Permits
2,593 permits • page 6 of 26
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8515 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8503 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8507 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8539 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8529 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8555 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8551 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8547 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8533 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8519 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8505 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8531 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8513 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8511 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8521 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8501 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8509 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-17 | AUSTIN | 1023 E RIVERSIDE DR | Demo of existing roof and walls - Install new beam above garage doorway. Proposed building of a 2 Tier Deck above garage. Minor plumbing and electrical to add exterior sink and refrigerator electrical hook-up. Please note: Proposed deck is to be built over existing house footprint. No change to impervious. | $1 | Lior Shaked | active |
| 50 | roofing | 2026-04-15 | AUSTIN | 1813 E 38TH HALF ST BLDG 1 UNIT 1A | Bldg 1: New construction 3-unit use duplex residential: Unit A 3-story 4 bedroom 3.5 bath with attached 1-car carport covered front porch covered rear patio 3rd floor balcony and uncovered roof top deck. | Felix Solorio | active | |
| 50 | roofing | 2026-04-15 | AUSTIN | 1813 E 38TH HALF ST BLDG 2 | Bldg 2: New construction 3-unit use single-family residential 3-story 3 bedroom 2.5 bath with attached 1-car carport covered front porch covered rear patio 3rd floor balcony and uncovered roof top deck. | Felix Solorio | active | |
| 50 | roofing | 2026-04-15 | AUSTIN | 1813 E 38TH HALF ST BLDG 1 UNIT 1B | Bldg. 1 Unit B: New construction 3-unit use duplex residential 3-story 4 bedroom 3.5 bath with covered front porch covered rear patio 3rd floor balcony and uncovered roof top deck. | Felix Solorio | active | |
| 50 | roofing | 2026-04-13 | AUSTIN | 13091 POND SPRINGS RD | Roof Replacement for Retail Building #02 | Bryan Meklir | finaled | |
| 50 | roofing | 2026-04-13 | AUSTIN | 13091 POND SPRINGS RD | Roof Replacement for Shopping Center | Bryan Meklir | finaled | |
| 50 | roofing | 2026-04-11 | AUSTIN | 1137 WEBBERVILLE RD BLDG 1 | New 3-story 3 bedroom 3 bathroom dwelling unit with attached carport covered porches 2nd floor screened porch 2nd floor partially covered balcony 3rd floor partially covered balcony and roof deck. | $0 | Gerald Carter | active |
| 50 | roofing | 2026-04-11 | AUSTIN | 1137 WEBBERVILLE RD BLDG 2 | New 3-story 2 bedroom 2.5 bathroom dwelling unit with attached carport covered porch 2nd floor screened porch 2nd floor covered balcony 3rd floor partially covered balcony and roof deck. | $0 | Gerald Carter | active |
| 50 | roofing | 2026-04-10 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB | Simple re roof - replacement of Roof on Leasing Building - OVA | Amber Whitaker | active | |
| 50 | roofing | 2026-03-31 | AUSTIN | 9209 ROCK CASTLE CV | EXPRESS: Roof replacement | $1 | Jacob Lange | active |
| 50 | roofing | 2026-03-29 | AUSTIN | 1907 KENWOOD AVE UNIT B | Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit B: 3 bedroom 2 bath with rear covered patio. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT. | Joe Chavez | active | |
