Permits
2,202 permits • page 4 of 23
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 55 | roofing | 2024-06-13 | AUSTIN | 9104 CLEAROCK DR | Addition and Interior Remodel. new roof master bedroom addition to home. new windows and doors. new ext masonry cladding. | Gary Ouellette | finaled | |
| 55 | roofing | 2024-06-13 | AUSTIN | 9104 CLEAROCK DR | Addition and Interior Remodel. new roof master bedroom addition to home. new windows and doors. new ext masonry cladding. | Gary Ouellette | finaled | |
| 55 | roofing | 2024-06-13 | AUSTIN | 8013 BOTTLEBRUSH DR | Install new roof-mounted solar to existing single family residence. AE Existing Storage System | Wesley Davis | finaled | |
| 55 | roofing | 2024-06-13 | AUSTIN | 4220 W WILLIAM CANNON DR | Non-Structural Re-Roof to existing Commercial Building | active | ||
| 55 | roofing | 2024-06-13 | AUSTIN | 9104 CLEAROCK DR | Addition and Interior Remodel. new roof master bedroom addition to home. new windows and doors. new ext masonry cladding. | $1 | Gary Ouellette | finaled |
| 55 | roofing | 2024-06-13 | AUSTIN | 813 PARK BLVD | Addition & remodel to existing 2-story single family residential to include: new roof; masonry restoration; window & door restoration; new MEP systems | Abraham Algarin | active | |
| 55 | roofing | 2024-06-13 | AUSTIN | 8400 BRODIE LN | Non-Structural Re-Roof to existing Commercial Building | active | ||
| 55 | roofing | 2024-06-12 | AUSTIN | 5019 SHOAL CREEK BLVD | New 2-story 2 bedroom 2 bathroom secondary dwelling unit with attached garage covered front porch rear screened patio and 2nd floor uncovered roof bal | Khanh Pham | finaled | |
| 55 | roofing | 2024-06-12 | AUSTIN | 5019 SHOAL CREEK BLVD | New 2-story 2 bedroom 2 bathroom secondary dwelling unit with attached garage covered front porch rear screened patio and 2nd floor uncovered roof bal | $1 | Nhien Le | finaled |
| 55 | roofing | 2024-06-12 | AUSTIN | 5019 SHOAL CREEK BLVD | New 2-story 2 bedroom 2 bathroom secondary dwelling unit with attached garage covered front porch rear screened patio and 2nd floor uncovered roof bal | Feliberto Trevino | finaled | |
| 55 | roofing | 2024-06-12 | AUSTIN | 5019 SHOAL CREEK BLVD | New 2-story 2 bedroom 2 bathroom secondary dwelling unit with attached garage covered front porch rear screened patio and 2nd floor uncovered roof bal | Patrick George | finaled | |
| 55 | roofing | 2024-06-11 | AUSTIN | 2414 E 11TH ST | Install 7.29kW DC roof mounted solar system with 15kWh whole home backup | Mark Pride | finaled | |
| 55 | roofing | 2024-06-07 | AUSTIN | 1212 E ANDERSON LN WB | Kidd Roofing Wall Sign | finaled | ||
| 55 | roofing | 2024-06-05 | AUSTIN | 4901 STELLA LINK PATH | NEW - SFR 3 bdr 3 full bath 2 x 1/2 bath gameroom 2 car garage balcony covrd roof deck and porch | Robert Henderson | finaled | |
| 55 | roofing | 2024-06-03 | AUSTIN | 4502 NAVAJO PATH | Installation of 8.000 kW Photovoltaic system on roof of home. No MPU. Address at 4502 Navajo Path Austin Texas 78745 - Kristen Lowman | Marissa Johnson | finaled | |
| 55 | roofing | 2024-05-31 | AUSTIN | 1705 CHESTNUT AVE UNIT A | New 3-story 3 bedroom 3.5 bathroom principal single family residence with attached garage covered front porch rear covered patio and uncovered roof te | Felix Solorio | finaled | |
