Permits
2,956 permits • page 6 of 30
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 55 | roofing | 2024-06-26 | AUSTIN | 7209 EASTCREST DR | ***NEW SOLAR PANELS ON NEW SOLAR SYSTEM*** Installation of solar panels on existing residential roof. 5.04 kW. | David Conrad | finaled | |
| 55 | roofing | 2024-06-26 | AUSTIN | 5905 LOS DIOS PL | ***NEW SOLAR PANELS ON NEW SOLAR SYSTEM*** Installation of solar panels on existing residential roof. 5.88 kW | David Conrad | finaled | |
| 55 | roofing | 2024-06-25 | AUSTIN | 1719 SPYGLASS DR BLDG 13 | New 3-story SFR *CONDO - PRODUCTION BUILDER* 3 bed/4.5 bath 2 car garage covered roof deck 145 sf uncovered roof deck | Randolph Taylor | finaled | |
| 55 | roofing | 2024-06-18 | AUSTIN | 1719 SPYGLASS DR BLDG 14 | New SFR with 3 bedrooms 3.5 bathrooms 2-Car Garage porch balcony covered/uncovered roof deck | Randolph Taylor | finaled | |
| 55 | roofing | 2024-06-17 | AUSTIN | 10513 HUXLEY ST | We plan to install an 8.8kW solar system on the residential roof. | Matthew Doran | finaled | |
| 55 | roofing | 2024-06-17 | AUSTIN | 1433 S MEADOWS DR | Installation of PV modules on existing residential roof. No ess | David Wright | finaled | |
| 55 | roofing | 2024-06-14 | AUSTIN | 405 LAVACA ST | New metal roof structure (non-enclosed) over an existing occupiable outdoor patio No change in occupancy or increase in impervious coverage. | finaled | ||
| 55 | roofing | 2024-06-13 | AUSTIN | 9104 CLEAROCK DR | Addition and Interior Remodel. new roof master bedroom addition to home. new windows and doors. new ext masonry cladding. | Gary Ouellette | finaled | |
| 55 | roofing | 2024-06-13 | AUSTIN | 9104 CLEAROCK DR | Addition and Interior Remodel. new roof master bedroom addition to home. new windows and doors. new ext masonry cladding. | Gary Ouellette | finaled | |
| 55 | roofing | 2024-06-13 | AUSTIN | 8013 BOTTLEBRUSH DR | Install new roof-mounted solar to existing single family residence. AE Existing Storage System | Wesley Davis | finaled | |
| 55 | roofing | 2024-06-13 | AUSTIN | 4220 W WILLIAM CANNON DR | Non-Structural Re-Roof to existing Commercial Building | active | ||
| 55 | roofing | 2024-06-13 | AUSTIN | 9104 CLEAROCK DR | Addition and Interior Remodel. new roof master bedroom addition to home. new windows and doors. new ext masonry cladding. | $1 | Gary Ouellette | finaled |
| 55 | roofing | 2024-06-13 | AUSTIN | 813 PARK BLVD | Addition & remodel to existing 2-story single family residential to include: new roof; masonry restoration; window & door restoration; new MEP systems | Abraham Algarin | active | |
| 55 | roofing | 2024-06-13 | AUSTIN | 8400 BRODIE LN | Non-Structural Re-Roof to existing Commercial Building | active | ||
| 55 | roofing | 2024-06-12 | AUSTIN | 5019 SHOAL CREEK BLVD | New 2-story 2 bedroom 2 bathroom secondary dwelling unit with attached garage covered front porch rear screened patio and 2nd floor uncovered roof bal | Khanh Pham | finaled | |
| 55 | roofing | 2024-06-12 | AUSTIN | 5019 SHOAL CREEK BLVD | New 2-story 2 bedroom 2 bathroom secondary dwelling unit with attached garage covered front porch rear screened patio and 2nd floor uncovered roof bal | $1 | Nhien Le | finaled |
| 55 | roofing | 2024-06-12 | AUSTIN | 5019 SHOAL CREEK BLVD | New 2-story 2 bedroom 2 bathroom secondary dwelling unit with attached garage covered front porch rear screened patio and 2nd floor uncovered roof bal | Feliberto Trevino | finaled | |
| 55 | roofing | 2024-06-12 | AUSTIN | 5019 SHOAL CREEK BLVD | New 2-story 2 bedroom 2 bathroom secondary dwelling unit with attached garage covered front porch rear screened patio and 2nd floor uncovered roof bal | Patrick George | finaled | |
