Permits
2,211 permits • page 6 of 23
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 50 | roofing | 2025-05-07 | AUSTIN | 5516 HELEN ST | Roof Replacement for Multi-Family Building | Dianna Cruickshank | finaled | |
| 50 | roofing | 2025-05-05 | AUSTIN | 3607 GREYSTONE DR | Roof Replacement: Remove Existing Shingles and Replace with Tamko Titan Shingles (Natural Timber) for Building 1 | Steven Needham | finaled | |
| 50 | roofing | 2025-05-01 | AUSTIN | 2915 AFTONSHIRE WAY BLDG 11 | Roof Replacement for Bldg. 11 | David Begala | finaled | |
| 50 | roofing | 2025-05-01 | AUSTIN | 2915 AFTONSHIRE WAY BLDG 17 | Roof Replacement for Bldg. 17 | David Begala | finaled | |
| 50 | roofing | 2025-05-01 | AUSTIN | 2915 AFTONSHIRE WAY BLDG 18 | Roof Replacement for Bldg. 18 | David Begala | finaled | |
| 50 | roofing | 2025-05-01 | AUSTIN | 2915 AFTONSHIRE WAY BLDG 5 | Roof Replacement for Bldg. 5 | David Begala | finaled | |
| 50 | roofing | 2025-05-01 | AUSTIN | 2915 AFTONSHIRE WAY BLDG 15 | Roof Replacement for Bldg. 15 | David Begala | finaled | |
| 50 | roofing | 2025-05-01 | AUSTIN | 2915 AFTONSHIRE WAY BLDG 4 | Roof Replacement for Bldg. 4 | David Begala | finaled | |
| 50 | roofing | 2025-05-01 | AUSTIN | 2915 AFTONSHIRE WAY BLDG 7 | Roof Replacement for Bldg. 7 | David Begala | finaled | |
| 50 | roofing | 2025-05-01 | AUSTIN | 2915 AFTONSHIRE WAY BLDG 13 | Roof Replacement for Bldg. 13 | David Begala | finaled | |
| 50 | roofing | 2025-05-01 | AUSTIN | 2915 AFTONSHIRE WAY BLDG 10 | Roof Replacement for Bldg. 10 | David Begala | finaled | |
| 50 | roofing | 2025-05-01 | AUSTIN | 2915 AFTONSHIRE WAY BLDG 20 | Roof Replacement for Bldg. 20 | David Begala | finaled | |
| 50 | roofing | 2025-05-01 | AUSTIN | 2915 AFTONSHIRE WAY BLDG 9 | Roof Replacement for Bldg. 9 | David Begala | finaled | |
| 50 | roofing | 2025-05-01 | AUSTIN | 2915 AFTONSHIRE WAY BLDG 2 | Roof Replacement for Bldg. 2 | David Begala | finaled | |
| 50 | roofing | 2025-05-01 | AUSTIN | 2915 AFTONSHIRE WAY BLDG 6 | Roof Replacement for Bldg. 6 | David Begala | finaled | |
| 50 | roofing | 2025-04-29 | AUSTIN | 3607 GREYSTONE DR | Roof Replacement: Remove Existing Shingles and Replace with Tamko Titan Shingles (Natural Timber) for Building 2 | Steven Needham | finaled | |
| 50 | roofing | 2025-04-29 | AUSTIN | 3607 GREYSTONE DR | Roof Replacement: Remove Existing Shingles and Replace with Tamko Titan Shingles (Natural Timber) for Building 5 | Steven Needham | finaled | |
| 50 | roofing | 2025-04-29 | AUSTIN | 3607 GREYSTONE DR | Roof Replacement: Remove Existing Shingles and Replace with Tamko Titan Shingles (Natural Timber) for Building 4 | Steven Needham | finaled | |
| 50 | roofing | 2025-04-29 | AUSTIN | 3607 GREYSTONE DR | Roof Replacement: Remove Existing Shingles and Replace with Tamko Titan Shingles (Natural Timber) for Building 6 | Steven Needham | finaled | |
| 50 | roofing | 2025-04-29 | AUSTIN | 3607 GREYSTONE DR | Roof Replacement: Remove Existing Shingles and Replace with Tamko Titan Shingles (Natural Timber) for Building 3 | Steven Needham | finaled | |
| 50 | roofing | 2025-04-28 | AUSTIN | 5910 COURTYARD DR | Roof Replacement for Existing Office Building | Molly Johnston | finaled | |
| 50 | roofing | 2025-04-25 | AUSTIN | 5106 VILLAGE SQUARE DR | Interior renovations outdoor learning court & security fencing re-roofing crawlspace piping replacement deferred maintenance etc. | Joe Garcia | finaled | |
| 50 | roofing | 2025-04-21 | AUSTIN | 4309 TRIBORO TRL | Express: Fire damage framing will be replaced roof will be redone painting new HVAC electrical flooring will be replaced upstairs. | Carlos Ruiz | active | |
| 50 | roofing | 2025-04-18 | AUSTIN | 5800 CLEMENTINE LN | Express: fire damage restoration including framing sheetrock painting plumbing electric hvac and roofing | Jonathan Perez | active | |
| 50 | roofing | 2025-04-14 | AUSTIN | 11500 N MOPAC EXPY SVRD SB BLDG B | Walk In Cooler Replacement Only with associated Mechanical Electrical and Roof for Building B | Juan Balderas | finaled | |
