2026-04-23 | AUSTIN | 701 W LONGSPUR BLVD BLDG 14 | RE-ROOF - REMOVE EXISTING SHINGLES WITH NEW TAMKO TITAN SHINGLES AT EXISTING MULTI-FAMILY - OVA | Steven Needham | active | |
| 45 | roofing | 2026-04-23 | AUSTIN | 2000 CEDAR BEND DR BLDG 2 | SIMPLE RE-ROOF BLDG 2 -OVA | Steven Needham | active | |
| 45 | roofing | 2026-04-23 | AUSTIN | 701 W LONGSPUR BLVD BLDG 16 | RE-ROOF - REMOVE EXISTING SHINGLES WITH NEW TAMKO TITAN SHINGLES AT EXISTING MULTI-FAMILY - OVA | Steven Needham | active | |
| 45 | roofing | 2026-04-22 | AUSTIN | 2000 CEDAR BEND DR BLDG 3 | SIMPLE RE-ROOF BLDG 3 - OVA | Steven Needham | active | |
| 45 | roofing | 2026-04-16 | AUSTIN | 1501 NORTHWOOD RD | Express: Replacing the existing metal roof with a new. Installing new decking. | $1 | Cole Shiflet | active |
| 45 | roofing | 2026-04-16 | AUSTIN | 11200 LAKELINE MALL DR | Commercial Roof Recover of existing low-slope roofing system. No structural modifications. No change to building footprint use or occupancy. (Macys Bu | David Wasson | active | |
| 45 | roofing | 2026-04-15 | AUSTIN | 910 BRAZOS ST | Reroof with mechanically fastened TPO | Molly Johnston | active | |
| 45 | roofing | 2026-04-13 | AUSTIN | 701 W LONGSPUR BLVD BLDG 18 | RE-ROOF - REMOVE EXISTING SHINGLES WITH NEW TAMKO TITAN SHINGLES AT EXISTING MULTI-FAMILY BLDG 18 - OVA | Steven Needham | active | |
| 45 | roofing | 2026-04-13 | AUSTIN | 701 W LONGSPUR BLVD BLDG 9 | RE-ROOF - REMOVE EXISTING SHINGLES WITH NEW TAMKO TITAN SHINGLES AT EXISTING MULTI-FAMILY - OVA | Steven Needham | active | |
| 45 | roofing | 2026-04-13 | AUSTIN | 701 W LONGSPUR BLVD BLDG 15 | RE-ROOF - REMOVE EXISTING SHINGLES WITH NEW TAMKO TITAN SHINGLES AT EXISTING MULTI-FAMILY bldg 15- OVA | Steven Needham | active | |
| 45 | roofing | 2026-04-13 | AUSTIN | 701 W LONGSPUR BLVD BLDG 17 | RE-ROOF - REMOVE EXISTING SHINGLES WITH NEW TAMKO TITAN SHINGLES AT EXISTING MULTI-FAMILY BLDG 17 - OVA | Steven Needham | active | |
| 45 | roofing | 2026-04-10 | AUSTIN | 5309 HERITAGE VILLAGE DR | Express: Replace roof (not going past decking) replace ac | $1 | Patricia A Williams | finaled |
| 45 | roofing | 2026-04-10 | AUSTIN | 5309 HERITAGE VILLAGE DR | Express: Replace roof (not going past decking) replace ac | Vanessa Vega | finaled | |
| 45 | roofing | 2026-04-09 | AUSTIN | 1605 W 11TH ST | Express: Replace siding insulation drywall doors and windows; new electrical new A/C drain line re-roof | Prem K. Shrestha | active | |
| 45 | roofing | 2026-04-09 | AUSTIN | 3000 WILLOWOOD CIR | Replace the main electrical service mast; new mast will penetrate through the roof. The existing meter enclosure will be utilized only the mast wires | Douglas Curington | active | |
| 45 | roofing | 2026-04-08 | AUSTIN | 10506 LORING DR | Enclose covered porch into conditioned office space. No change to building footprint or roof height. New framing windows exterior wall infill insulati | Jose Alejandro | active | |
| 45 | roofing | 2026-04-07 | AUSTIN | 2510 ONION CREEK PKWY | Re-roof tear off existing built-up roof to lightweight insulated concrete deck (R16) and install 2.2 polyiso insulation (R12) & TPO membrane. The LWI | Joseph Leray | active | |
| 45 | roofing | 2026-04-07 | AUSTIN | 8500 PALACE PKWY | Add to the existing uncovered back concrete patio and make it a 15x15 covered patio with the roof tying into existing add a ceiling fan and 4 recessed | Juan Balderas | active | |
| 45 | roofing | 2026-04-03 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 8 | Shingle Replacement | Brad Davis | finaled |