PPermitDrop

Permits

2,176 permits • page 19 of 22

Export CSV
ScoreTradeDateCityAddressDescriptionValueContractorStatus
40solar2024-06-14AUSTIN5409 SUGAR MAPLE CTaddition of 16 solar paneles to an existing solar systemAdam Palaciosfinaled
40solar2024-06-13AUSTIN11706 PRAIRIE HEN LNinstallation of solar This has been done by combining both systems and performing POI as a backfeed breaker.Daniel R. Hargrovefinaled
40solar2024-06-12AUSTIN2021 ANTONE ST6.885 kW rooftop solarMark Pridefinaled
40solar2024-06-12AUSTIN10600 MC FARLIE CVInstall new roof-mounted solar and energy storage system to existing residence. PECWesley Davisfinaled
40solar2024-06-12AUSTIN11506 MARCH DRDeinstall/reinstall of existing solar system. AE. No changes being made.Wesley Davisactive
40solar2024-06-11AUSTIN3909 AVENUE GInstall 10.92 kW DC solar systemMark Pridefinaled
40solar2024-06-11AUSTIN1405 E 34TH ST BLDG AInstall a 10.08 kW DC solar system with 20.0 kWh storageMark Pridefinaled
40solar2024-06-11AUSTIN11012 JOCKEY BLUFF DRReplace existing inverter with 22 microinvertersMark Pridefinaled
40solar2024-06-10AUSTIN7110 SUMMER TANAGER DRDisconnect/reconnect power to tie in PV/ESS components. We are not upgrading the size of the service not upgrading the meter size. Bluebonnet serviceAdrian Buckfinaled
40solar2024-06-10AUSTIN9500 FM 969 RDSolar Panel InstallationAnthony Duplantisfinaled
40solar2024-06-03AUSTIN5725 LEVENWOOD LNInstall a 5.46kW DC solar system at residence. The power generated by the PV system will be interconnected with the utility grid through a breaker onAlejandro Mompazfinaled
40solar2024-05-31AUSTIN11001 STRASBURG LNBATTERY ONLY INSTALLATION & UPGRADE MAIN SERVICE PANEL TO 200A RATED BUS WITH 200A MAIN BREAKERDaniel Presswoodfinaled
40solar2024-05-30AUSTIN5811 PALO BLANCO LNinstall solar system to existing rooftopRonald Norrisfinaled
40solar2024-05-30AUSTIN3600 JETSON WAYPrewire for solar only 2021-132311 BPMark Pridefinaled
40solar2024-05-30AUSTIN3613 JETSON WAYPrewire for solar only 2021-132312 BPMark Pridefinaled
40solar2024-05-30AUSTIN3619 JETSON WAYPrewire for solar only 2021-132313 BPMark Pridefinaled
40solar2024-05-30AUSTIN3709 JETSON WAYPrewire for solar only 2021-132314 BPMark Pridefinaled
40solar2024-05-29AUSTIN4618 LAKE VWExpress: Ground Mounted solar panels$1Jeff Bendallfinaled
40solar2024-05-29AUSTIN2210 LYNNBROOK DRInstall new 61.2 KW DC solar parking canopies to new commercialCharles Kirkfinaled
40solar2024-05-29AUSTIN1117 BYERS LNMOLINAR - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. Upgrading revenue meter to 200 AmpsMark Bedellfinaled
40solar2024-05-29AUSTIN4618 LAKE VWExpress: Ground Mounted solar panelsMark Pridefinaled
40solar2024-05-28AUSTIN2713 COTTONWOOD SHORES DRDeinstall/reinstall of existing solar system. AE. No changes being made.Wesley Davisfinaled
40solar2024-05-28AUSTIN4711 LOOKOUT MOUNTAIN CVRequest to Disconnect Contractor temporarily disconnect required to tie in PV/ESS components. We are not upgrading the size of the service not upgradiAdrian Buckfinaled
40solar2024-05-28AUSTIN715 E 32ND STRelocate existing 120/240 V 1ph service to new service rack due to a new solar panel instalationRafael Bencomofinaled
40solar2024-05-28AUSTIN7101 WINDTHORST CVdisconnect/reconnect required to tie in PV/ESS components and install Tesla backup switch (Socket Mounted Switch) that is rated up to 200amp. We are nAdrian Buckfinaled
40solar2024-05-28AUSTIN4720 ROCKCLIFF RD BLDG 3New solar installation of 12.150kW for 30 panels. Grid tied roof mounted solar array with rapid shutdown inverter.William B. Crist Jr.finaled
40solar2024-05-27AUSTIN1901 N LAMAR BLVDinstalling Solar Panels and GeneratorsTommy Alderetefinaled
40solar2024-05-23AUSTIN5409 HONEY DEW TERDixon - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. Upgrading revenue meter to 200 AmpsMark Bedellfinaled