| 55 | roofing | 2024-05-30 | AUSTIN | 4202 CUMBRIA LN | We plan to install a 10.4kW Solar system on the residential roof. | Matthew Doran | finaled | |
| 55 | roofing | 2024-05-29 | AUSTIN | 6605 STARCREST LN | Installation of solar panels on the roof of the home. | Marco Chavez | finaled | |
| 55 | roofing | 2024-05-28 | AUSTIN | 6708 STARCREST LN | Installation of solar panels on the roof of the home. | Marco Chavez | finaled | |
| 55 | roofing | 2024-05-21 | AUSTIN | 919 E 37TH ST BLDG 2 | BLDG #2 New 2-Story ADU 2 Bed/2.5 Bath with attached garage covered porch balcony and roof deck | $1 | Dustin Thomas | active |
| 55 | roofing | 2024-05-15 | AUSTIN | 3104 LAFAYETTE AVE BLDG 2 | New 2-story 2 bedroom 2.5 bathroom secondary dwelling unit with attached garage covered porch 2nd floor screen porch and uncovered roof deck. Revisio | Mario Ramirez | finaled | |
| 55 | roofing | 2024-05-14 | AUSTIN | 1717 MORROW ST | Addition: Adding covered porches and adding a second floor to the home. Also doing interior remodel work. *Partial demo - Removing entire roofing and | Miguel Torres | finaled | |
| 55 | roofing | 2024-05-08 | AUSTIN | 14409 SPEARMINT TEA TRL | residential solar permit roof top | Mark Greene | finaled | |
| 55 | roofing | 2024-05-07 | AUSTIN | 4608 CALLISTO TER | Install PV modules on an existing residential roof. | David Wright | finaled | |
| 55 | roofing | 2024-05-06 | AUSTIN | 610 FAIRFIELD LN | Addition/Remodel of existing SFR remodel of light wood frame single story house over pier & beam. Existing roof framing to be removed new roof trusses | Sam E Eskew | finaled | |
| 55 | roofing | 2024-05-06 | AUSTIN | 16501 CASTLETROY DR | Installation of PV modules on existing residential roof. | David Wright | finaled | |
| 50 | roofing | 2026-04-21 | AUSTIN | 10819 HERMOSILLO DR | BLDG 2 - UNIT A (UNIT 1001 - 1007) WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS AND A ROOF TOP PATIO. | Seth Robinson | finaled | |
| 50 | roofing | 2026-04-15 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 9 | Shingle Replacement | Brad Davis | active | |
| 50 | roofing | 2026-03-31 | AUSTIN | 9209 ROCK CASTLE CV | EXPRESS: Roof replacement | $1 | Jacob Lange | active |
| 50 | roofing | 2026-03-25 | AUSTIN | 2815 RIO GRANDE ST | Shingle roof replacement. Condominiums. | Zachary Crowell | active | |
| 50 | roofing | 2026-03-23 | AUSTIN | 7006 JUNEBERRY CV | EXPRESS: Refoof due to hail damage. Replacing underlayment shingles drip edge pipe jack flashing and gutters. | $1 | Michael Kastel | finaled |
| 50 | roofing | 2026-03-19 | AUSTIN | 910 W 22ND HALF ST | Express: replace one window like-for-like replace rotted wood/siding drywall repair roof repair exempt work (garage door replacement door replacement) | Juan Martinez | finaled | |
| 50 | roofing | 2026-03-18 | AUSTIN | 1100 SUMMIT ST | express existing uncovered wood deck due to fire damage Eric Thomas approved for this to be processed as express fire damage Revision: Re-roof stru | Robert Salgado | active | |
| 50 | roofing | 2026-03-13 | AUSTIN | 8617 COBBLESTONE | EXPRESS: Replace whole shingle roof due to hail damage | $1 | Ben Keiderling | finaled |
| 50 | roofing | 2026-03-05 | AUSTIN | 6602 LAIRD DR | Express: siding repair stone removal roof replacement | $1 | Lane White | active |