| 55 | roofing | 2024-06-11 | AUSTIN | 2414 E 11TH ST | Install 7.29kW DC roof mounted solar system with 15kWh whole home backup | Mark Pride | finaled | |
| 55 | roofing | 2024-06-07 | AUSTIN | 1212 E ANDERSON LN WB | Kidd Roofing Wall Sign | finaled | ||
| 55 | roofing | 2024-06-05 | AUSTIN | 4901 STELLA LINK PATH | NEW - SFR 3 bdr 3 full bath 2 x 1/2 bath gameroom 2 car garage balcony covrd roof deck and porch | Robert Henderson | finaled | |
| 55 | roofing | 2024-06-03 | AUSTIN | 4502 NAVAJO PATH | Installation of 8.000 kW Photovoltaic system on roof of home. No MPU. Address at 4502 Navajo Path Austin Texas 78745 - Kristen Lowman | Marissa Johnson | finaled | |
| 55 | roofing | 2024-05-31 | AUSTIN | 1705 CHESTNUT AVE UNIT A | New 3-story 3 bedroom 3.5 bathroom principal single family residence with attached garage covered front porch rear covered patio and uncovered roof te | Felix Solorio | finaled | |
| 55 | roofing | 2024-05-30 | AUSTIN | 4202 CUMBRIA LN | We plan to install a 10.4kW Solar system on the residential roof. | Matthew Doran | finaled | |
| 55 | roofing | 2024-05-29 | AUSTIN | 6605 STARCREST LN | Installation of solar panels on the roof of the home. | Marco Chavez | finaled | |
| 55 | roofing | 2024-05-28 | AUSTIN | 6708 STARCREST LN | Installation of solar panels on the roof of the home. | Marco Chavez | finaled | |
| 55 | roofing | 2024-05-21 | AUSTIN | 919 E 37TH ST BLDG 2 | BLDG #2 New 2-Story ADU 2 Bed/2.5 Bath with attached garage covered porch balcony and roof deck | $1 | Dustin Thomas | active |
| 55 | roofing | 2024-05-15 | AUSTIN | 3104 LAFAYETTE AVE BLDG 2 | New 2-story 2 bedroom 2.5 bathroom secondary dwelling unit with attached garage covered porch 2nd floor screen porch and uncovered roof deck. Revisio | Mario Ramirez | finaled | |
| 55 | roofing | 2024-05-14 | AUSTIN | 1717 MORROW ST | Addition: Adding covered porches and adding a second floor to the home. Also doing interior remodel work. *Partial demo - Removing entire roofing and | Miguel Torres | finaled | |
| 55 | roofing | 2024-05-08 | AUSTIN | 14409 SPEARMINT TEA TRL | residential solar permit roof top | Mark Greene | finaled | |
| 55 | roofing | 2024-05-07 | AUSTIN | 4608 CALLISTO TER | Install PV modules on an existing residential roof. | David Wright | finaled | |
| 55 | roofing | 2024-05-06 | AUSTIN | 610 FAIRFIELD LN | Addition/Remodel of existing SFR remodel of light wood frame single story house over pier & beam. Existing roof framing to be removed new roof trusses | Sam E Eskew | finaled | |
| 55 | roofing | 2024-05-06 | AUSTIN | 16501 CASTLETROY DR | Installation of PV modules on existing residential roof. | David Wright | finaled | |
| 50 | roofing | 2026-10-15 | AUSTIN | 606 W ELIZABETH ST | Porch Enclosure- Enclose existing second floor balcony to create a sunroom. No expansion of building footprint of modification to existing roof columns beams or framing. EP added 9/28/2026 | Paul Bolin | active | |
| 50 | roofing | 2026-09-29 | AUSTIN | 1010 W GIBSON ST | New construction 2-unit use single-family residential 3-story 3 bedroom 3 bath with covered front porch covered side patio uncovered wood deck 2nd floor covered balcony covered 3rd floor balcony and uncovered roof-top deck. | Esequiel Solis | active | |
| 50 | roofing | 2026-09-25 | AUSTIN | 3801 RED RIVER ST | Bathroom addition to existing 1-story single family residence. New bath includes 2 sinks 1 wc 1 shower new windows new framing new siding new foundation and roof. 3 bed/2 bath | Terry Herrin | active | |
| 50 | roofing | 2026-09-24 | AUSTIN | 200 ARNULFO ALONSO WAY | ePlan: Commercial Expedited Review - Remodel to Existing PARD Recreation - including roof replacement abatement restoration of windows door chimneys electrical/plumbing upgrades new HVAC system and reconfiguration of restroom and support spaces (3169 SF) | Sergio Perez | active | |
