Permits
2,212 permits • page 17 of 23
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 40 | roofing | 2024-07-11 | AUSTIN | 4401 PARKWOOD RD | Disconnect/Reconnect to install new riser through roof to meet current Austin Energy height requirements. Current riser is too low. | Alexander Petrovich | finaled | |
| 40 | roofing | 2024-07-11 | AUSTIN | 3206 CHERRY LN | Addition of 521 sq ft to the existing structure. The existing roof structure will be removed and replaced with a new design. Replacing all existing w | Christopher Charles | finaled | |
| 40 | roofing | 2024-07-11 | AUSTIN | 4800 VINSON DR UNIT 1 | Install 20 (390W) roof mounted solar panels 7.800 kW solar service system tying into existing 225 AMP rated MSP | Gregory Albright | finaled | |
| 40 | roofing | 2024-07-11 | AUSTIN | 11705 LONG RIFLE CV | Install 9 (390W) roof mounted solar 3.510 kW solar service system tying into existing 200 AMP rated MSP | Gregory Albright | finaled | |
| 40 | roofing | 2024-07-09 | AUSTIN | 12212 BRIGADOON LN BLDG W | Express re-roof replace associated flashings replace siding detach & reset gutters Units 102-104 | $1 | Art Lopez | finaled |
| 40 | roofing | 2024-07-09 | AUSTIN | 12212 BRIGADOON LN BLDG U | Express re-roof replace associated flashings replace siding detach & reset gutters | $1 | Art Lopez | finaled |
| 40 | roofing | 2024-07-09 | AUSTIN | 13929 CENTER LAKE DR BLDG 4.1 | Add new 4 Mini-Splits associated electrical work to wire mini-splits and roof work for Building 4.1 & Building 4.2 | John Funderburk | finaled | |
| 40 | roofing | 2024-07-09 | AUSTIN | 12212 BRIGADOON LN BLDG V | Express re-roof replace associated flashings replace siding detach & reset gutters Units 105-107 | $1 | Art Lopez | finaled |
| 40 | roofing | 2024-07-08 | AUSTIN | 4520 CREEK BEND DR | Install solar panels on the roof | Jose Cruz Rosa | finaled | |
| 40 | roofing | 2024-07-08 | AUSTIN | 8109 BIG VIEW DR | Addition of recovery room sauna and covered patio tie in roof to existing roof lines | Robert Lee | finaled | |
| 40 | roofing | 2024-07-07 | AUSTIN | 12212 BRIGADOON LN BLDG T | Express re-roof replace associated flashings replace siding detach & reset gutters Units 110-111 | $1 | Art Lopez | finaled |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN BLDG 3 | re-roof | Brad Davis | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN BLDG 16 | Re-roof existing building. No Structural changes. | Brad Davis | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN | Reroof existing building. No structural changes. (Office) | Brad Davis | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN BLDG 6 | Reroof existing building. No structural changes. | Brad Davis | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN BLDG 13 | Re-roof | Brad Davis | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN BLDG 18 | Re-roof existing building. No Structural changes. | Brad Davis | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN BLDG 15 | Re-roof | Brad Davis | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN BLDG 20 | Reroof to an existing building. No structural changes. | Brad Davis | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN BLDG 5 | Reroof existing building. No structural changes. | Brad Davis | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 4700 SETON CENTER PKWY | Re-roof overlay | Harold Peterson | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN BLDG 7 | Re-roof existing building. No structural changes. | Brad Davis | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN BLDG 19 | Re-roof existing building. No Structural changes. | Brad Davis | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN BLDG 14 | Re-roof | Brad Davis | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN BLDG 10 | Re-roof | Brad Davis | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN BLDG 17 | Re-roof existing building. No Structural changes. | Brad Davis | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN BLDG 12 | Re-roof | Brad Davis | finaled | |
| 40 | roofing | 2024-07-03 | AUSTIN | 811 W SLAUGHTER LN BLDG 2 | Re-roof existing building. No structural changes. | Brad Davis | finaled | |
| 40 | roofing | 2024-07-02 | AUSTIN | 4423 JESTER DR | Homeowner will be installing (27) Roof mounted United Renewable Energy panels and (2) Tesla Powerwall 3s | William Agundes | finaled | |
| 40 | roofing | 2024-07-01 | AUSTIN | 11500 N MOPAC EXPY SVRD SB BLDG C | Exterior Refresh/Re-Roof See A2.20 for full scope of work | Vincent Real | finaled | |
| 40 | roofing | 2024-07-01 | AUSTIN | 3701 W SLAUGHTER LN | Re-roof of existing building (church only). | Jose Hernandez | finaled | |
| 40 | roofing | 2024-06-27 | AUSTIN | 11611 SHERWOOD FOREST | Install 20 (390W) roof mounted solar panels 7.800kW solar service system tying into existing 150 AMP rated MSP | Gregory Albright | finaled | |
| 40 | roofing | 2024-06-27 | AUSTIN | 11500 N MOPAC EXPY SVRD SB BLDG C | Exterior Refresh/Re-Roof See A2.20 for full scope of work | Tu Huynh | finaled | |
| 40 | roofing | 2024-06-27 | AUSTIN | 1006 CHERICO ST | interior remodel roof line will be extended for covered patio 220 sf | $1 | Tim Clifton | finaled |
| 40 | roofing | 2024-06-27 | AUSTIN | 3700 NORTH HILLS DR | Remove and replace selected areas of existing roof of Murchison Middle School AISD Project | John Robinson | finaled | |
| 40 | roofing | 2024-06-26 | AUSTIN | 4613 FRANKLIN PARK DR | Installing roof top solar system - Jose Avila | Mark Barylski | finaled | |
| 40 | roofing | 2024-06-26 | AUSTIN | 4811 PROCK LN | Guadalupe Jaramillo - Roof top solar install | Mark Barylski | finaled | |
| 40 | roofing | 2024-06-24 | AUSTIN | 2212 NATHAN DR | Install 24 (390W) roof mounted solar panels 9.360 kW solar service system tying into a new 200 AMP rated MSP | Gregory Albright | finaled | |
| 40 | roofing | 2024-06-21 | AUSTIN | 10000 N LAMAR BLVD | Remove existing roofing system and install IKO Cambridge 30 (SQ) (Weatherwood) shingles. | Jason Armstrong | finaled | |
| 40 | roofing | 2024-06-20 | AUSTIN | 6855 E US 290 HWY SVRD EB | Partial re-roof | Russell Pachinger | finaled | |
| 40 | roofing | 2024-06-18 | AUSTIN | 1400 GARDEN ST | remodel with new roof and windows. expand and redo back deck with built-in seating. expired Bps to be rolled in the current scope. 2019-024523 2020- | Matthew King | finaled | |
| 40 | roofing | 2024-06-17 | AUSTIN | 2401 TRAILSIDE DR UNIT A | Installation of roof mounted solar panels | Adrian Buck | finaled | |
| 40 | roofing | 2024-06-17 | AUSTIN | 11712 TALLOW FIELD WAY | Installation of roof mount solar panels | Marco Chavez | finaled | |
| 40 | roofing | 2024-06-14 | AUSTIN | 1807 VANCE CIR | New installation of solar on existing residence roof | David Wright | finaled | |