| 50 | roofing | 2026-03-05 | AUSTIN | 3110 VAL DR | Express: siding repair brick repair roof replacement | $1 | Lane White | active |
| 50 | roofing | 2026-03-04 | AUSTIN | 12207 MUSTANG CHASE | Addition remodel and new accessory Addition and remodel to existing residence garage conversion roof replacement and addition window replacement new | Adam Holman | finaled | |
| 50 | roofing | 2026-03-04 | AUSTIN | 1821 DIRECTORS BLVD | Replacement of any self-contained packaged units Change out of RTUs and split systems. Work will take place on the roof and ceiling spaces of levels 1 | James Marek | finaled | |
| 50 | roofing | 2026-03-04 | AUSTIN | 9330 UNITED DR BLDG 4 | Replacement of any self-contained packaged units Scope of work: Replacing 2 roof top units like for like with no modifications. RTU#1 7.5 ton & RTU#2 | Jacob Lee Phillips | finaled | |
| 50 | roofing | 2026-03-04 | AUSTIN | 910 W 22ND HALF ST | Express: replace one window like-for-like replace rotted wood/siding drywall repair roof repair exempt work (garage door replacement door replacement) | $1 | Steve Johnson | finaled |
| 50 | roofing | 2026-03-03 | AUSTIN | 1114 TERRY DR | Express: Repairs due to fire damage (siding windows roof insulation drywall flooring cabinetry doors showers painting | Dwight LaBran | active | |
| 50 | roofing | 2026-03-02 | AUSTIN | 800 BANISTER LN | Shingle Roof Replacement only. | Zachary Crowell | active | |
| 50 | roofing | 2026-02-26 | AUSTIN | 2211 W BRAKER LN | Replacement of any self-contained packaged units change out one Trane roof top unit model ysk090a4sol000 460 volt unit. | Clayton Daniel | active | |
| 50 | roofing | 2026-02-23 | AUSTIN | 5510 HITCHER BND | Express: roof shingle replacement in WUI | $1 | Dennis Kashkin | active |
| 50 | roofing | 2026-02-18 | AUSTIN | 6801 JESTER BLVD | Replacement of existing deck siding and roof. Partial raising of interior floor. Remodel of deck to match height of interior/avoid entry steps. Slight | $1 | Nick Chappell | active |
| 50 | roofing | 2026-02-17 | AUSTIN | 2107 FALCON HILL DR | Ice storm damage. Replace damaged 2 inch conduit riser. | Dustin Roberts | active | |
| 50 | roofing | 2026-02-17 | AUSTIN | 13450 N US 183 HWY SVRD SB | TPO Roof Overlay | active | ||
| 50 | roofing | 2026-02-11 | AUSTIN | 730 W STASSNEY LN UNIT 105 | Structural and interior repairs following a fire in the suite. Repairs include - replacement of damaged trusses metal roof decking and roof replacemen | GREGORY PADALECKI | active | |
| 50 | roofing | 2026-02-11 | AUSTIN | 1114 TERRY DR | Express: Repairs due to fire damage (siding windows roof insulation drywall flooring cabinetry doors showers painting | Eddie Guerrero | active | |
| 50 | roofing | 2026-02-06 | AUSTIN | 1200 E RUNDBERG LN | Interior renovations new secure entry vestibule & security fencing re-roofing elevator replacement exterior facade renovations. PuPR2 | Richard Minyard | active | |
| 50 | roofing | 2026-02-04 | AUSTIN | 1114 TERRY DR | Express: Repairs due to fire damage (siding windows roof insulation drywall flooring cabinetry doors showers painting | Edgar Tafolla | active | |
