PPermitDrop

Permits

2,502 permits • page 2 of 26

Export CSV
ScoreTradeDateCityAddressDescriptionValueContractorStatus
65solar2026-08-06AUSTIN12313 LITTLE EMILY WAYBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-08-05AUSTIN4907 TENISON CTDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Chadwyck Preeceactive
65solar2026-08-04AUSTIN13500 BROADMEADE AVEDudley 39-98323 - Install new _6.8__kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
65solar2026-08-03AUSTIN1341 W MARY ST BLDG 1Installing 130.35 kW Solar System with 237ALEX-550-W panels and 2 CPS SCA60KTL-DO/US-480.James Hiebertactive
65solar2026-07-29AUSTIN2100 WILLKOMEN WAYAccording to Patrick Kuhn with AE the solar PV meter was removed by AE crews due to damage to the Polaris tabs. This has since been repaired. AE has already installed a standard residential service meter because the house is occupied only a standard electric permit was open and only a standard temporary disconnect/reconnect was scheduled. As per Patrick Kuhns instruction I am now requesting an auxiliary power electrical permit be open so we can get the solar inspection scheduled and completed and then get AE to install the PV meter.Seth Robinsonfinaled
65solar2026-07-27AUSTIN2303 SUNNY SLOPE DR7.36kW rooftop solar installMark Prideactive
65solar2026-06-22AUSTIN7117 HOWERINGTON CIRInstalling a backup battery system and additional meter socket.Martin Rodriguezapplied
65solar2026-06-11AUSTIN6200 LOST HORIZON DRHuckabee - 39-53028 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps.Mark Bedellactive
65solar2026-06-01AUSTIN3708 LAUREL LEDGE LNDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Chadwyck Preeceactive
65solar2026-05-05AUSTIN508 SOUTH PARK DR1.Replacing an interior sub panel with new one. 2. Replace two kitchen outlets with GFCI 3.install 5 battery smoke detectors 4. Replace three outletsChristian Jimenezfinaled
65solar2026-05-05AUSTIN13003 MARIMBA TRLHomeowner had solar installed by a previous contractor then abandoned prior to commissioning/inspections. Service needs to be moved per Austin EnergyLouis Botelloactive
65solar2026-02-02AUSTIN8301 JOHNNY MORRIS RDINstallation of 331.58 kW rooftop PV system$595,994Chadwyck Preeceactive
65solar2026-02-02AUSTIN8301 JOHNNY MORRIS RDInstallation of 198.24 kW rooftop PV system$317,432Chadwyck Preeceactive
65solar2026-02-02AUSTIN8301 JOHNNY MORRIS RDInstallation of 368.16 kW rooftop PV system$669,414Chadwyck Preeceactive
65solar2026-02-02AUSTIN8301 JOHNNY MORRIS RDInstallation of 247.24 kW rooftop PV system$470,749Chadwyck Preeceactive
65solar2025-11-18AUSTIN2400 S CONGRESS AVECommercial rooftop Solar installation 770.18 kw DC.$52,000Lloyd Leeactive
65solar2025-07-21AUSTIN4825 TRAIL CREST CIRexpress - solar - disconnect/reconnect is needed for the removal and replacement of the meters at existing residential home. the homes siding is beingDavid Wrightfinaled
65solar2025-07-08AUSTIN4825 TRAIL CREST CIRexpress - solar - disconnect/reconnect is needed for the removal and replacement of the meters at existing residential home. the homes siding is beingDavid Wrightfinaled
65solar2025-07-01AUSTIN4825 TRAIL CREST CIRexpress - solar - disconnect/reconnect is needed for the removal and replacement of the meters at existing residential home. the homes siding is being$1David Wrightactive
65solar2024-06-17AUSTIN3917 CAL RODGERS STInstall new 4.20 KWDC rooftop solar system servicing existing residential only to completely replace old & hail damaged solar system.Frederico Lopezfinaled
60solar2026-08-28AUSTIN15917 NARCISSUS WAYINSTALLTION OF A 6.9 SOLAR PANEL SYSTEM WITH 15 PANELS 15 MICRO-INVERTERSLogan Stoneactive
60solar2026-08-28AUSTIN9517 WIGGY WAYSOLAR PANEL INSTALLTION WITH A SYSTEM SIZE OF 12.42KWLogan Stoneactive
60solar2026-08-28AUSTIN2801 E HOWARD LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
60solar2026-08-28AUSTIN5711 FAIRLANE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
60solar2026-08-26AUSTIN1620 S IH 35 SVRD SBInstalling 121 KW Solar System with 220 ALEX-550-W panels and 4 SCA25KTL-DO to Existing Storage FacilityOrtiz Mosesactive
60solar2026-08-26AUSTIN15108 LARIAT TRLDisconnect/reconnect to repair pv/ESS components. AE meter tag required to be cut for SOW. We are not upgrading the size of the service not upgrading the meter size.Chadwyck Preeceactive
60solar2026-08-26AUSTIN15936 NARCISSUS WAYINSTALLTION OF A 6.44kW SOLAR SYSTEMLogan Stoneactive
60solar2026-08-25AUSTIN3404 THOMAS KINCHEON ST BLDG 1adding a solar rooftop system to an existing buildingDavid Davisactive
60solar2026-08-25AUSTIN14126 EDNA MAXINE WALKSOLAR INSTALLTION OF A 6.44 SOLAR SYSTEMLogan Stoneactive
60solar2026-08-25AUSTIN6021 ALFRED ACRES DRINSTALLTION OF A 6.15 SOLAR SYSTEAM WITH 15 PANELS AND 15 MICRO-INVERTESLogan Stoneactive
60solar2026-08-24AUSTIN1620 S IH 35 SVRD SBInstalling 121 KW Solar System with 220 ALEX-550-W panels and 4 SCA25KTL-DO to Existing Storage FacilityJames Hiebertactive
60solar2026-08-13AUSTIN408 RACETRACK DRWarren - 40-02307 - Install new 3.8 kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
60solar2026-08-13AUSTIN3301 HIBBETTS RD1.7 MW roof top PV solar installation with microinvertersWilliam Duhonactive
60solar2026-08-13AUSTIN1401 ART DILLY DRInstallation of a 253.55 kW roof mounted solar PV system. Install includes modules inverters racking and other necessary equipment.Nicolas Espinozaactive
60solar2026-08-12AUSTIN14016 TYBURN TRLInstallation of a new residential roof-mounted solar photovoltaic system with battery energy storage at 14016 Tyburn Trl Austin TX 78717. The electric utility provider is Pedernales Electric Cooperative. Work includes PV modules mounting equipment inverter/microinverters battery energy-storage equipment disconnects conduit wiring rapid shutdown labeling and utility-interconnection equipment in accordance with the approved plans manufacturer specifications and applicable codes. This is a new installation.Marissa Johnsonfinaled