| 50 | roofing | 2026-03-29 | AUSTIN | 1907 KENWOOD AVE UNIT A | Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit A: 3 bedroom 2 bath with front covered porch rear covered balcony and addition of foyer & HVAC closet. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT. | Joe Chavez | active | |
| 50 | roofing | 2026-03-25 | AUSTIN | 2815 RIO GRANDE ST | Shingle roof replacement. Condominiums. | Zachary Crowell | active | |
| 50 | roofing | 2026-03-23 | AUSTIN | 7006 JUNEBERRY CV | EXPRESS: Refoof due to hail damage. Replacing underlayment shingles drip edge pipe jack flashing and gutters. | $1 | Michael Kastel | finaled |
| 50 | roofing | 2026-03-19 | AUSTIN | 910 W 22ND HALF ST | Express: replace one window like-for-like replace rotted wood/siding drywall repair roof repair exempt work (garage door replacement door replacement) | Juan Martinez | finaled | |
| 50 | roofing | 2026-03-18 | AUSTIN | 1100 SUMMIT ST | express existing uncovered wood deck due to fire damage Eric Thomas approved for this to be processed as express fire damage Revision: Re-roof stru | Robert Salgado | active | |
| 50 | roofing | 2026-03-18 | AUSTIN | 1100 SUMMIT ST | express existing uncovered wood deck due to fire damage Eric Thomas approved for this to be processed as express fire damage Revision: Re-roof structure with metal roof replace drywall and insulation rewire electrical and repair as needed plumbing repair replace plumbing fixtures like for like Kitchen and cosmetic upgrades | Robert Salgado | active | |
| 50 | roofing | 2026-03-13 | AUSTIN | 8617 COBBLESTONE | EXPRESS: Replace whole shingle roof due to hail damage | $1 | Ben Keiderling | finaled |
| 50 | roofing | 2026-03-05 | AUSTIN | 6602 LAIRD DR | Express: siding repair stone removal roof replacement | $1 | Lane White | active |
| 50 | roofing | 2026-03-05 | AUSTIN | 3110 VAL DR | Express: siding repair brick repair roof replacement | $1 | Lane White | active |
| 50 | roofing | 2026-03-04 | AUSTIN | 12207 MUSTANG CHASE | Addition remodel and new accessory Addition and remodel to existing residence garage conversion roof replacement and addition window replacement new | Adam Holman | finaled | |
| 50 | roofing | 2026-03-04 | AUSTIN | 1821 DIRECTORS BLVD | Replacement of any self-contained packaged units Change out of RTUs and split systems. Work will take place on the roof and ceiling spaces of levels 1 | James Marek | finaled | |
| 50 | roofing | 2026-03-04 | AUSTIN | 9330 UNITED DR BLDG 4 | Replacement of any self-contained packaged units Scope of work: Replacing 2 roof top units like for like with no modifications. RTU#1 7.5 ton & RTU#2 | Jacob Lee Phillips | finaled | |
| 50 | roofing | 2026-03-04 | AUSTIN | 910 W 22ND HALF ST | Express: replace one window like-for-like replace rotted wood/siding drywall repair roof repair exempt work (garage door replacement door replacement) | $1 | Steve Johnson | finaled |
| 50 | roofing | 2026-03-04 | AUSTIN | 1821 DIRECTORS BLVD | Replacement of any self-contained packaged units Change out of RTUs and split systems. Work will take place on the roof and ceiling spaces of levels 1 and 2. New controls wiring will installed and new t-stats | James Marek | finaled | |
| 50 | roofing | 2026-03-04 | AUSTIN | 9330 UNITED DR BLDG 4 | Replacement of any self-contained packaged units Scope of work: Replacing 2 roof top units like for like with no modifications. RTU#1 7.5 ton & RTU#2 5 ton | Jacob Lee Phillips | finaled | |
| 50 | roofing | 2026-03-04 | AUSTIN | 12207 MUSTANG CHASE | Addition remodel and new accessory Addition and remodel to existing residence garage conversion roof replacement and addition window replacement new siding to addition and paint new metal shed | Adam Holman | finaled | |