| 50 | roofing | 2026-01-22 | AUSTIN | 5601 MENCHACA RD | Re-Roofing and replacement of roof drains. Installation of new Windows at adjacent wall to allow for added insulation taper. Roof drain piping to be i | Gregory Lee Gaddy | finaled | |
| 50 | roofing | 2026-01-20 | AUSTIN | 5601 MENCHACA RD | Re-Roofing and replacement of roof drains. Installation of new Windows at adjacent wall to allow for added insulation taper. Roof drain piping to be i | Katherine Webb | finaled | |
| 50 | roofing | 2026-01-13 | AUSTIN | 1200 E RUNDBERG LN | Interior renovations new secure entry vestibule & security fencing re-roofing elevator replacement exterior facade renovations. PuPR2 | Vincent Gillette | active | |
| 50 | roofing | 2025-12-22 | AUSTIN | 12901 BROUGHTON WAY BLDG A | Installation of solar panels on existing residential roof. 6.16 kW. Addition of 1 0-30A circuits. 14 panels. Upgrade Electrical Service from Existing | David Conrad | active | |
| 50 | roofing | 2025-12-19 | AUSTIN | 10402 D K RANCH RD | Fire Damage Repair drywall framing and roofing no changes in floor plan | $1 | Jose Snyder | active |
| 50 | roofing | 2025-12-16 | AUSTIN | 12624 ALBERTA RIDGE TRL | Express - Change front slope roof material to metal from shingles. Decking replacement during installation more than 128 ft required. | $1 | Stacie Feller | finaled |
| 50 | roofing | 2025-12-11 | AUSTIN | 1200 E RUNDBERG LN | Interior renovations new secure entry vestibule & security fencing re-roofing elevator replacement exterior facade renovations. PuPR2 | Selvan Wigley | active | |
| 50 | roofing | 2025-12-05 | AUSTIN | 6034 WEST COURTYARD DR | TPO roof overlay | finaled | ||
| 50 | roofing | 2025-12-05 | AUSTIN | 1405 BERKSHIRE DR | Express- 2600 sq ft [roof] decking removal and replacement | $1 | Nathan Navarro | active |
| 50 | roofing | 2025-12-01 | AUSTIN | 6101 HIGHLAND CAMPUS DR BLDG 3000 | Replacement of failing double doors within existing Building 3000; addition of card readers at three sets of doors; replacement of roof ladder with a | Ryan Ogle | active | |
| 50 | roofing | 2025-11-25 | AUSTIN | 7800 GINKGO CV | Express: Shingle roof replacement (Located in WUI) | $1 | Chris Dammert | finaled |
| 50 | roofing | 2025-11-20 | AUSTIN | 4817 CASWELL AVE | Express- Fire and smoke damage to property. Minor framing portion of roof siding windows insulation drywall. Will require electrical and plumbing perm | $1 | Michael Rose | active |
| 50 | roofing | 2025-11-18 | AUSTIN | 2810 ROCK TERRACE DR | THIS PROJECT INVOLVES THE REINFORCING OF THE EXISTING ROOF REPLACEMENT OF ROOFING AND REPLACEMENT OF REAR DECKING. IT ALSO INCLUDES THE REPLACEMENT OF | Adam Boone | finaled | |
| 50 | roofing | 2025-11-17 | AUSTIN | 300 CROCKETT ST UNIT 304 | Replacement of complete existing central heat and air system with or without duct work OUTDOOR UNIT IS ON ROOF TOP | Albert D'Andrea | finaled | |
| 50 | roofing | 2025-11-07 | AUSTIN | 1507 PARKWAY | Express: Remove and replace windows and siding like for like (submitted remodel separate) 1/29/26 SM - REVISED roof was a full replacement with multi | $1 | Lior Shaked | finaled |
| 50 | roofing | 2025-11-07 | AUSTIN | 2306 ROGGE LN | Express- Roof replacement. Removing old/damaged shingles decking and gutters. Replacing with new decking shingles and gutters. | $1 | Nathan Navarro | active |