40solar2024-05-22AUSTIN7409 SCENIC BROOK DRKleespies upgrade - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. Upgrading revenue meter to 200 AmpsMark Bedellfinaled
40solar2024-05-21AUSTIN12904 HUNTERS CHASE DRSchedule controlled outage with AE and reconfigure service for energy storage system.Eric Hoffmanfinaled
40solar2024-05-20AUSTIN12626 PONY LNInstall 9.24 kW DC Solar systemMark Pridefinaled
40solar2024-05-20AUSTIN8207 BRIARWOOD LNDetlefsen upgrade - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. Upgrading revenue meter to 200 AmpsMark Bedellfinaled
40solar2024-05-20AUSTIN1708 NEWTON ST UNIT AInstall 23kW DC Energy Storage SystemMark Pridefinaled
40solar2024-05-20AUSTIN13104 STATON DRUpgrading solar system to include new inverters and newer model solar panels.Robert Rotenberryfinaled
40solar2024-05-20AUSTIN2129 EMMA LONG STDeinstall/reinstall of existing solar system. AE. No changes being made.Wesley Davisfinaled
40solar2024-05-20AUSTIN1908 EMMA LONG STInstall 8.82 kW DC solar systemMark Pridefinaled
40solar2024-05-17AUSTIN12631 ORO VALLEY TRLWebber - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. Upgrading revenue meter to 200 AmpsMark Bedellfinaled
40solar2024-05-17AUSTIN1900 MISTYWOOD DRZurovec - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. Upgrading revenue meter to 200 AmpsMark Bedellfinaled
40solar2024-05-17AUSTIN5404 RUSK CTRequest to Disconnect contractor temporarily disconnect required to tie in PV/ESS components and install Socket Mounted Switch that is rated up to 200Adrian Buckfinaled
40solar2024-05-16AUSTIN4004 PINCKNEY ST8.91 kW rooftop solarMark Pridefinaled
40solar2024-05-16AUSTIN4321 CAMACHO ST8.1 kW rooftop solarMark Pridefinaled
40solar2024-05-16AUSTIN4217 THREADGILL ST6.48 kW rooftop solarMark Pridefinaled
40solar2024-05-16AUSTIN2037 ANTONE ST14.58kW rooftop solarMark Pridefinaled
40solar2024-05-16AUSTIN4008 CAMACHO ST6.48 kW rooftop solarMark Pridefinaled
40solar2024-05-16AUSTIN10020 DAWN PEARL DRInstallation of 6.48KW Solar PV and 13.5KWH Energy Storage System to Residence.Eric Hoffmanfinaled
40solar2024-05-16AUSTIN1912 TOM MILLER ST8.91 kW Rooftop Solar InstallationMark Pridefinaled
40solar2024-05-16AUSTIN3912 CANEY CREEK RDAdd 40KWH Energy Storage System to existing Solar PV System.Eric Hoffmanfinaled
40solar2024-05-16AUSTIN4141 THREADGILL ST10.53 kW rooftop solarMark Pridefinaled
40solar2024-05-13AUSTIN8705 LASSIE GIRL LNSolar Panel InstallationAnthony Duplantisfinaled
40solar2024-05-13AUSTIN7326 POTTERS TRLInstalling 7.565 kW solar panel systemLogan Stonefinaled
40solar2024-05-13AUSTIN6009 IDLEWOOD CVInstallation of Solar PV SystemMichael Novakfinaled
40solar2024-05-09AUSTIN4341 S CONGRESS AVEAux Permit for SolarCharles Kirkfinaled
40solar2024-05-08AUSTIN6901 JESTER WILD DRRequest to Disconnect Contractor temporarily disconnect required to tie in PV/ESS components. We are not upgrading the size of the service not upgraAdrian Buckfinaled
40solar2024-05-07AUSTIN3904 SIERRA DRPrewire for future Solar installationEric Kayfinaled
40solar2024-05-07AUSTIN6705 ROTAN DRDeinstall/reinstall of existing solar system. AE. No changes being made.Wesley Davisfinaled
40solar2024-05-06AUSTIN12813 QUIRIN DRInstalling 4.05kw solar panel system mounted on roof.Logan Stonefinaled
40solar2024-05-06AUSTIN6005 BROKEN SPOKE TRLFaulk - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. Upgrading revenue meter to 200 Amps.Mark Bedellfinaled
40solar2024-05-06AUSTIN8002 TALFERD TRLDisconnect/reconnect power to tie in PV/ESS components. Install new 6.30kW rooftop solar system and 13.5kW energy storage system for existing resideAdrian Buckfinaled
35solar2026-05-27AUSTIN2009 AIRPORT BLVDInstalling 73.70 kW DC (60.00 kW AC) solar system with 134 ALEXUS ALEX-550-W-144-S panels and 1 SCA60KTL-DO/US-480 inverter.Ortiz Mosesactive