| 40 | roofing | 2024-06-14 | AUSTIN | 5721 LAS ALAS TRL | install of 25 roof mounted solar paneles 9.875 kW-DC / 9.15 kW-AC | Adam Palacios | finaled | |
| 40 | roofing | 2024-06-14 | AUSTIN | 1207 ARTHUR STILES RD | replaced meter loop and riser through roof. repair were part for part | Justin Wagner | finaled | |
| 40 | roofing | 2024-06-13 | AUSTIN | 609 THRASHER GLADE DR | Install 35 (390W) roof mounted solar panels 13.650 kW solar service system tying into existing 200 AMP rated MSP | Gregory Albright | finaled | |
| 40 | roofing | 2024-06-13 | AUSTIN | 8220 CROSS PARK DR | Will be removing existing roof system and install a new TPO/single ply system. | Jason Milliken | finaled | |
| 40 | roofing | 2024-06-12 | AUSTIN | 10105 DEER CHASE TRL | Install 12 (410W) roof mounted solar panels 4.920 kW solar service system tying into existing 125 AMP rated MSP | Gregory Albright | finaled | |
| 40 | roofing | 2024-06-11 | AUSTIN | 1400 GARDEN ST | remodel with new roof and windows. expand and redo back deck with built-in seating. expired Bps to be rolled in the current scope. 2019-024523 2020- | Julio C Anzaldua | finaled | |
| 40 | roofing | 2024-06-11 | AUSTIN | 13221 COUNTRY TRAILS LN | Install 43 (410W) roof mounted solar panels 17.630 kW solar service system tying into a new 200 AMP rated MSP | Gregory Albright | finaled | |
| 40 | roofing | 2024-06-11 | AUSTIN | 6612 ROUTENBURN ST | Installation of roof mounted solar panels and solar batteries | Patrick Hicks | finaled | |
| 40 | roofing | 2024-06-11 | AUSTIN | 4413 BUCKS RUN BLDG B | Installation of roof mounted solar panels | Peter Marky | finaled | |
| 40 | roofing | 2024-06-10 | AUSTIN | 8040 MESA DR | Roof overlay. No structural changes | Jarrell Perrin | finaled | |
| 40 | roofing | 2024-06-10 | AUSTIN | 11406 RUSTIC ROCK DR | INSTALLATION OF PV MODULES ON EXISTING COMMERCIAL ROOF. THIS IS THE PEC SERVICE AREA | David Wright | finaled | |
| 40 | roofing | 2024-06-07 | AUSTIN | 9607 RESEARCH BLVD SVRD NB BLDG A UNIT 300 | Tenant Improvement of existing retail store adding a new direct outside air (DOAS) unit on roof. Address changed from 9607 RESEARCH BLVD SVRD NB | Bobby Hines | finaled | |
| 40 | roofing | 2024-06-07 | AUSTIN | 3206 CHERRY LN | Addition of 521 sq ft to the existing structure. The existing roof structure will be removed and replaced with a new design. Replacing all existing w | Armando Rymers JR | finaled | |
| 40 | roofing | 2024-06-06 | AUSTIN | 3711 COUNSELOR DR | Riser Repair: Replace existing rag riser and damaged point of attachment with Rigid metallic riser through roof and mast attached point of attachment | Dominic Neri | finaled | |
| 40 | roofing | 2024-06-06 | AUSTIN | 1715 W CESAR CHAVEZ ST | Remove topping slab replace waterproofing below install new roof drains and new waterproofing | Bruce Marigny | finaled | |
| 40 | roofing | 2024-06-05 | AUSTIN | 2610 GUADALUPE ST | Roof Overlay | Molly Johnston | finaled | |
| 40 | roofing | 2024-06-05 | AUSTIN | 9607 RESEARCH BLVD SVRD NB BLDG A UNIT 300 | Tenant Improvement of existing retail store adding a new direct outside air (DOAS) unit on roof. Address changed from 9607 RESEARCH BLVD SVRD NB | Richard Shimel | finaled | |
| 40 | roofing | 2024-06-03 | AUSTIN | 1717 W 6TH ST | Replace two Roof Top Chillers | Charles Morris | finaled | |
| 40 | roofing | 2024-05-31 | AUSTIN | 620 W 51ST ST | Reroof with tapered poly iso insulation system to achieve 1/4 per foot slope and R-Value minimum of R-25 | Danny Harycki | finaled | |
