Permits
2,593 permits • page 15 of 26
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 40 | roofing | 2025-06-10 | AUSTIN | 6207 HARWIN LN | Express: Bath 1 to new tub/tile surround. Bath 2 to shower/tile surround. Replace copper pipes to PEX drains to PVC and new fans exhausted thru roof f | June Gordon | active | |
| 40 | roofing | 2025-06-10 | AUSTIN | 5904 HAMMERMILL RUN | INSTALL OF ROOF MOUNTED SOLAR PANELS | Jacob Tijerina | finaled | |
| 40 | roofing | 2025-06-09 | AUSTIN | 14910 NUTTALL DR | nuttall - roof top solar | Mark Barylski | finaled | |
| 40 | roofing | 2025-06-09 | AUSTIN | 4408 LONG CHAMP DR | Remove and replace existing roof. (Country Club) | Ryan Brooks | finaled | |
| 40 | roofing | 2025-06-06 | AUSTIN | 1000 PEGGOTTY PL | Express: Install new water heater replace roll roof and decking @ back patio replace electrical outlet @ kitchen disposal garage opener and rear porch | Jorge Canas | active | |
| 40 | roofing | 2025-06-05 | AUSTIN | 8700 SHOAL CREEK BLVD BLDG TNFM1 | ePlan-Expedited Review: New Construction of a Multi-Family Building. Fire Area 1 - also contains Fitness Club Business Center on Level 2 and Roof Club | Armando M. Lozano | active | |
| 40 | roofing | 2025-06-05 | AUSTIN | 4512 DENALI SUMMIT DR | ePlan: Expedited Review - New Apartments - Fire Area 1B - also contains Roof Lounge and Deck (129453 SF) | Greg Scott | active | |
| 40 | roofing | 2025-06-03 | AUSTIN | 7309 LAZY CREEK DR | Repairs/replacements to select existing roof membranes building new exterior wall for existing building where gymnasium wing is being demolished. | Richie Blevins | active | |
| 40 | roofing | 2025-06-02 | AUSTIN | 807 E 44TH ST | Express - Replacing roof decking boards and installation of a new roof | $1 | Ben Fuller | finaled |
| 40 | roofing | 2025-05-30 | AUSTIN | 5601 MENCHACA RD | The Secure Vestibule will be the creation of an enclosed entry space within the footprint of the existing building re-roofing and a slight reconfigura | Gregory Lee Gaddy | finaled | |
| 40 | roofing | 2025-05-30 | AUSTIN | 2801 PALOMINO TRL | Interior remodel: Construct new roof over existing roof framing. Code Enforcement Case Number CL-2023-111978. | $1 | Luis Garcia | active |
| 40 | roofing | 2025-05-30 | AUSTIN | 421 W 3RD ST | Replace an MAU on the roof like for like with another unit. | Israel Rodriguez | finaled | |
| 40 | roofing | 2025-05-30 | AUSTIN | 15900 BRATTON LN | Install approx 500ft of 1 steel gas piping across roof of building to site of future proposed evaporator | Weslee Jones | finaled | |
| 40 | roofing | 2025-05-28 | AUSTIN | 405 COMAL ST | Solar Installation 87.75 kw DC (161x545w Panels) on an Existing Commercial Roof | Lloyd Lee | finaled | |
| 40 | roofing | 2025-05-28 | AUSTIN | 4400 FRANKLIN PARK DR | Interior renovations to existing school to include MEP upgrades and mechanical roofing improvements AISD Project | Abel Martinez | finaled | |
| 40 | roofing | 2025-05-27 | AUSTIN | 2409 FOREST AVE BLDG 1 | New 2-story 4 bedroom 3.5 bathroom principal residence with attached garage covered porch uncovered roof terraces and habitable basement. | $0 | Lloyd McCarley | active |
| 40 | roofing | 2025-05-23 | AUSTIN | 811 W SLAUGHTER LN BLDG 41 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-23 | AUSTIN | 811 W SLAUGHTER LN BLDG 23 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-23 | AUSTIN | 811 W SLAUGHTER LN BLDG 38 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-23 | AUSTIN | 11900 VISTA PARKE DR BLDG 1 | Renovation and re-roofing of existing LISD support services and storage buildings within existing building footprints. This project will not alter th | Steve Everage | finaled | |
| 40 | roofing | 2025-05-23 | AUSTIN | 11900 VISTA PARKE DR BLDG 4 | Renovation and re-roofing of existing LISD support services and storage buildings within existing building footprints. This project will not alter th | Steve Everage | finaled | |
| 40 | roofing | 2025-05-23 | AUSTIN | 3201 WINDSOR RD | Modification to roof and walls of existing tower in a Type V existing worship space. Purpose of the modifications is to provide a space for a future | Colin Juren | finaled | |