| 50 | roofing | 2026-09-22 | AUSTIN | 609 BLANCO ST | roof replacement with TPO tapered insulation for positive drainage and potentially replace rotted plywood. | Judd Fults | active | |
| 50 | roofing | 2026-09-20 | AUSTIN | 1702 ELMIRA RD BLDG 3 | Bldg 3: New construction 3-unit use single-family residential 2-story 4 bedroom 3 bath with attached 1-car garage covered front porch covered rear patio covered roof deck and uncovered roof deck. | Jose A. Martinez | active | |
| 50 | roofing | 2026-09-20 | AUSTIN | 1702 ELMIRA RD BLDG 2 | Bldg2: New construction 3-unit use single-family residential 2-story 3 bedroom 3 bath with attached 1-car garage covered front porch covered rear patio and covered roof deck. | Jose A. Martinez | active | |
| 50 | roofing | 2026-09-16 | AUSTIN | 306 W JOHANNA ST | Express: Fire Damage Drywall insulation cabinetry trim flooring roof repair HVAC plumbing electrical windows. | $1 | Michael Rose | active |
| 50 | roofing | 2026-09-15 | AUSTIN | 309 ROWLAND DR | Addition/remodel- Garage conversion interior remodel with addition and full roof replacement. | Joe Moreno | active | |
| 50 | roofing | 2026-09-14 | AUSTIN | 17138 RADIANT DR | Installation of a 3.68 kW BIPV solar shingle system. This is part of a new home construction and the utility is Bluebonnet Electric Cooperative. Weve been instructed from both the plan reviewer supervisor and our inspectors that a Repair permit is what is needed for this. | Jared Vaught | finaled | |
| 50 | roofing | 2026-09-10 | AUSTIN | 200 ARNULFO ALONSO WAY | ePlan: Commercial Expedited Review - Remodel to Existing PARD Recreation - including roof replacement abatement restoration of windows door chimneys electrical/plumbing upgrades new HVAC system and reconfiguration of restroom and support spaces (3169 SF) | Manuel De Santiago | active | |
| 50 | roofing | 2026-09-09 | AUSTIN | 3801 RED RIVER ST | Bathroom addition to existing 1-story single family residence. New bath includes 2 sinks 1 wc 1 shower new windows new framing new siding new foundation and roof. 3 bed/2 bath | Reynaldo Loredo | active | |
| 50 | roofing | 2026-09-08 | AUSTIN | 9427 BRAEBURN GLEN ST | Removal of old service wire meter can. Removal of old residential panel 150 amp. Installation of riser through roof Installation of wiring and weather head and meter can. New Panel Installation. Austin Energy is the provider. | Raul Quintlen | finaled | |
| 50 | roofing | 2026-09-03 | AUSTIN | 11509 BRANDON PARKE TRL | Express- Full tear-off of the existing 2002 composition shingle roof to the deck; replace with Class 4 impact-resistant SBS-modified asphalt laminate shingles color Driftwood matching existing. New underlayment valley metal flashing 2 in. drip edge and vent replacement; damaged decking sheets replaced. Roof area 4248 sq ft pitch 9/12. No change to roof line pitch framing or structure and no structural member altered. WUI Zone C Class A covering. HOA approved 8/20/26. | $1 | Thomas Green | finaled |
| 50 | roofing | 2026-08-27 | AUSTIN | 1907 KENWOOD AVE UNIT A | Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit A: 3 bedroom 2 bath with front covered porch rear covered balcony and addition of foyer & HVAC closet. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT. | Ashton Booker | active | |
| 50 | roofing | 2026-08-26 | AUSTIN | 1702 ELMIRA RD BLDG 3 | Bldg 3: New construction 3-unit use single-family residential 2-story 4 bedroom 3 bath with attached 1-car garage covered front porch covered rear patio covered roof deck and uncovered roof deck. | Reynaldo Loredo | active | |