| 50 | roofing | 2025-04-09 | AUSTIN | 1801 E 51ST ST BLDG D | Re-roof existing commercial building | finaled | ||
| 50 | roofing | 2025-04-08 | AUSTIN | 2400 W BRAKER LN | Roof Replacement for Industrial Building E-G | Holly Zihlman | finaled | |
| 50 | roofing | 2025-04-07 | AUSTIN | 5800 CLEMENTINE LN | Express: fire damage restoration including framing sheetrock painting plumbing electric hvac and roofing | $1 | Wenjie Yang | active |
| 50 | roofing | 2025-03-31 | AUSTIN | 11500 N MOPAC EXPY SVRD SB BLDG B | Walk In Cooler Replacement Only with associated Mechanical Electrical and Roof for Building B | Tim Parker | finaled | |
| 50 | roofing | 2025-03-27 | AUSTIN | 11500 N MOPAC EXPY SVRD SB BLDG B | Walk In Cooler Replacement Only with associated Mechanical Electrical and Roof for Building B | Chris Reaves | finaled | |
| 50 | roofing | 2025-03-19 | AUSTIN | 3811 E 12TH ST | Replacement of exterior mechanical units roofing membrane and roof rigid insulation clerestory glazing sidewalks improvements new kitchen grease trap | Richard Gutierrez | active | |
| 50 | roofing | 2025-03-19 | AUSTIN | 3811 E 12TH ST | Replacement of exterior mechanical units roofing membrane and roof rigid insulation clerestory glazing sidewalks improvements new kitchen grease trap | Jack Payne | active | |
| 50 | roofing | 2025-03-19 | AUSTIN | 3811 E 12TH ST | Replacement of exterior mechanical units roofing membrane and roof rigid insulation clerestory glazing sidewalks improvements new kitchen grease trap | Richard Gutierrez | active | |
| 50 | roofing | 2025-03-10 | AUSTIN | 2708 RICHCREEK RD | Express: roof decking board replacement | $1 | Stacie Feller | finaled |
| 50 | roofing | 2025-03-05 | AUSTIN | 4309 TRIBORO TRL | Express: Fire damage framing will be replaced roof will be redone painting new HVAC flooring will be replaced upstairs. 7.16.25 Scope of work increa | Santiago Munguia | finaled | |
| 50 | roofing | 2025-03-05 | AUSTIN | 6011 MOUNTAIN VILLA DR | Interior Remodel New Roof Replace cedar board exterior finish with stucco replacement of exterior windows and doors plumbing relocation | Todd Cox | finaled | |
| 50 | roofing | 2025-03-04 | AUSTIN | 6011 MOUNTAIN VILLA DR | Interior Remodel New Roof Replace cedar board exterior finish with stucco replacement of exterior windows and doors plumbing relocation | Mark Henderson | finaled | |
| 50 | roofing | 2025-03-04 | AUSTIN | 2310 SANTA ROSA ST | Express: Roof replacement replace kitchen and washer outlets with GFCI replace ceiling fan replace siding on right side. | Benito Escobar | finaled | |
| 50 | roofing | 2025-03-03 | AUSTIN | 4309 TRIBORO TRL | Express: Fire damage framing will be replaced roof will be redone painting new HVAC electrical flooring will be replaced upstairs. 7.16.25 Scope of w | $1 | Jesus Padilla | active |
| 50 | roofing | 2025-03-03 | AUSTIN | 2106 LEAR LN | Express: Roof replacement standing seam metal roof installation | $1 | Ronnie Stone | finaled |
| 50 | roofing | 2025-03-03 | AUSTIN | 6011 MOUNTAIN VILLA DR | Interior Remodel New Roof Replace cedar board exterior finish with stucco replacement of exterior windows and doors plumbing relocation | Tu Huynh | finaled | |
| 50 | roofing | 2025-02-28 | AUSTIN | 2310 SANTA ROSA ST | Express: Roof replacement replace kitchen and washer outlets with GFCI replace ceiling fan replace siding on right side. | $1 | Christine Valdez | finaled |
| 50 | roofing | 2025-02-26 | AUSTIN | 4410 SOONER ST UNIT Q | EUD Repair storm damage to RV loop power for units Q and R | Mike Short | finaled | |
| 50 | roofing | 2025-02-24 | AUSTIN | 6920 MENCHACA RD | Replacement of any self-contained packaged units Sprouts Market # 125- Like-for-Like Replacement of (8) Roof Top Units ( 8.5 tons each). Electrical di | Todd Ernest | finaled | |
| 50 | roofing | 2025-02-14 | AUSTIN | 12207 MUSTANG CHASE | Addition remodel and new accessory Addition and remodel to existing residence garage conversion roof replacement and addition window replacement new | Adam Holman | finaled | |