| 50 | roofing | 2026-03-03 | AUSTIN | 1114 TERRY DR | Express: Repairs due to fire damage (siding windows roof insulation drywall flooring cabinetry doors showers painting | Dwight LaBran | active | |
| 50 | roofing | 2026-03-03 | AUSTIN | 3700 CONVICT HILL RD | Per AISD 2022 Bond Language Secure entry vestibule upgrades storefront and glazing installation Life safety and security improvements Heating and air conditioning Electrical Plumbing improvements Building exterior improvements Roofing replacement | Katherine Webb | active | |
| 50 | roofing | 2026-03-02 | AUSTIN | 800 BANISTER LN | Shingle Roof Replacement only. | Zachary Crowell | active | |
| 50 | roofing | 2026-02-26 | AUSTIN | 2211 W BRAKER LN | Replacement of any self-contained packaged units change out one Trane roof top unit model ysk090a4sol000 460 volt unit. | Clayton Daniel | active | |
| 50 | roofing | 2026-02-26 | AUSTIN | 2111 W BRAKER LN UNIT 300 | Replacement of any self-contained packaged units change out one Trane roof top unit model ysk090a4sol000 460 volt unit. | Clayton Daniel | active | |
| 50 | roofing | 2026-02-23 | AUSTIN | 5510 HITCHER BND | Express: roof shingle replacement in WUI | $1 | Dennis Kashkin | active |
| 50 | roofing | 2026-02-20 | AUSTIN | 1907 KENWOOD AVE UNIT A | Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit A: 3 bedroom 2 bath with front covered porch rear covered balcony and addition of foyer & HVAC closet. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT. | $1 | Shaya Habibi | active |
| 50 | roofing | 2026-02-20 | AUSTIN | 1907 KENWOOD AVE UNIT B | Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit B: 3 bedroom 2 bath with rear covered patio. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT. | $1 | Shaya Habibi | active |
| 50 | roofing | 2026-02-18 | AUSTIN | 6801 JESTER BLVD | Replacement of existing deck siding and roof. Partial raising of interior floor. Remodel of deck to match height of interior/avoid entry steps. Slight | $1 | Nick Chappell | active |
| 50 | roofing | 2026-02-17 | AUSTIN | 2107 FALCON HILL DR | Ice storm damage. Replace damaged 2 inch conduit riser. | Dustin Roberts | active | |
| 50 | roofing | 2026-02-17 | AUSTIN | 13450 N US 183 HWY SVRD SB | TPO Roof Overlay | finaled | ||
| 50 | roofing | 2026-02-11 | AUSTIN | 730 W STASSNEY LN UNIT 105 | Structural and interior repairs following a fire in the suite. Repairs include - replacement of damaged trusses metal roof decking and roof replacemen | GREGORY PADALECKI | active | |
| 50 | roofing | 2026-02-11 | AUSTIN | 1114 TERRY DR | Express: Repairs due to fire damage (siding windows roof insulation drywall flooring cabinetry doors showers painting | Eddie Guerrero | active | |
| 50 | roofing | 2026-02-11 | AUSTIN | 730 W STASSNEY LN UNIT 105 | Structural and interior repairs following a fire in the suite. Repairs include - replacement of damaged trusses metal roof decking and roof replacement for Suite 105 | GREGORY PADALECKI | active | |
| 50 | roofing | 2026-02-06 | AUSTIN | 1200 E RUNDBERG LN | Interior renovations new secure entry vestibule & security fencing re-roofing elevator replacement exterior facade renovations. PuPR2 | Richard Minyard | active | |
| 50 | roofing | 2026-02-04 | AUSTIN | 1114 TERRY DR | Express: Repairs due to fire damage (siding windows roof insulation drywall flooring cabinetry doors showers painting | Edgar Tafolla | active | |
| 50 | roofing | 2026-02-04 | AUSTIN | 301 SAN JACINTO BLVD | Roof overlay | finaled | ||
| 50 | roofing | 2026-01-22 | AUSTIN | 5601 MENCHACA RD | Re-Roofing and replacement of roof drains. Installation of new Windows at adjacent wall to allow for added insulation taper. Roof drain piping to be i | Gregory Lee Gaddy | finaled | |