| 40 | roofing | 2024-05-30 | AUSTIN | 2020 EMMA LONG ST | Express: Install Tin roof | $1 | James Parish | finaled |
| 40 | roofing | 2024-05-28 | AUSTIN | 218 S LAMAR BLVD SB | New construction of mixed use SHELL (NOT FOR OCCUPANCY) to include roof top terrace | Michael Cosgriff | finaled | |
| 40 | roofing | 2024-05-28 | AUSTIN | 11809 PLAINS VALLEY DR | INSTALL OF ROOF MOUNTED SOLAR PANELS. | Marco Chavez | finaled | |
| 40 | roofing | 2024-05-28 | AUSTIN | 13600 TAI LONDO DR | Installation of roof mounted solar panels | Peter Marky | finaled | |
| 40 | roofing | 2024-05-28 | AUSTIN | 2302 MC BEE ST | Addition/remodel. Convert existing screened porch on 1st floor into conditioned sunroom. Reconfigure and enclose existing roof deck into an enclosed w | Brandt E. Lowden | finaled | |
| 40 | roofing | 2024-05-28 | AUSTIN | 910 THRASHER GLADE DR | Install 24 (390W) roof mounted solar panels 9.360 kW solar service system tying into existing 200 AMP rated MSP | Gregory Albright | finaled | |
| 40 | roofing | 2024-05-28 | AUSTIN | 12221 N MOPAC EXPY SVRD NB | Removing 67500sqft of ballasted EPDM roof and replacing it with a 2-ply modified bitumen roof. Removing 18400sqft of standing seam metal roof and repl | Miguel Juarez | finaled | |
| 40 | roofing | 2024-05-28 | AUSTIN | 11100 MOTHERAL DR | New construction of 5 storage bins with roof and canopy lighting vehicular cantilever slide gate pedestrian gate site lighting and security surveillan | Joshua Evans | finaled | |
| 40 | roofing | 2024-05-23 | AUSTIN | 2302 MC BEE ST | Addition/remodel. Convert existing screened porch on 1st floor into conditioned sunroom. Reconfigure and enclose existing roof deck into an enclosed w | Brandon Kinnibrugh | finaled | |
| 40 | roofing | 2024-05-23 | AUSTIN | 4301 ISLAND AVE | Express: Remove and replace kitchen and bathroom fixtures. Remove and replace 2 doors. Minor MEP for repairs as needed. Re-roof decking and shingles. | Christopher Burris | finaled | |
| 40 | roofing | 2024-05-23 | AUSTIN | 4301 ISLAND AVE | Express: Remove and replace kitchen and bathroom fixtures. Remove and replace 2 doors. Minor MEP for repairs as needed. Re-roof decking and shingles. | Matthew Butcher | finaled | |
| 40 | roofing | 2024-05-22 | AUSTIN | 11105 KIRKLAND HILL PATH | express install metal roof | $1 | James Parish | finaled |
| 40 | roofing | 2024-05-22 | AUSTIN | 4304 NITSCHKE ST | Express: Install metal roof (not going past decking) | $1 | James Parish | finaled |
| 40 | roofing | 2024-05-22 | AUSTIN | 610 DAVIS ST BLDG 1FLR UNIT 55 | ePlan: Expedited Review - Finish-Outs for Units on Level 55 with Roof Terrace (16551 SF) | Bryce Poulin | finaled | |
| 40 | roofing | 2024-05-22 | AUSTIN | 2220 LEON ST | Replace current 30 sqs modified bitumen roofing system with .60 mil TPO roofing system. No roof or attic penetrations. | Nathan Navarro | finaled | |
| 40 | roofing | 2024-05-20 | AUSTIN | 2302 MC BEE ST | Addition/remodel. Convert existing screened porch on 1st floor into conditioned sunroom. Reconfigure and enclose existing roof deck into an enclosed w | Joe S Compton | finaled | |
| 40 | roofing | 2024-05-20 | AUSTIN | 4508 TEJAS TRL | Install new roof-mounted solar system to existing residence. AE | Wesley Davis | finaled | |