| 50 | roofing | 2025-11-07 | AUSTIN | 3501 ALPINE CIR BLDG B | Installation of solar panels on existing residential roof. 6.16 kW. Addition of 1 0-30A circuits. 14 panels. | David Conrad | active | |
| 50 | roofing | 2025-11-04 | AUSTIN | 7008 JUNEBERRY CV | Express - Roof Replacement - shingles to standing seam metal roof | $1 | Michael Kastel | finaled |
| 50 | roofing | 2025-11-04 | AUSTIN | 904 W 22ND HALF ST | Removal and replacement of TPO flat roof metal panels and shingles around perimeter. | Matthew Quartaro | finaled | |
| 50 | roofing | 2025-10-30 | AUSTIN | 1114 TERRY DR | Express: Repairs due to fire damage (siding windows roof insulation drywall flooring cabinetry doors showers painting | $1 | Michael Rose | active |
| 50 | roofing | 2025-10-24 | AUSTIN | 7202 MARYWOOD CIR | Emergency Repair 200 AMP Panel Riser and Service Replacement due to storm damage | Mark Tullier | finaled | |
| 50 | roofing | 2025-10-02 | AUSTIN | 17228 RADIANT DR | Express- Installation of a 3.68 kW BIPV solar shingle system. Breaker tie-in. Shingles are nailed to the roof. This is a new construction home. Blue | Jared Vaught | active | |
| 50 | roofing | 2025-10-02 | AUSTIN | 17240 RADIANT DR | Express: Installation of a 3.68 KW BIPV solar shingle system breaker tie in shingles are nailed to the roof this is a new construction home Bluebonne | Jared Vaught | active | |
| 50 | roofing | 2025-10-02 | AUSTIN | 17224 RADIANT DR | Express- Installation of a 3.68 kW BIPV solar shingle system. Breaker tie-in. Shingles are nailed to the roof. This is a new construction home. Blue | Jared Vaught | active | |
| 50 | roofing | 2025-10-02 | AUSTIN | 17236 RADIANT DR | Express: Installation of a 3.68 KW BIPV solar shingle system breaker tie in shingles are nailed to the roof this is a new construction home Bluebonne | Jared Vaught | active | |
| 50 | roofing | 2025-10-02 | AUSTIN | 17232 RADIANT DR | Express: Installation of a 3.68 kW BIPV solar shingle system breaker tie in shingles are nailed to the roof This is a new construction home Bluebonne | Jared Vaught | active | |
| 50 | roofing | 2025-09-26 | AUSTIN | 2104 S L DAVIS AVE UNIT 1B | Unit B New construction of 3 story Duplex with roof top uncovered patio 3/2.5 | Samuel Rojas | active | |
| 50 | roofing | 2025-09-24 | AUSTIN | 6636 W WILLIAM CANNON DR UNIT 317 | Interior Remodel to Units due to Fire Damage replacing drywall cabinets flooring and finishes: 15 Roof Trusses will be replaced; replace damaged elect | Stephen Abila | finaled | |
| 50 | roofing | 2025-09-24 | AUSTIN | 6636 W WILLIAM CANNON DR UNIT 327 | Interior Remodel to Units due to Fire Damage replacing drywall cabinets flooring and finishes: 15 Roof Trusses will be replaced; replace damaged elect | Stephen Abila | finaled | |
| 50 | roofing | 2025-09-23 | AUSTIN | 2104 S L DAVIS AVE UNIT 1A | Unit A New construction of 3 story Duplex with roof top uncovered patio 3/2.5 | Samuel Rojas | active | |
| 50 | roofing | 2025-09-18 | AUSTIN | 6636 W WILLIAM CANNON DR UNIT 327 | Interior Remodel to Units due to Fire Damage replacing drywall cabinets flooring and finishes: 15 Roof Trusses will be replaced; replace damaged elect | James Garcia | finaled | |