| 50 | roofing | 2026-01-22 | AUSTIN | 412 E 6TH ST | Emergency Leak repair / replacement- Tx Gas is relocating the side walk curb meter to the right side of the building due to a leak at their connection and remove any trip hazards that are in place. The building is currently using gas for the RTU heater and water heater. The line run is about 150 to relocate over the roof top of the building. | ERNEST DURAN | finaled | |
| 50 | roofing | 2026-01-22 | AUSTIN | 5601 MENCHACA RD | Re-Roofing and replacement of roof drains. Installation of new Windows at adjacent wall to allow for added insulation taper. Roof drain piping to be installed at roof requires access to ceiling space ceiling tile replacement as required to access new roof drains. | Gregory Lee Gaddy | finaled | |
| 50 | roofing | 2026-01-20 | AUSTIN | 5601 MENCHACA RD | Re-Roofing and replacement of roof drains. Installation of new Windows at adjacent wall to allow for added insulation taper. Roof drain piping to be i | Katherine Webb | finaled | |
| 50 | roofing | 2026-01-20 | AUSTIN | 5601 MENCHACA RD | Re-Roofing and replacement of roof drains. Installation of new Windows at adjacent wall to allow for added insulation taper. Roof drain piping to be installed at roof requires access to ceiling space ceiling tile replacement as required to access new roof drains. | Katherine Webb | finaled | |
| 50 | roofing | 2026-01-16 | AUSTIN | 906 SWEETWATER RIVER DR | Electrical support for siding removal and replacement. With approved permit a shutdown date will be obtained from AE on this date after service has been disconnected the service equipment will be loosen off the wall enough for the existing siding to be removed blocking will be installed to support the equipment new siding will be installed by siding contractor ( 21st Century Painting and Roofing) service equipment will be reattached to the wall inspection will be requested test voltage once service has been re-energized by AE. No improvements or changes will be made to the service. | Timothy R. Putman | finaled | |
| 50 | roofing | 2026-01-16 | AUSTIN | 3607 TYRONE DR | Electrical support for removal and replacement of siding. Scope will consist of service disconnect from AE loosen service equipment enough from wall for existing siding to be removed siding contractor (21st Century Painting and Roofing) will install blocking to support service equipment install new siding Putman Electrical will reattach service equipment request inspection and test voltage once AE has re-energized the service. There will be no changes or upgrades to the service. | Timothy R. Putman | finaled | |
| 50 | roofing | 2026-01-13 | AUSTIN | 1200 E RUNDBERG LN | Interior renovations new secure entry vestibule & security fencing re-roofing elevator replacement exterior facade renovations. PuPR2 | Vincent Gillette | finaled | |
| 50 | roofing | 2026-01-12 | AUSTIN | 3701 WOODBURY DR | AISD PROJECT - Addition of high-pile rack storage system to existing warehouse. Demolition of roof-mounted ventilation fans and skylights. Demolition of space-mounted unit heaters. Roofing repairs and new roof overlay. New gas piping to serve new HVAC equipment and heaters. Replacement of existing wet pipe fire sprinkler system with new ESFR sprinkler system in the high-pile storage area. Repair of sliding warehouse doors. Replacement of dock levelers. (Dry food) | Abel Martinez | finaled | |