| 40 | roofing | 2025-05-22 | AUSTIN | 4400 FRANKLIN PARK DR | Interior renovations to existing school to include MEP upgrades and mechanical roofing improvements AISD Project | Manuel De Santiago | finaled | |
| 40 | roofing | 2025-05-22 | AUSTIN | 1403 ALEGRIA RD | 1-story addition added to existing residence. New windows and exterior doors. Garage roof and existing roof to be tied in to new roof | Justin Wagner | finaled | |
| 40 | roofing | 2025-05-22 | AUSTIN | 5601 MENCHACA RD | The Secure Vestibule will be the creation of an enclosed entry space within the footprint of the existing building re-roofing and a slight reconfigura | Michael Irwin | finaled | |
| 40 | roofing | 2025-05-20 | AUSTIN | 710 E BEN WHITE BLVD SVRD WB | Reroof | Jeff Hundley | finaled | |
| 40 | roofing | 2025-05-19 | AUSTIN | 1641 LAKECLIFF HILLS LN | Installation of 18.45KW DC of Solar with 2 Tesla PW3 (23KW AC) roof top system. | Scott Wilson | finaled | |
| 40 | roofing | 2025-05-16 | AUSTIN | 11900 VISTA PARKE DR BLDG 1 | Renovation and re-roofing of existing LISD support services and storage buildings within existing building footprints. This project will not alter th | Salvador Lugo | finaled | |
| 40 | roofing | 2025-05-16 | AUSTIN | 11900 VISTA PARKE DR BLDG 4 | Renovation and re-roofing of existing LISD support services and storage buildings within existing building footprints. This project will not alter th | Salvador Lugo | finaled | |
| 40 | roofing | 2025-05-16 | AUSTIN | 11900 VISTA PARKE DR BLDG 4 | Renovation and re-roofing of existing LISD support services and storage buildings within existing building footprints. This project will not alter th | Steven R. Pomikahl | active | |
| 40 | roofing | 2025-05-16 | AUSTIN | 11900 VISTA PARKE DR BLDG 1 | Renovation and re-roofing of existing LISD support services and storage buildings within existing building footprints. This project will not alter th | Steven R. Pomikahl | active | |
| 40 | roofing | 2025-05-16 | AUSTIN | 9400 TEXAS OAKS DR | Complete Removal of Existing Membrane Roofing; Selective Demolition of HVAC Units Admin Area and Associated HRUs. Selective Demolition of Classroom Wa | ERIC C CAIN | active | |
| 40 | roofing | 2025-05-15 | AUSTIN | 7309 LAZY CREEK DR | Repairs/replacements to select existing roof membranes building new exterior wall for existing building where gymnasium wing is being demolished. | George Hobbs | active | |
| 40 | roofing | 2025-05-15 | AUSTIN | 11900 VISTA PARKE DR BLDG 4 | Renovation and re-roofing of existing LISD support services and storage buildings within existing building footprints. This project will not alter th | Donna Kirkpatrick | active | |
| 40 | roofing | 2025-05-15 | AUSTIN | 4604 DELANCEY DR | Install 19 (405W) roof mounted solar panels 7.695 kW solar service system tying into existing 225 AMP rated MSP | Travis Osburn | finaled | |
| 40 | roofing | 2025-05-15 | AUSTIN | 1403 ALEGRIA RD | 1-story addition added to existing residence. New windows and exterior doors. Garage roof and existing roof to be tied in to new roof | Ivan Gonzalez | finaled | |
| 40 | roofing | 2025-05-15 | AUSTIN | 3407 GALESBURG DR | Install 26 (405W) roof mounted solar panels 10.530 kW solar service system tying into existing 125 AMP rated MSP with 2 Enphase batteries | Travis Osburn | finaled | |
| 40 | roofing | 2025-05-15 | AUSTIN | 11900 VISTA PARKE DR BLDG 1 | Renovation and re-roofing of existing LISD support services and storage buildings within existing building footprints. This project will not alter th | Donna Kirkpatrick | active | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 39 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 24 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 34 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 33 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 36 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 30 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 14409 