| 50 | roofing | 2026-08-26 | AUSTIN | 1702 ELMIRA RD BLDG 2 | Bldg2: New construction 3-unit use single-family residential 2-story 3 bedroom 3 bath with attached 1-car garage covered front porch covered rear patio and covered roof deck. | Reynaldo Loredo | active | |
| 50 | roofing | 2026-08-25 | AUSTIN | 11801 BUCKINGHAM RD | Express: Roof and deck replacement (not going past the decking) | $1 | Victoria Uzoni | active |
| 50 | roofing | 2026-08-25 | AUSTIN | 10610 LONDONSHIRE LN | EXPRESS: Reroof replacement WUI Zone C | $1 | Fareed Tulbah | finaled |
| 50 | roofing | 2026-08-20 | AUSTIN | 309 ROWLAND DR | Addition/remodel- Garage conversion interior remodel with addition and full roof replacement. | $1 | Geoffrey Snyder | active |
| 50 | roofing | 2026-08-20 | AUSTIN | 1010 W GIBSON ST | New construction 2-unit use single-family residential 3-story 3 bedroom 3 bath with covered front porch covered side patio uncovered wood deck 2nd floor covered balcony covered 3rd floor balcony and uncovered roof-top deck. | $1 | Leda Bastidas | active |
| 50 | roofing | 2026-08-18 | AUSTIN | 730 W STASSNEY LN UNIT 105 | Structural and interior repairs following a fire in the suite. Repairs include - replacement of damaged trusses metal roof decking and roof replacement for Suite 105 | Nathaniel Norris | active | |
| 50 | roofing | 2026-08-17 | AUSTIN | 4800 CONVICT HILL RD | Roof replacement and renovations to existing sanctuary to accommodate installation of new HVAC equipment. | Gerry Butts JR | active | |
| 50 | roofing | 2026-08-05 | AUSTIN | 910 W 25TH ST | Fire Damage Remediation and Rebuild on 3 Floors Multiple units 210 505 506 605 606. Project will require Mechanical and Electrical Roof repaid with structural letter stucco repair and sheetrock repair. Mold remediation letter will be required. | Chas West | finaled | |
| 50 | roofing | 2026-08-04 | AUSTIN | 2002 EAST SIDE DR | EXPRESS: Roof replacement | $1 | Drew Proctor | finaled |
| 50 | roofing | 2026-08-03 | AUSTIN | 3801 RED RIVER ST | Bathroom addition to existing 1-story single family residence. New bath includes 2 sinks 1 wc 1 shower new windows new framing new siding new foundation and roof. 3 bed/2 bath | $1 | David Mireles | active |
| 50 | roofing | 2026-07-30 | AUSTIN | 4800 CONVICT HILL RD | Roof replacement and renovations to existing sanctuary to accommodate installation of new HVAC equipment. | Michael Ambrose | active | |
| 50 | roofing | 2026-07-30 | AUSTIN | 4800 CONVICT HILL RD | Roof replacement and renovations to existing sanctuary to accommodate installation of new HVAC equipment. | John Haralson | active | |
| 50 | roofing | 2026-07-30 | AUSTIN | 12533 LABRADOR CV | Detach and reset for an already installed solar system due to hail damage and roof replacement. The current system will be detached and new higher wattage solar panels will be used with the original inverters. | David Davis | active | |
| 50 | roofing | 2026-07-29 | AUSTIN | 4000 AVENUE D | Storm Damage Repair - Service Rebuild | Jacob Rivera | finaled | |
| 50 | roofing | 2026-07-23 | AUSTIN | 3711 S MOPAC EXPY SVRD NB BLDG 2 | Replacement of exiting TPO roof for Building 1 & 2 Two Applications | Joseph Robertson | finaled | |
| 50 | roofing | 2026-07-23 | AUSTIN | 3711 S MOPAC EXPY SVRD NB BLDG 1 | Replacement of exiting TPO roof for Building 1 & 2 Two Applications | Joseph Robertson | finaled | |
| 50 | roofing | 2026-07-22 | AUSTIN | 301 W 29TH ST | 7 DAY - fire damage. Replace roof replace siding replace 2 balconies replace trusses drywall lights in corridor painting exterior. - OVA | Sarah Ewing | active | |
| 50 | roofing | 2026-07-22 | AUSTIN | 1509 WETHERSFIELD RD | Express: Fire damage repair 4/6/26 SM - REVISED**: Full interior remodel like for like. New roof New siding and sheathing New electrical plumbing and mechanical. | Christopher Woods | active | |