| 50 | roofing | 2026-01-08 | AUSTIN | 3701 WOODBURY DR | AISD PROJECT - Addition of high-pile rack storage system to existing warehouse. Demolition of roof-mounted ventilation fans and skylights. Demolition of space-mounted unit heaters. Roofing repairs and new roof overlay. New gas piping to serve new HVAC equipment and heaters. Replacement of existing wet pipe fire sprinkler system with new ESFR sprinkler system in the high-pile storage area. Repair of sliding warehouse doors. Replacement of dock levelers. (Dry food) | Ereli Jaramillo Gonzalez | active | |
| 50 | roofing | 2026-01-06 | AUSTIN | 3701 WOODBURY DR | AISD PROJECT - Addition of high-pile rack storage system to existing warehouse. Demolition of roof-mounted ventilation fans and skylights. Demolition of space-mounted unit heaters. Roofing repairs and new roof overlay. New gas piping to serve new HVAC equipment and heaters. Replacement of existing wet pipe fire sprinkler system with new ESFR sprinkler system in the high-pile storage area. Repair of sliding warehouse doors. Replacement of dock levelers. (Dry food) | Ronald Price | active | |
| 50 | roofing | 2026-01-05 | AUSTIN | 3701 WOODBURY DR | AISD PROJECT - Addition of high-pile rack storage system to existing warehouse. Demolition of roof-mounted ventilation fans and skylights. Demolition of space-mounted unit heaters. Roofing repairs and new roof overlay. New gas piping to serve new HVAC equipment and heaters. Replacement of existing wet pipe fire sprinkler system with new ESFR sprinkler system in the high-pile storage area. Repair of sliding warehouse doors. Replacement of dock levelers. (Dry food) | Tyler Walbridge | active | |
| 50 | roofing | 2025-12-22 | AUSTIN | 12901 BROUGHTON WAY BLDG A | Installation of solar panels on existing residential roof. 6.16 kW. Addition of 1 0-30A circuits. 14 panels. Upgrade Electrical Service from Existing | David Conrad | active | |
| 50 | roofing | 2025-12-22 | AUSTIN | 12901 BROUGHTON WAY BLDG A | Installation of solar panels on existing residential roof. 6.16 kW. Addition of 1 0-30A circuits. 14 panels. Upgrade Electrical Service from Existing No Main Breaker/125A to New 125/200A 120/240V Single Phase. Temporary Disconnect / Reconnect Required for Installation | David Conrad | active | |
| 50 | roofing | 2025-12-19 | AUSTIN | 10402 D K RANCH RD | Fire Damage Repair drywall framing and roofing no changes in floor plan | $1 | Jose Snyder | active |
| 50 | roofing | 2025-12-16 | AUSTIN | 12624 ALBERTA RIDGE TRL | Express - Change front slope roof material to metal from shingles. Decking replacement during installation more than 128 ft required. | $1 | Stacie Feller | finaled |
| 50 | roofing | 2025-12-16 | AUSTIN | 1813 E 38TH HALF ST BLDG 1 UNIT 1B | Bldg. 1 Unit B: New construction 3-unit use duplex residential 3-story 4 bedroom 3.5 bath with covered front porch covered rear patio 3rd floor balcony and uncovered roof top deck. | Mark Henderson | active | |
| 50 | roofing | 2025-12-16 | AUSTIN | 1813 E 38TH HALF ST BLDG 2 | Bldg 2: New construction 3-unit use single-family residential 3-story 3 bedroom 2.5 bath with attached 1-car carport covered front porch covered rear patio 3rd floor balcony and uncovered roof top deck. | Mark Henderson | active | |
| 50 | roofing | 2025-12-16 | AUSTIN | 1813 E 38TH HALF ST BLDG 1 UNIT 1A | Bldg 1: New construction 3-unit use duplex residential: Unit A 3-story 4 bedroom 3.5 bath with attached 1-car carport covered front porch covered rear patio 3rd floor balcony and uncovered roof top deck. | Mark Henderson | active | |
| 50 | roofing | 2025-12-11 | AUSTIN | 1200 E RUNDBERG LN | Interior renovations new secure entry vestibule & security fencing re-roofing elevator replacement exterior facade renovations. PuPR2 | Selvan Wigley | active | |
| 50 | roofing | 2025-12-05 | AUSTIN | 6034 WEST COURTYARD DR | TPO roof overlay | finaled | ||