| 50 | roofing | 2025-02-11 | AUSTIN | 12207 MUSTANG CHASE | Addition remodel and new accessory Addition and remodel to existing residence garage conversion roof replacement and addition window replacement new | Adam Holman | finaled | |
| 50 | roofing | 2025-02-10 | AUSTIN | 12005 HURRICANE HAZE DR | Installation of solar panels on existing residential roof. 6.02 kW. Addition of 2 0-30A circuits. 14 panels. | David Conrad | finaled | |
| 50 | roofing | 2025-02-03 | AUSTIN | 704 W 21ST ST | Replace existing roof structure due to fire damage plus minor exterior repairs as drawn and noted. | Cecyll Padilla | active | |
| 50 | roofing | 2025-01-09 | AUSTIN | 1012 ARTHUR STILES RD | Project seeks replacement of roof of existing building; replacement of existing failed roof membrane with new modified bitumen roofing system includin | Gary Hacker | finaled | |
| 50 | roofing | 2024-12-20 | AUSTIN | 4616 W HOWARD LN BLDG 6 | Roof Replacement: Remove Existing TPO and Insulation and Replace with TPO membrane over 3in ISO. For the fleece back overlay the existing roof system | Patrick Crotty | finaled | |
| 50 | roofing | 2024-12-20 | AUSTIN | 4616 W HOWARD LN BLDG 8 | Roof Replacement: Remove Existing TPO and Insulation and Replace with TPO membrane over 3in ISO. For the fleece back overlay the existing roof system | Patrick Crotty | finaled | |
| 50 | roofing | 2024-12-20 | AUSTIN | 4616 W HOWARD LN BLDG 4 | Roof Replacement: Remove Existing TPO and Insulation and Replace with TPO membrane over 3in ISO. For the fleece back overlay the existing roof system | Patrick Crotty | finaled | |
| 50 | roofing | 2024-12-20 | AUSTIN | 4616 W HOWARD LN BLDG 7 | Roof Replacement: Remove Existing TPO and Insulation and Replace with TPO membrane over 3in ISO. For the fleece back overlay the existing roof system | Patrick Crotty | finaled | |
| 50 | roofing | 2024-12-20 | AUSTIN | 4616 W HOWARD LN BLDG 5 | Roof Replacement: Remove Existing TPO and Insulation and Replace with TPO membrane over 3in ISO. For the fleece back overlay the existing roof system | Patrick Crotty | finaled | |
| 50 | roofing | 2024-12-19 | AUSTIN | 4616 W HOWARD LN BLDG 9 | Roof Replacement: Remove Existing TPO and Insulation and Replace with TPO membrane over 3in ISO. For the fleece back overlay the existing roof system | Patrick Crotty | finaled | |
| 50 | roofing | 2024-12-13 | AUSTIN | 8604 ALVERSTONE WAY | Addition and Remodel Interior remodel window/siding/roof replacement single story covered porch addition and new roof dormer window | Terry Herrin | finaled | |
| 50 | roofing | 2024-12-03 | AUSTIN | 1012 ARTHUR STILES RD | Project seeks replacement of roof of existing building; replacement of existing failed roof membrane with new modified bitumen roofing system includin | Mark Willis | finaled | |
| 50 | roofing | 2024-12-02 | AUSTIN | 4512 S PLEASANT VALLEY RD | Installation of 900 kw AC Roof Mounted Auxiliary Power System | finaled | ||
| 50 | roofing | 2024-11-19 | AUSTIN | 2011 S 3RD ST | Express: roof decking repair shingle repair (exempt) | $1 | finaled | |
| 50 | roofing | 2024-11-06 | AUSTIN | 2700 VIA FORTUNA | Roof Replacement. | Holly Zihlman | finaled | |
| 50 | roofing | 2024-10-31 | AUSTIN | 10101 WOODSTOCK DR | Express: Replace siding facia and soffit insulation Sheetrock repairs and roof replacement | $1 | Eyad Kasemi | finaled |
| 50 | roofing | 2024-10-29 | AUSTIN | 3811 E 12TH ST | REPLACEMENT OF THE EXISTING RECREATION CENTER GYM ASPHALT SHINGLE ROOF WITH A NEW STANDING SEAM METAL ROOF. | David Bernal | finaled | |
| 50 | roofing | 2024-10-25 | AUSTIN | 3106 LONGHORN BLVD | Roof Replacement | David Bernal | finaled | |
| 50 | roofing | 2024-10-23 | AUSTIN | 2105 DENTON DR | Re-roof Replacement | Holly Zihlman | finaled | |
| 50 | roofing | 2024-10-22 | AUSTIN | 12733 TESLA RD | TESLA - Parking Garage underground and above ground storm piping. Roof drains. No water heaters. 1743000 sq.ft. | David Youden | finaled | |
| 50 | roofing | 2024-10-22 | AUSTIN | 2600 MC HALE CT | Re-Roof Replacement | Holly Zihlman | finaled | |