| 50 | roofing | 2026-07-17 | AUSTIN | 3300 NORTHEAST DR | Express: Re-roofing (located in WUI) - Replace hail-damaged composition roof with dimensional shingles and associated underlayment flashing drip edge pipe leads and like-kind vents. Work to comply with WUI requirements. No structural changes. | $1 | Douglas Redman | active |
| 50 | roofing | 2026-07-16 | AUSTIN | 3101 GOVALLE AVE | GAF TPO roof replacement system fully tapered insulation system. | Christopher Box | active | |
| 50 | roofing | 2026-07-16 | AUSTIN | 8000 RESEARCH BLVD SVRD SB | Replacement of (1) roof top unit - Like for like replacement | George Blaikie | active | |
| 50 | roofing | 2026-07-16 | AUSTIN | 1907 KENWOOD AVE UNIT B | Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit B: 3 bedroom 2 bath with rear covered patio. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT. | Cecilia Lopez | active | |
| 50 | roofing | 2026-07-15 | AUSTIN | 1702 ELMIRA RD BLDG 3 | Bldg 3: New construction 3-unit use single-family residential 2-story 4 bedroom 3 bath with attached 1-car garage covered front porch covered rear patio covered roof deck and uncovered roof deck. | $0 | Gerald Carter | active |
| 50 | roofing | 2026-07-15 | AUSTIN | 1702 ELMIRA RD BLDG 2 | Bldg2: New construction 3-unit use single-family residential 2-story 3 bedroom 3 bath with attached 1-car garage covered front porch covered rear patio and covered roof deck. | $0 | Gerald Carter | active |
| 50 | roofing | 2026-07-09 | AUSTIN | 10625 W PARMER LN | RE ROOF - remove old tpo membrane and replace with new tpo roofing - OVA | finaled | ||
| 50 | roofing | 2026-07-09 | AUSTIN | 601 BISSONET LN | Express: roof repair roof decking replacement | $1 | Jim Hardwick | finaled |
| 50 | roofing | 2026-07-08 | AUSTIN | 704 W 21ST ST | Replace existing roof structure due to fire damage plus minor exterior repairs as drawn and noted. | Jorge Bejarano | active | |
| 50 | roofing | 2026-07-06 | AUSTIN | 1006 E CESAR CHAVEZ ST | Express: Repairs due to fire damage (damaged to portion of rear floor joists and roof and smoke needs to be gutted to the studs and replaced inside fully not seeking trades until the remodel side) | $1 | Josh Hook | active |
| 50 | roofing | 2026-07-01 | AUSTIN | 2010 ALAMEDA DR | AISD Travis Heights Elementary School in Austin: project involves roof replacement at the Pre K classrooms cafeteria and gym electrical panel cover replacement at the gym stage installation of emergency lighting in classrooms and corridors replacement of Pre-K restroom doors; and construction of a new mental health center space. | Rafael Thrash | finaled | |
| 50 | roofing | 2026-06-30 | AUSTIN | 1023 E RIVERSIDE DR | Demo of existing roof and walls - Install new beam above garage doorway. Proposed building of a 2 Tier Deck above garage. Minor plumbing and electrical to add exterior sink and refrigerator electrical hook-up. Please note: Proposed deck is to be built over existing house footprint. No change to impervious. | Eleazar R Trevino | finaled | |
| 50 | roofing | 2026-06-30 | AUSTIN | 702 HUNTINGDON PL | WUI Compliance roof replacement. Removing shingles and installing a new class A fire-rated McElroy Medallion II 24-gauge standing seam metal roof system. Installing VanBoxel Prime SA High Temp self-adhered underlayment over the existing solid decking. No decking replacement is being performed. | $1 | Drew Proctor | finaled |
| 50 | roofing | 2026-06-30 | AUSTIN | 1402 PARKER LN BLDG 3 | Condominium Complex Single Replacement Like for Like. Simple reroof | Matthew Smith | finaled | |