| 50 | roofing | 2025-12-05 | AUSTIN | 1405 BERKSHIRE DR | Express- 2600 sq ft [roof] decking removal and replacement | $1 | Nathan Navarro | active |
| 50 | roofing | 2025-12-01 | AUSTIN | 6101 HIGHLAND CAMPUS DR BLDG 3000 | Replacement of failing double doors within existing Building 3000; addition of card readers at three sets of doors; replacement of roof ladder with a | Ryan Ogle | active | |
| 50 | roofing | 2025-11-25 | AUSTIN | 7800 GINKGO CV | Express: Shingle roof replacement (Located in WUI) | $1 | Chris Dammert | finaled |
| 50 | roofing | 2025-11-20 | AUSTIN | 4817 CASWELL AVE | Express- Fire and smoke damage to property. Minor framing portion of roof siding windows insulation drywall. Will require electrical and plumbing perm | $1 | Michael Rose | active |
| 50 | roofing | 2025-11-18 | AUSTIN | 2810 ROCK TERRACE DR | THIS PROJECT INVOLVES THE REINFORCING OF THE EXISTING ROOF REPLACEMENT OF ROOFING AND REPLACEMENT OF REAR DECKING. IT ALSO INCLUDES THE REPLACEMENT OF | Adam Boone | finaled | |
| 50 | roofing | 2025-11-17 | AUSTIN | 300 CROCKETT ST UNIT 304 | Replacement of complete existing central heat and air system with or without duct work OUTDOOR UNIT IS ON ROOF TOP | Albert D'Andrea | finaled | |
| 50 | roofing | 2025-11-07 | AUSTIN | 1507 PARKWAY | Express: Remove and replace windows and siding like for like (submitted remodel separate) 1/29/26 SM - REVISED roof was a full replacement with multi | $1 | Lior Shaked | finaled |
| 50 | roofing | 2025-11-07 | AUSTIN | 2306 ROGGE LN | Express- Roof replacement. Removing old/damaged shingles decking and gutters. Replacing with new decking shingles and gutters. | $1 | Nathan Navarro | active |
| 50 | roofing | 2025-11-07 | AUSTIN | 3501 ALPINE CIR BLDG B | Installation of solar panels on existing residential roof. 6.16 kW. Addition of 1 0-30A circuits. 14 panels. | David Conrad | active | |
| 50 | roofing | 2025-11-04 | AUSTIN | 7008 JUNEBERRY CV | Express - Roof Replacement - shingles to standing seam metal roof | $1 | Michael Kastel | finaled |
| 50 | roofing | 2025-11-04 | AUSTIN | 904 W 22ND HALF ST | Removal and replacement of TPO flat roof metal panels and shingles around perimeter. | Matthew Quartaro | finaled | |
| 50 | roofing | 2025-10-30 | AUSTIN | 1114 TERRY DR | Express: Repairs due to fire damage (siding windows roof insulation drywall flooring cabinetry doors showers painting | $1 | Michael Rose | active |
| 50 | roofing | 2025-10-24 | AUSTIN | 7202 MARYWOOD CIR | Emergency Repair 200 AMP Panel Riser and Service Replacement due to storm damage | Mark Tullier | finaled | |
| 50 | roofing | 2025-10-02 | AUSTIN | 17228 RADIANT DR | Express- Installation of a 3.68 kW BIPV solar shingle system. Breaker tie-in. Shingles are nailed to the roof. This is a new construction home. Blue | Jared Vaught | active | |
| 50 | roofing | 2025-10-02 | AUSTIN | 17240 RADIANT DR | Express: Installation of a 3.68 KW BIPV solar shingle system breaker tie in shingles are nailed to the roof this is a new construction home Bluebonne | Jared Vaught | active | |
| 50 | roofing | 2025-10-02 | AUSTIN | 17224 RADIANT DR | Express- Installation of a 3.68 kW BIPV solar shingle system. Breaker tie-in. Shingles are nailed to the roof. This is a new construction home. Blue | Jared Vaught | active | |
| 50 | roofing | 2025-10-02 | AUSTIN | 17236 RADIANT DR | Express: Installation of a 3.68 KW BIPV solar shingle system breaker tie in shingles are nailed to the roof this is a new construction home Bluebonne | Jared Vaught | active | |
| 50 | roofing | 2025-10-02 | AUSTIN | 17232 RADIANT DR | Express: Installation of a 3.68 kW BIPV solar shingle system breaker tie in shingles are nailed to the roof This is a new construction home Bluebonne | Jared Vaught | active |