VARRELMAN ST | Temporary disconnect/reconnection to replace the load center in preparation for a 4.1 roof mounted solar system | Logan Stone | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 32 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 35 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 22 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 37 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 27 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 5520 HELEN ST | Commercial Re-Roof | Dianna Cruickshank | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 28 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 40 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 29 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 26 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 31 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 25 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-14 | AUSTIN | 811 W SLAUGHTER LN BLDG 42 | Re-roof of entire building. | Brad Davis | finaled | |
| 40 | roofing | 2025-05-13 | AUSTIN | 707 WINDLEDGE DR | Install 21 (405W) roof mounted solar panels 8.505 kW solar service system tying into existing 100 AMP rated MSP | Travis Osburn | finaled | |
| 40 | roofing | 2025-05-12 | AUSTIN | 12115 BLACK ANGUS DR | Express - Re-Roof and Re-sheathing | $1 | Stacie Feller | finaled |
| 40 | roofing | 2025-05-09 | AUSTIN | 4520 SIDEREAL DR | Install 16 (405W) roof mounted solar panels 6.480 kW solar service system tying into existing 200 AMP rated MSP | Travis Osburn | finaled | |
| 40 | roofing | 2025-05-09 | AUSTIN | 3204 PLANTATION RD | Install 11 (415W) roof mounted solar panels 4.565 kW solar service system tying into new 200 AMP rated MSP | Travis Osburn | finaled | |
| 40 | roofing | 2025-05-07 | AUSTIN | 2124 BURTON DR BLDG 11 | Replace exterior doors windows siding and asphalt shingle roofing. Repair entry stairs landings and balconies. *Electrical service temporarily remove | Jay Pace | finaled | |
| 40 | roofing | 2025-05-07 | AUSTIN | 2124 BURTON DR BLDG 4 | Replace exterior doors windows siding and asphalt shingle roofing. Repair entry stairs landings and balconies. | Jay Pace | finaled | |
| 40 | roofing | 2025-05-06 | AUSTIN | 10415 QUAIL RIDGE DR | Install 16 (405W) roof mounted solar panels 6.480 kW solar service system tying into new 200 AMP rated MSP | Travis Osburn | finaled | |
| 40 | roofing | 2025-05-05 | AUSTIN | 1000 PEGGOTTY PL | Express: Install new water heater replace roll roof and decking @ back patio replace electrical outlet @ kitchen disposal garage opener and rear porch | Benito Escobar | active | |
| 40 | roofing | 2025-05-05 | AUSTIN | 3701 DROSSETT DR UNIT 150 | Rewire 3 roof top HVAC units and replace 2 breakers | Mike Short | finaled | |
| 40 | roofing | 2025-05-05 | AUSTIN | 10717 SEA HERO LN | Installation of a 40 Modules - 16.400 kW DC 15.200 kW AC Roof Mount PV System | Chris Maxwell | finaled | |
| 40 | roofing | 2025-05-05 | AUSTIN | 709 MERIDEN LN | *partial demo* New exterior stairs replace roof & rear deck interior remodel Notary to be confirmed | $1 | Sammy Mahmoud | active |
| 40 | roofing | 2025-05-01 | AUSTIN | 6505 CONESTOGA WAGON WAY | Install 24 (405W) roof mounted solar panels 9.720 kW solar service system tying into existing 225 AMP rated MSP | Travis Osburn | finaled | |
| 40 | roofing | 2025-05-01 | AUSTIN | 5601 MENCHACA RD | The Secure Vestibule will be the creation of an enclosed entry space within the footprint of the existing building re-roofing and a slight reconfigura | Weldon Schmidt | finaled | |
| 40 | roofing | 2025-05-01 | AUSTIN | 6409 BLAKELY BND | Install 13 (410W) roof mounted solar panels 5.330 kW solar service system tying into existing 225 AMP rated MSP | Travis Osburn | finaled | |
| 40 | roofing | 2025-05-01 | AUSTIN | 4707 OLD CASTLE RD | Install 19 (405W) roof mounted solar panels 7.695 kW solar service system tying into new 200 AMP rated MSP | Travis Osburn | finaled | |