35solar2026-05-22AUSTIN1141 CHICON ST BLDG 1 UNIT HP3SMART HOUSING Rooftop Solar. No battery or energy storage. Line side tap interconnection. Aux EP Needed. Remodel EP not needed.Jeff Bendallactive
35solar2026-05-08AUSTIN3601 BLUESTEIN DRInstall new 17.00 KW rooftop solar systemAdrian Buckactive
35solar2026-05-07AUSTIN1705 E 17TH STRequest to Disconnect the 125A main breaker to install a new 200-amp transfer switch for energy storage installation. Service upgrade to 200aDavid Wrightfinaled
35solar2026-05-04AUSTIN3601 BLUESTEIN DRInstall new 17.00 KW rooftop solar systemChadwyck Preeceactive
35solar2026-05-04AUSTIN3601 BLUESTEIN DRInstall new 17.00 KW rooftop solar system This is a 400 amp transocket service. This address has a (Solar) Aux permit 26-049782.Chadwyck Preeceactive
35solar2026-05-01AUSTIN2121 S IH 35 SVRD NB UNIT 2NEW PHOTOVOLTIAC (PV) SYSTEM: 85.85kW (DC)/67.30kW (AC)Adrian Buckfinaled
35solar2026-04-28AUSTIN1010 SAHARA AVESandoval 39-58921 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _200_ Main Breaker Upgrading revenue meter toMark Bedellactive
35solar2026-04-28AUSTIN1141 CHICON ST BLDG 1Rooftop Solar. No battery or energy storage. Two line side tap interconnection. Two Aux EP and Remodel EPs needed.Jeff Bendallactive
35solar2026-04-28AUSTIN1010 SAHARA AVESandoval 39-58921 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _200_ Main Breaker Upgrading revenue meter to 200 Amps Upgrading sub-panel only. REQUESTING UNDERGROUND WIRE PULL.Mark Bedellfinaled
35solar2026-04-23AUSTIN3601 BLUESTEIN DRInstall new 17.00 KW rooftop solar systemChadwyck Preeceactive
35solar2026-04-22AUSTIN900 SPRINGDALE RDInstall a pergola with solar panels attached to the top This project is being installed for the following AE Account + UNIT # (even though the addreJeffrey Shedactive
35solar2026-04-22AUSTIN900 SPRINGDALE RDInstall a pergola with solar panels attached to the top This project is being installed for the following AE Account + UNIT # (even though the address is correctly entered in the permitting system): 900 SPRINGDALE RD UNIT FOODT AUSTIN TX 78702 -- per Megan Brannen with Austin Energy 5/11/2026.Jeffrey Shedfinaled
35solar2026-04-16AUSTIN3301 DOLPHIN CV UNIT 1Prewire for SolarMark Pridefinaled
35solar2026-04-08AUSTIN16601 E BRAKER LN BLDG 1Electrical temporary disconnect required for solar energy system install. No changes to structure proposed.David Wrightactive
35solar2026-04-03AUSTIN7905 BURLESON RD BLDG TNFM2127.33kW rooftop ballasted solar interconnected at TNFM2 via lineside tapMark Prideactive
35solar2026-04-03AUSTIN3800 JACKSON AVE BLDG TNFMInstall new 444.69kW rooftop solar system to existing commercial only.Jason A Thomasactive
35solar2026-04-02AUSTIN16601 E BRAKER LN BLDG 1Electrical temporary disconnect required for solar energy system install. No changes to structure proposed. EP Added and AUX removed as this is BlueBDavid Wrightactive
35solar2026-04-02AUSTIN16601 E BRAKER LN BLDG 1Electrical temporary disconnect required for solar energy system install. No changes to structure proposed. EP Added and AUX removed as this is BlueBonnet electrical serviceDavid Wrightactive
35solar2026-03-26AUSTIN4500 S US 183 HWY SBInstallation of a 13.87KW rooftop mounted PV solar systemJEREMIE BRANTONfinaled
35solar2026-03-26AUSTIN8227 N LAMAR BLVD BLDG CInstalling 34.65 kW Solar System with 63 ALEX-550-W panels 1 SCA50KTL-DO and 4 GOrtiz Mosesactive
35solar2026-03-26AUSTIN8227 N LAMAR BLVD BLDG BInstalling 61.60 kW Solar System with 112 ALEX-550-W panels 9 GOODWE GW9600AJames Hiebertactive
35solar2026-03-25AUSTIN3823 AIRPORT BLVDRooftop Solar Ballasted with Line Side Tap (Unit B)Mark Pridefinaled
35solar2026-03-23AUSTIN8227 N LAMAR BLVD BLDG CInstalling 34.65 kW Solar System with 63 ALEX-550-W panels 1 SCA50KTL-DO and 4 GJames Hiebertactive