60solar2026-08-11AUSTIN7100 WINDRIFT WAYGriffin - 40-01171 - Install new 11.4 kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
60solar2026-08-05AUSTIN5507 AVENUE FArneson - 39-96024 Install new 3.8kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
60solar2026-08-05AUSTIN11000 PLAYERS PATHShearhart - 39-95875 Install new 5.76kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellfinaled
60solar2026-08-04AUSTIN9928 THANE WAYInstall new energy storage system to existing single family residence. Underground AEWesley Davisfinaled
60solar2026-02-19AUSTIN900 SPRINGDALE RDInstall a pergola with solar panels attached to the top$60,000Jeffrey Shedfinaled
55solar2026-08-25AUSTIN10700 PURSLANE CVBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-25AUSTIN3107 SILVERLEAF DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-25AUSTIN10201 KABAR TRLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-25AUSTIN1513 PASADENA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-25AUSTIN1902 STEAMBOAT SPRINGS CVBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-25AUSTIN4005 GREYSTONE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-25AUSTIN1906 W 40TH STBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-25AUSTIN1503 ARCILLA STBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-25AUSTIN2105 E 10TH STBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-25AUSTIN4610 BANISTER LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-25AUSTIN6634 LOST HORIZON DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-25AUSTIN6408 WILLIAMS RIDGE WAYBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-25AUSTIN3106 GREENLAWN PKWYBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-25AUSTIN11615 ELK PARK TRLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-25AUSTIN6602 VINE STBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-25AUSTIN6400 WILLIAMS RIDGE WAYBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-20AUSTIN1309 CHICON STRooftop Solar Line-Side Tap Interconnection for Existing Multi-Family Building Requires Electrical Permit and Auxiliary Electrical Permit.Mark Prideactive
55solar2026-08-20AUSTIN1309 CHICON STRooftop Solar Line-Side Tap Interconnection for Existing Multi-Family Building Requires Electrical Permit and Auxiliary Electrical Permit.Mark Prideactive
55solar2026-08-18AUSTIN4709 CHRISTOPHER DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN6400 LEDGE MOUNTAIN DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN2927 CHATELAINE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN5813 HIGHLAND HILLS DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN1111 KIRK AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN3005 WHITEWAY DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN7400 RAIN CREEK PKWYBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN2700 OAKHURST AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN4041 ENCLAVE MESA CIRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN1509 INGLEWOOD STBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN8400 LA NARANJA CVBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN12407 WEST COW PATHBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN4009 GALACIA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN3700 PAPPYS WAYBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN33 PASCAL LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN1207 OLANDER STBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-18AUSTIN3012 HONEY TREE LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-17AUSTIN3003 SILVERLEAF DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-17AUSTIN1909 REAL CATORCEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-17AUSTIN8404 VAQUERO CVExpansion of 3.0KW Solar PV system.Michael Novakfinaled
55solar2026-08-17AUSTIN8411 GALEANA TRACE CVBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-17AUSTIN6011 OAKCLAIRE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-17AUSTIN4509 JINX AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-17AUSTIN4403 BALCONES DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-17AUSTIN3310 BONNIE RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-17AUSTIN603 FAIRFIELD LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-17AUSTIN10304 JAMES RYAN WAYBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-13AUSTIN8400 BURKWOOD CVBASE: Installing a backup battery system and additional meter socket. ETJMartin Rodriguezactive
55solar2026-08-13AUSTIN607 OAKLAND AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-13AUSTIN8711 DAWNRIDGE CIRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-13AUSTIN11801 THREE OAKS TRLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-13AUSTIN2604 TWIN OAKS DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-13AUSTIN8714 BLUEGRASS DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-13AUSTIN11401 JANUARY DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-13AUSTIN7100 WINDRIFT WAYGriffin - 40-01171 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 150 amp Main Breaker. Upgrading revenue meter to 200 Amps. Underground service requesting wire pull.Mark Bedellfinaled
55solar2026-08-13AUSTIN9209 GRANT FOREST DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-13AUSTIN8909 WESTMINSTER GLEN AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-13AUSTIN2004 ABBEY CIRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-13AUSTIN6802 PIONEER PLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-13AUSTIN2708 RAE DELL AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-13AUSTIN8014 CARDIN DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
55solar2026-08-13AUSTIN2201 STAMFORD LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
100 rows shown