| 40 | roofing | 2024-05-20 | AUSTIN | 3206 CHERRY LN | Addition of 521 sq ft to the existing structure. The existing roof structure will be removed and replaced with a new design. Replacing all existing w | $1 | William Niels | finaled |
| 40 | roofing | 2024-05-20 | AUSTIN | 2405 WESTLAKE DR | *Greater than 50% demo* Demo existing condo walls and roof with slab and demising walls to remain. Comprehensive rebuild resulting in a 3-story 5 bed | John Power | finaled | |
| 40 | roofing | 2024-05-20 | AUSTIN | 2302 MC BEE ST | Addition/remodel. Convert existing screened porch on 1st floor into conditioned sunroom. Reconfigure and enclose existing roof deck into an enclosed w | $1 | Tammy Lawler | finaled |
| 40 | roofing | 2024-05-17 | AUSTIN | 1859 WESTLAKE DR BLDG BD | Demolish the existing boat dock and build a new one. New boat dock construction 2 stories partial roof cover concrete top deck composite wood lower de | Eric Martin Cerda | finaled | |
| 40 | roofing | 2024-05-15 | AUSTIN | 8903 SPLIT OAK CIR | repairing meter riser including conduit going through the roof and the wire from meter to weatherhead. | Justin Wagner | finaled | |
| 40 | roofing | 2024-05-15 | AUSTIN | 4500 LANGTRY LN | Install 20 (385W) roof mounted solar panels 7.700kW solar service system tying into a new 200 AMP rated MSP | Gregory Albright | finaled | |
| 40 | roofing | 2024-05-15 | AUSTIN | 1213 SABINE ST | Re-roof | Mike Pickel | finaled | |
| 40 | roofing | 2024-05-14 | AUSTIN | 8900 N LAMAR BLVD | Install 40mil PVC Duro-Last single ply roof system over existing membrane. | Kym Harris | finaled | |
| 40 | roofing | 2024-05-14 | AUSTIN | 11602 JANUARY DR | Express: roof repair | $1 | Jason Gibson | finaled |
| 40 | roofing | 2024-05-13 | AUSTIN | 7102 HANGING OAK CIR | Install 10.53kW DC roof mounted solar system | Mark Pride | finaled | |
| 40 | roofing | 2024-05-13 | AUSTIN | 3500 WERNER AVE | Express: Replace roof decking | $1 | Brian Fuller | finaled |
| 40 | roofing | 2024-05-09 | AUSTIN | 3019 SEA JAY DR | Install 13 (385W) roof mounted solar panels 5.005 kW solar service system tying into existing 125 AMP rated MSP | Gregory Albright | finaled | |
| 40 | roofing | 2024-05-08 | AUSTIN | 2017 KAREN AVE | Express: Shower conversion replace window like for like re-roof kitchen counter receptacles change out | Gustavo Martinez | finaled | |
| 40 | roofing | 2024-05-07 | AUSTIN | 3718 MENCHACA RD | UNIT 202 - New 3 story with attached garage office and roof top. 2/2.5 | $1 | Tammy Lindenberg | active |
| 40 | roofing | 2024-05-07 | AUSTIN | 3718 MENCHACA RD | UNIT 201 - New 3 story with attached garage office and roof top. 2/2.5 | Juan Garcia | finaled | |
| 40 | roofing | 2024-05-07 | AUSTIN | 3718 MENCHACA RD | UNIT 203 - New 3 story with attached garage office and roof top. 2/2.5 | Michael S. Bryant | active | |
| 40 | roofing | 2024-05-07 | AUSTIN | 3718 MENCHACA RD | UNIT 203 - New 3 story with attached garage office and roof top. 2/2.5 | $1 | Tammy Lindenberg | active |
| 40 | roofing | 2024-05-07 | AUSTIN | 4150 FREIDRICH LN | Roof Recover (layover) of an existing roof using 1/2 Polyiso insulation and mechanically attached Carlise 80 Mil TPO. | Cody Welch | finaled | |
| 40 | roofing | 2024-05-07 | AUSTIN | 3718 MENCHACA RD | UNIT 202 - New 3 story with attached garage office and roof top. 2/2.5 | Richard Valdez | active | |
| 40 | roofing | 2024-05-07 | AUSTIN | 3718 MENCHACA RD | UNIT 201 - New 3 story with attached garage office and roof top. 2/2.5 | Richard Valdez | active |