| 50 | roofing | 2026-06-29 | AUSTIN | 1023 E RIVERSIDE DR | Demo of existing roof and walls - Install new beam above garage doorway. Proposed building of a 2 Tier Deck above garage. Minor plumbing and electrical to add exterior sink and refrigerator electrical hook-up. Please note: Proposed deck is to be built over existing house footprint. No change to impervious. add a gas line for this project | Eric Garcia | finaled | |
| 50 | roofing | 2026-06-26 | AUSTIN | 10517 BRODIE SPRINGS TRL | EXPRESS: Roof replacement Class A fire roofing material | $1 | Fareed Tulbah | finaled |
| 50 | roofing | 2026-06-25 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8523 | replacement of roof building 8523 - OVA | Amber Whitaker | finaled | |
| 50 | roofing | 2026-06-25 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8543 | Replacement of roof | Amber Whitaker | finaled | |
| 50 | roofing | 2026-06-25 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8541 | Replacement of roof. Existing multifamily building. | Amber Whitaker | finaled | |
| 50 | roofing | 2026-06-25 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8549 | Replacement of roof | Amber Whitaker | finaled | |
| 50 | roofing | 2026-06-25 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8545 | REPLACEMENT OF ROOF | Amber Whitaker | finaled | |
| 50 | roofing | 2026-06-25 | AUSTIN | 73 MILDRED ST | Express- Roof replacement with decking board replacement greater than 128 sq ft | $1 | Luke Miller | active |
| 50 | roofing | 2026-06-24 | AUSTIN | 1509 WETHERSFIELD RD | Express: Fire damage repair 4/6/26 SM - REVISED**: Full interior remodel like for like. New roof New siding and sheathing New electrical plumbing and mechanical. | Urban Wolff | active | |
| 50 | roofing | 2026-06-23 | AUSTIN | 1907 KENWOOD AVE UNIT B | Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit B: 3 bedroom 2 bath with rear covered patio. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT. | HERIDO MORALES | active | |
| 50 | roofing | 2026-06-23 | AUSTIN | 1907 KENWOOD AVE UNIT A | Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit A: 3 bedroom 2 bath with front covered porch rear covered balcony and addition of foyer & HVAC closet. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT. | Joe R Maldonado | active | |
| 50 | roofing | 2026-06-22 | AUSTIN | 9604 BELL MOUNTAIN DR | Express: Exterior siding/brick repair/replacement excess 128sq.ft. total roof replacement w/ WUI complaint metal roof window and door replacement size for size same locations | $1 | David Davison | active |
| 50 | roofing | 2026-06-19 | AUSTIN | 1625 BRUSHY VIEW CV | EMERGENCY REPAIR TO RISER ONLY FROM STORM DAMAGE. AE PULLED METER REPAIR WAS COMPLETED AND INSPECTED BY COA INSPECTOR SEAN MCMULLIN AND AE RECONNECTED SERVICE | Stephen J Provencio | finaled | |
| 50 | roofing | 2026-06-14 | AUSTIN | 8506 STILLWOOD LN | Express: Roof replacement with new decking | $1 | Cole Shiflet | finaled |
| 50 | roofing | 2026-06-12 | AUSTIN | 10402 D K RANCH RD | Fire Damage Repair drywall framing and roofing no changes in floor plan Revision 1: Add EP MP PP | Luis Olivares | active | |
| 50 | roofing | 2026-06-11 | AUSTIN | 10402 D K RANCH RD | Fire Damage Repair drywall framing and roofing no changes in floor plan Revision 1: Add EPMPPP | Mark Williams | finaled | |
| 50 | roofing | 2026-06-11 | AUSTIN | 1509 WETHERSFIELD RD | Express: Fire damage repair 4/6/26 SM - REVISED**: Full interior remodel like for like. New roof New siding and sheathing New electrical plumbing and mechanical. | Urban Wolff | active | |
| 50 | roofing | 2026-06-11 | AUSTIN | 6001 HIGHLANDALE DR | Replacing damaged riser/weatherhead (storm damage) and upgrading to 200amps | Cory Shope | finaled | |
| 50 | roofing | 2026-06-11 | AUSTIN | 1011 W 40TH ST | Replacement of any self-contained packaged units Removal and replacement like for like of 3 roof top package units. **Soithstate Bank | Christopher Gelina | active |