| 50 | roofing | 2025-09-10 | AUSTIN | 809 PARK BLVD | Exterior: Siding Moisture Barrier Insulation and Roof Repair Electric Plumbing and HVAC update and replacement Interior: Drywall Moving interior wall | Victor Puente | active | |
| 50 | roofing | 2025-09-09 | AUSTIN | 6636 W WILLIAM CANNON DR UNIT 317 | Interior Remodel to Units due to Fire Damage replacing drywall cabinets flooring and finishes: 15 Roof Trusses will be replaced; replace damaged elect | James Garcia | finaled | |
| 50 | roofing | 2025-09-04 | AUSTIN | 6502 HICKMAN AVE | Express: Window for window replacement door for door replacement replace shingles only on roof replace estimated 1000 sqft of hardie siding | $1 | Yusuf Johnson | active |
| 50 | roofing | 2025-09-04 | AUSTIN | 705 W 29TH ST | Remodel: Repairing water damage mold and tree damage. Building footprint has not changed--same height width and form. Replacing rotten wood and roof. | Cordell A. Mayer | finaled | |
| 50 | roofing | 2025-09-04 | AUSTIN | 6506 HICKMAN AVE | Express: Window for window replacement door for door replacement replace shingles only on roof replace estimated 1000 sqft of hardie siding | $1 | Yusuf Johnson | active |
| 50 | roofing | 2025-09-04 | AUSTIN | 6504 HICKMAN AVE | Express: Window for window replacement door for door replacement replace shingles only on roof replace estimated 1000 sqft of hardie siding | $1 | Yusuf Johnson | active |
| 50 | roofing | 2025-08-29 | AUSTIN | 7581 CHEVY CHASE DR | TPO Roof Replacement Shingle **Building 24** | Michael Garcia | finaled | |
| 50 | roofing | 2025-08-29 | AUSTIN | 7581 CHEVY CHASE DR | TPO Roof Replacement Shingle **Building 29** | Michael Garcia | finaled | |
| 50 | roofing | 2025-08-29 | AUSTIN | 7581 CHEVY CHASE DR | TPO Roof Replacement Shingle **Building 31** | Michael Garcia | finaled | |
| 50 | roofing | 2025-08-29 | AUSTIN | 7581 CHEVY CHASE DR | TPO Roof Replacement Shingle **Building 20** | Michael Garcia | finaled | |
| 50 | roofing | 2025-08-29 | AUSTIN | 7581 CHEVY CHASE DR | TPO Roof Replacement Shingle **Building 25** | Michael Garcia | finaled | |
| 50 | roofing | 2025-08-29 | AUSTIN | 7581 CHEVY CHASE DR | TPO Roof Replacement Shingle **Building 30** | Michael Garcia | finaled | |
| 50 | roofing | 2025-08-29 | AUSTIN | 7581 CHEVY CHASE DR | TPO Roof Replacement Shingle **Building 28** | Michael Garcia | finaled | |
| 50 | roofing | 2025-08-29 | AUSTIN | 7581 CHEVY CHASE DR | TPO Roof Replacement Shingle **Building 26** | Michael Garcia | finaled | |
| 50 | roofing | 2025-08-29 | AUSTIN | 7581 CHEVY CHASE DR | TPO Roof Replacement Shingle **Building 27** | Michael Garcia | finaled | |
| 50 | roofing | 2025-08-28 | AUSTIN | 705 W 29TH ST | Remodel: Repairing water damage mold and tree damage. Building footprint has not changed--same height width and form. Replacing rotten wood and roof. | Tishay King | finaled | |
| 50 | roofing | 2025-08-27 | AUSTIN | 705 W 29TH ST | Remodel: Repairing water damage mold and tree damage. Building footprint has not changed--same height width and form. Replacing rotten wood and roof. | Randy Niemann | active | |
| 50 | roofing | 2025-08-27 | AUSTIN | 4101 JAMES CASEY ST UNIT 100 | Renovation of 1600 sq ft of an Existing Medical Office Building to Support Equipment Change out. Select Demo of Non-load bearing. Replacement of Roof | James Smith | finaled |