35solar2026-02-25AUSTIN900 SPRINGDALE RDInstall a pergola with solar panels attached to the topJeffrey Shedactive
35solar2026-02-25AUSTIN900 SPRINGDALE RDInstall a pergola with solar panels attached to the top This project is being installed for the following AE Account + UNIT # (even though the addrJeffrey Shedactive
35solar2026-02-25AUSTIN900 SPRINGDALE RDInstall a pergola with solar panels attached to the top. Repair work such as addition of receptacles or removal of gutter will also be covered and inJeffrey Shedactive
35solar2026-02-25AUSTIN900 SPRINGDALE RDInstall a pergola with solar panels attached to the top. Repair work such as addition of receptacles or removal of gutter will also be covered and inspected under this permit. This project is being installed for the following AE Account + UNIT # (even though the address is correctly entered in the permitting system): 900 SPRINGDALE RD UNIT FOODT AUSTIN TX 78702 -- per Megan Brannen with Austin Energy 5/19/2026Jeffrey Shedfinaled
35solar2026-02-18AUSTIN9315 MC NEIL RDopen parking garage with photovoltaic system mounted on top and electric bus charging under the structure. This permit includes interconnection to TNAlexander Petrovichfinaled
35solar2026-02-18AUSTIN9315 MC NEIL RDopen parking garage with photovoltaic system mounted on top and electric bus charging under the structure. This permit includes interconnection to TNFM 1 TNFM 2 TNFM 3 and Unit H PuPR2Alexander Petrovichfinaled
35solar2026-02-10AUSTIN12318 N MOPAC EXPY SVRD SB UNIT DInstallation of 121.25 KW Rooftop PV System for Existing Mini Warehouse for Bldg. DAdrian Buckactive
35solar2026-02-06AUSTIN6805 CANNONLEAGUE DRGallardo - 39-34568 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amps Main Breaker. Upgrading revenue meterMark Bedellfinaled
35solar2026-02-06AUSTIN6805 CANNONLEAGUE DRGallardo - 39-34568 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amps Main Breaker. Upgrading revenue meter to 200 Amps. New MSP and new meter only.Mark Bedellfinaled
35solar2026-02-05AUSTIN12318 N MOPAC EXPY SVRD SB UNIT DInstallation of 121.25 KW Rooftop PV System for Existing Mini Warehouse for Bldg. DChadwyck Preeceactive
35solar2026-01-29AUSTIN9315 MC NEIL RDopen parking garage with photovoltaic system mounted on top and electric bus charging under the structure. PuPR2Alexander Petrovichfinaled
35solar2026-01-27AUSTIN4300 BULL CREEK RDInstall a 161.040 KW ballasted flat roof mounted Solar PV Power SystemAdrian Buckfinaled
35solar2026-01-26AUSTIN1714 E PARMER LN BLDG AInstalling 132 kW Solar System with 240 ALEXUS ALEX-550-W-144-S solar panels 2 SCA50KTL-DO/US-480 and 1 SCA36KTL-DO/US-480 inverters.Stephan Engelactive
35solar2026-01-23AUSTIN1714 E PARMER LN BLDG AInstalling 132 kW Solar System with 240 ALEXUS ALEX-550-W-144-S solar panels 2 SCA50KTL-DO/US-480 and 1 SCA36KTL-DO/US-480 inverters.Stephan Engelactive
35solar2026-01-20AUSTIN7520 1/2 S PLEASANT VALLEY RD UNIT AVerizon will install Antenna Array at 100 on existing 120 monopole telecommunications tower 2 outdoor equipment cabinets on new 4x14 concrete pad and 1 Kohler 30REOZK diesel 203 gallon generator on new 4x8 concrete pad. Battery type: 2 Strings of SAFT TELX+ 180 NiCad batteries. *UNIT AKevin D Mauldinfinaled
35solar2026-01-16AUSTIN12318 N MOPAC EXPY SVRD SB UNIT DInstallation of 121.25 KW Rooftop PV System for Existing Mini Warehouse for Bldg. DChadwyck Preeceactive
35solar2026-01-16AUSTIN1714 E PARMER LN BLDG AInstalling 132 kW Solar System with 240 ALEXUS ALEX-550-W-144-S solar panels 2 SCA50KTL-DO/US-480 and 1 SCA36KTL-DO/US-480 inverters.James Hiebertactive
35solar2026-01-02AUSTIN8309 SPIRE VWrooftop solar interconnecting with backfeed breakerBrijido Rodriguezfinaled
100 rows shown