PPermitDrop

Permits

3,028 permits • page 17 of 31

Export CSV
ScoreTradeDateCityAddressDescriptionValueContractorStatus
40solar2026-08-17AUSTIN3310 BONNIE RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-17AUSTIN603 FAIRFIELD LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-17AUSTIN10304 JAMES RYAN WAYBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-14AUSTIN8011 ROCKWOOD LNRemove and reinstall roof mounted PV solar system. AE.Wesley Davisactive
40solar2026-08-14AUSTIN7300 SAGE OAK TRLRequest to disconnect and reconnect. TruTec will be moving PV meter over 1 ft to the rightDaniel Perezactive
40solar2026-08-14AUSTIN9920 BECOMING STInstall new roof-mounted solar system and energy storage syste to existing residence. BluebonnetWesley Davisfinaled
40solar2026-08-13AUSTIN8400 BURKWOOD CVBASE: Installing a backup battery system and additional meter socket. ETJMartin Rodriguezactive
40solar2026-08-13AUSTIN3409 AZALEA BLOSSOM DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-08-13AUSTIN607 OAKLAND AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN8711 DAWNRIDGE CIRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-08-13AUSTIN2417 TUCKER LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-08-13AUSTIN8216 SIRINGO PASSBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-08-13AUSTIN11801 THREE OAKS TRLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN2604 TWIN OAKS DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN8714 BLUEGRASS DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN11401 JANUARY DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-08-13AUSTIN4907 TOMAHAWK TRLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN601 W ST JOHNS AVEOnly for inspection of connection of PV system conductors to existing electrical service all other PV work inspected by AE-hyatt Installation of a 372.35 kW roof mounted solar PV system. Install includes modules inverters racking.Nicolas Espinozaactive
40solar2026-08-13AUSTIN10100 JUPITER HILLS DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN4610 PLUM PEACH BNDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN7100 WINDRIFT WAYGriffin - 40-01171 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 150 amp Main Breaker. Upgrading revenue meter to 200 Amps. Underground service requesting wire pull.Mark Bedellfinaled
40solar2026-08-13AUSTIN9209 GRANT FOREST DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN615 W GIBSON STBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-08-13AUSTIN4912 BOB CAT RUNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN1705 CLIFFSIDE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN8909 WESTMINSTER GLEN AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN8704 UNITED KINGDOM DR5.7kw solar systemCory Shopefinaled
40solar2026-08-13AUSTIN4515 SLICKROCK CVBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-08-13AUSTIN2106 SCHULLE AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN2004 ABBEY CIRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN2204 COLGATE LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN6802 PIONEER PLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN2708 RAE DELL AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN8014 CARDIN DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN2201 STAMFORD LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN8027 CHALK KNOLL DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN5901 HIGHLAND HILLS TERBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN6911 DEBORAH DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-08-13AUSTIN9901 SALVIA CVAux permit for the energy storage. Disconnect permit on 2026-075874 EP Disconnect/reconnect to tie in ESS components. We are not upgrading the size of the service not upgrading the meter size.Chadwyck Preecefinaled
40solar2026-08-13AUSTIN1917 W 39TH STBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-13AUSTIN12712 BELCARA PLBASE: Installing a backup battery system and additional meter socket. - ETJMartin Rodriguezfinaled
40solar2026-08-13AUSTIN9436 HOPELAND DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-08-12AUSTIN10107 HIDDEN MEADOW DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-12AUSTIN408 RACETRACK DRWarren - 40-02307 - Disconnect/reconnect power to tie in PV component to MSP to 225 Amps bus / 150 amps Main Breaker. Upgrading revenue meter to 200 Amps. Underground service requesting wire pull only.Mark Bedellfinaled
40solar2026-08-11AUSTIN11345 COMANO DRTEMPORAY DISCONNECT/RECONNECT FOR A 10C ENPHASE BATTERYLogan Stonefinaled
40solar2026-08-10AUSTIN5802 SHOALWOOD AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-10AUSTIN2400 ELMGLEN DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-10AUSTIN1907 TRAVIS HEIGHTS BLVDBackup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job completion.Martin Rodriguezfinaled
40solar2026-08-10AUSTIN1704 NICKERSON STBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-07AUSTIN1610 ASTOR PLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-07AUSTIN5905 MARILYN DRBASE: Installing a backup battery system and additional meter socketMartin Rodriguezfinaled
40solar2026-08-07AUSTIN10802 REDMOND RDSalamanca - 39-99537 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Requesting wire pull.Mark Bedellfinaled