| 50 | roofing | 2024-10-10 | AUSTIN | 6011 MOUNTAIN VILLA DR | Interior Remodel New Roof Replace cedar board exterior finish with stucco replacement of exterior windows and doors plumbing relocation | $1 | Eric Vogel | finaled |
| 50 | roofing | 2024-10-10 | AUSTIN | 8604 ALVERSTONE WAY | Addition and Remodel Interior remodel window/siding/roof replacement single story covered porch addition and new roof dormer window | HERIDO MORALES | finaled | |
| 50 | roofing | 2024-10-10 | AUSTIN | 8604 ALVERSTONE WAY | Addition and Remodel Interior remodel window/siding/roof replacement single story covered porch addition and new roof dormer window | CHRISTIAN SOTELO | finaled | |
| 50 | roofing | 2024-10-08 | AUSTIN | 13609 N IH 35 SVRD NB | Roof Replacement | Jennifer Stillman | finaled | |
| 50 | roofing | 2024-10-08 | AUSTIN | 8604 ALVERSTONE WAY | Addition and Remodel Interior remodel window/siding/roof replacement single story covered porch addition and new roof dormer window | $1 | Oscar Gomez | finaled |
| 50 | roofing | 2024-10-04 | AUSTIN | 8808 BALCONES CLUB DR | Express: Decking Replacement TPO replacement and shingle replacement on roof. | $1 | Sam Mott | finaled |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 19 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 20 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 11 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 13 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 15 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 9 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 10 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 8 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 1 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 6 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 4 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 12 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 17 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 2 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 5 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 16 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 3 | James Stewart | finaled | |
| 50 | roofing | 2024-10-01 | AUSTIN | 1044 CAMINO LA COSTA | Roof Replacement for Building 1-20 for Existing Multi-Family BLDG 14 | James Stewart | finaled | |
| 50 | roofing | 2024-09-30 | AUSTIN | 6101 PATTON RANCH RD | Partial renovation of existing Elementary School to include replacement of roof. | Tu Huynh | finaled | |
| 50 | roofing | 2024-09-30 | AUSTIN | 408 BLUEBERRY HILL | Express: Fire Loss General demo framing repairs roof replacement plumbing electrical HVAC siding drywall insulation cabinets finish carpentry repairs. | Jerome Bell | finaled | |
| 50 | roofing | 2024-09-27 | AUSTIN | 6101 PATTON RANCH RD | Partial renovation of existing Elementary School to include replacement of roof. | Richie Blevins | finaled | |
| 50 | roofing | 2024-09-26 | AUSTIN | 7217 ELLINGTON CIR | Express: smoke detector installation water heater replacement roofing replacement | Eusebio L Ortiz | finaled | |
| 50 | roofing | 2024-09-25 | AUSTIN | 2019 HARDY CIR | Express: Remove and Replace Plywood Roof Decking Roof Decking due to hail damage before replacing shingle roofing system (1667 sqft). | $1 | Sam Mott | finaled |
| 50 | roofing | 2024-09-20 | AUSTIN | 9200 WATERFORD CENTRE BLVD | Roof replacement | Holly Zihlman | finaled | |
| 50 | roofing | 2024-09-20 | AUSTIN | 9208 WATERFORD CENTRE BLVD | Roof replacement | Holly Zihlman | finaled | |
| 50 | roofing | 2024-09-19 | AUSTIN | 500 E 6TH ST | Roof Replacement for existing retail/office space | Molly Johnston | finaled | |
| 50 | roofing | 2024-09-16 | AUSTIN | 12207 MUSTANG CHASE | Addition remodel and new accessory Addition and remodel to existing residence garage conversion roof replacement and addition window replacement new | $1 | Adam Holman | finaled |
| 50 | roofing | 2024-09-11 | AUSTIN | 1416 MONTOPOLIS DR | Metal roof replacement at City of Austin Montopolis Neighborhood Center | Oscar Saenz | finaled |