40solar2026-08-07AUSTIN7218 WEST RIM DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-07AUSTIN4600 WEST RIM CVBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-07AUSTIN1800 REAL CATORCEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-07AUSTIN8013 COBBLESTONEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-07AUSTIN2509 ELLISE AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-07AUSTIN3102 BERRYLAWN CIRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-07AUSTIN1606 NILES RDNew pool (with plumbing permit). New Battery Backup 336 SF New generator enclosure 259 SF.Steven Barnettactive
40solar2026-08-07AUSTIN7304 FRED MORSE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-08-07AUSTIN2108 TEAKWOOD DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-07AUSTIN8100 PARKDALE DRDisconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps bus rating /125 amps Main Breaker rating. Upgrading revenue meter to 200 Amps.Mark Bedellfinaled
40solar2026-08-06AUSTIN1200 HAWKS CANYON CIRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-06AUSTIN12313 LITTLE EMILY WAYBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-08-06AUSTIN11803 INDIANHEAD DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-05AUSTIN4907 TENISON CTDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Chadwyck Preeceactive
40solar2026-08-05AUSTIN8706 BROOKFIELD DRInstallation of 6.16kw Solar PV systemMichael Novakfinaled
40solar2026-08-04AUSTIN2400 SPANISH CAMP CVRelocation of Load-Side Tap to Line-Side Tap for existing solar generation system. No other system changes.Secoya Rittenberryfinaled
40solar2026-08-04AUSTIN11604 MURANO DRSOLAR PANEL SYSTEM WITH A SYSTEM SIZE OF 6.56 Q.PEAK DUO BLK ML-G10.C+ 410W (x16) AND Enphase microinverters (x16)Logan Stonefinaled
40solar2026-08-04AUSTIN1606 NILES RDNew pool (with plumbing permit). New Battery Backup 336 SF New generator enclosure 259 SF.$1Hugo Reynoldsactive
40solar2026-08-03AUSTIN1341 W MARY ST BLDG 1Installing 130.35 kW Solar System with 237ALEX-550-W panels and 2 CPS SCA60KTL-DO/US-480.James Hiebertactive
40solar2026-08-03AUSTIN11717 RAILTON DRMichel - 39-81052 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps. Requesting wire pull.Mark Bedellfinaled
40solar2026-08-03AUSTIN5916 CAPE CORAL DRInstallation of 24.92 kW roof mounted solar system and (2) Tesla Powerwall 3 BatteriesJoungho Choiactive
40solar2026-08-03AUSTIN1204 WARRINGTON DRGritsch 39-91993 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 Main Breaker. Upgrading revenue meter to 200 Amps. Upgrading subpanel to 200 amps. Underground service requesting wire pull.Mark Bedellfinaled
40solar2026-07-30AUSTIN2303 SUNNY SLOPE DR7.36kW rooftop solar installMark Pridefinaled
40solar2026-07-30AUSTIN7300 SAGE OAK TRLRequest to disconnect and reconnect. TruTec will be moving PV meter over 1 ft to the rightDaniel Perezactive
40solar2026-07-29AUSTIN6607 MESA HOLLOW DRRemoval/reinstallation of existing solar system. AE. No changes being made.Wesley Davisactive
40solar2026-07-29AUSTIN4712 STAR JASMINE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN6507 MESA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN11604 MURANO DRTEMPORARY DISCONNECT/RECONNECTION REQUEST FOR ENPHASE BATTERYLogan Stonefinaled
40solar2026-07-29AUSTIN2643 BARTON HILLS DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN1712 BAY HILL DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN5303 BUFFALO PASSBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN7511 SHADYWOOD DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN8211 SPRING VALLEY DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN3608 ATLAS CVBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN2411 QUARRY RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN2007 RICHCREEK RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-28AUSTIN6602 LUCKENBACH LNDisconnect/reconnect to tie in pv/ESS components. No upgrade to service or meter size. GENERAC 22 KW AIR-COOLED STANDBY GENERATOR (MODEL #G007260-0)Chadwyck Preeceactive
40solar2026-07-28AUSTIN9102 WAMPTON WAYBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-28AUSTIN7709 MESA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-28AUSTIN6220 TOSCANA AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-28AUSTIN3966 SENDERO DR4.14 kW rooftop solar installation to replace existingMark Pridefinaled
40solar2026-07-28AUSTIN1424 PRESTON AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-27AUSTIN8904 FALLKILL DRInstall new roof-mounted solar system energy storage system an EV Wall Connector to existing residence. BluebonnetWesley Davisfinaled
40solar2026-07-27AUSTIN12502 FALLEN TOWER LNContreras - 39-90125 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps. Requesting wire pull.Mark Bedellfinaled
40solar2026-07-27AUSTIN1835 KRAMER LN BLDG B UNIT 100Rooftop Solar with Line Side Tap Interconnection.Mark Pridefinaled
40solar2026-07-24AUSTIN2203 1/2 W 35TH STAT&T Proposes: Tower SOW - Remove (3) B2 & B66 RRU Radios (3) TMAS (3) Diplexers (10) 50A Coax Cables. Relocate: (3) Air Antennas (3) B30 RRU Radios. Install: Mount modification per mount analysis. (3) Air antennas (3) B25/B66 RRU Radios. Ground SOW: Remove (6) Diplexers (4) -48-24V Converters (1) 48V Battery Rack (12) 48V 194aH Batteries (6) 50A DC breakers. Existing cell tower.Antonio Morenoactive
40solar2026-07-24AUSTIN7100 MESA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-07-24AUSTIN304 W CADDO ST39-90606 - Childs - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps.Mark Bedellactive
100 rows shown