| 40 | roofing | 2025-05-01 | AUSTIN | 1000 PEGGOTTY PL | Express: Install new water heater replace roll roof and decking @ back patio replace electrical outlet @ kitchen disposal garage opener and rear porch | $1 | Christine Valdez | active |
| 40 | roofing | 2025-05-01 | AUSTIN | 12812 WILLOWGROVE LN | ADD ON TO EXISTING SYSTEM: Install 10 (405W) roof mounted solar panels 11.5 kW solar service system tying into existing 225 AMP MSP with Tesla Powerwa | Travis Osburn | finaled | |
| 40 | roofing | 2025-05-01 | AUSTIN | 5601 MENCHACA RD | The Secure Vestibule will be the creation of an enclosed entry space within the footprint of the existing building re-roofing and a slight reconfigura | Katherine Webb | finaled | |
| 40 | roofing | 2025-04-30 | AUSTIN | 7117 WOOD HOLLOW DR BLDG 13 | Shingle reroof scope: remove existing shingles and install new Tamko Titan (natural timber) shingles. 64 squares | Steven Needham | finaled | |
| 40 | roofing | 2025-04-30 | AUSTIN | 3518 MALONE DR | Installation of roof mounted solar panels and solar batteries | Adrian Buck | finaled | |
| 40 | roofing | 2025-04-29 | AUSTIN | 5803 AVERY ISLAND AVE | We will install a 8.20kW roof mount solar system conduct a Main Panel Upgrade and install an EV Charger. | Genaro Briones | finaled | |
| 40 | roofing | 2025-04-29 | AUSTIN | 4400 FRANKLIN PARK DR | Interior renovations to existing school to include MEP upgrades and mechanical roofing improvements AISD Project | Ereli Jaramillo Gonzalez | finaled | |
| 40 | roofing | 2025-04-28 | AUSTIN | 930 CASLANO CV | extend the dock roof and remove an unbuilt fireplace from the approved dock Site Plan. ref SP-2008-0476DS | Rafael Bencomo | finaled | |
| 40 | roofing | 2025-04-28 | AUSTIN | 6420 HART LN | New Construction tying into the Existing A3 Church. Creates a New Roof Line by Raising the Roof and Interior Remodel - 3 New Pads for the Air Conditio | Travis Crane | finaled | |
| 40 | roofing | 2025-04-28 | AUSTIN | 2938 PECAN SPRINGS RD | Express: Replace sheetrock replace HVAC replace all of the electrical wiring replace plumbing and drainage system new roof new paint | Juan Alcudia | finaled | |
| 40 | roofing | 2025-04-25 | AUSTIN | 6420 HART LN | New Construction tying into the Existing A3 Church. Creates a New Roof Line by Raising the Roof and Interior Remodel - 3 New Pads for the Air Conditio | Vidal Gonzalez | finaled | |
| 40 | roofing | 2025-04-25 | AUSTIN | 3419 N LAMAR BLVD | TPO Reroof | Steven Sartory | finaled | |
| 40 | roofing | 2025-04-24 | AUSTIN | 4505 TURNSTONE DR | Install 17 (415W) roof mounted solar panels 7.055 kW solar service system tying into new 200 AMP rated MSP | Travis Osburn | finaled | |
| 40 | roofing | 2025-04-24 | AUSTIN | 7117 WOOD HOLLOW DR BLDG 8 | Shingle reroof scope: remove existing shingles and install new Tamko Titan (natural timber) shingles. 58 squares | Steven Needham | finaled | |
| 40 | roofing | 2025-04-24 | AUSTIN | 7117 WOOD HOLLOW DR BLDG 9 | Shingle reroof scope: remove existing shingles and install new Tamko Titan (natural timber) shingles. 58 squares | Steven Needham | finaled | |
| 40 | roofing | 2025-04-24 | AUSTIN | 7117 WOOD HOLLOW DR BLDG 2 | Re-roof: Remove existing shingles and install new Tamko Titan (Natural Timber) shingles. | Steven Needham | finaled | |
| 40 | roofing | 2025-04-23 | AUSTIN | 3600 GREYSTONE DR BLDG 5 | Replace Landings and Cat Walk Replace Guardrails Replace Siding & Trim Install new Piers & Columns extend Roof over Stairs Install (1) LED Light Fixtu | John L Sanchez | finaled | |
| 40 | roofing | 2025-04-22 | AUSTIN | 6420 HART LN | New Construction tying into the Existing A3 Church. Creates a New Roof Line by Raising the Roof and Interior Remodel - 3 New Pads for the Air Conditio | Joe Ochoa | finaled | |
| 40 | roofing | 2025-04-21 | AUSTIN | 930 CASLANO CV | extend the dock roof and remove an unbuilt fireplace from the approved dock Site Plan. ref SP-2008-0476DS | $0 | David Kinard | finaled |
| 40 | roofing | 2025-04-21 | AUSTIN | 6420 HART LN | New Construction tying into the Existing A3 Church. Creates a New Roof Line by Raising the Roof and Interior Remodel - 3 New Pads for the Air Conditio | $1 | Tymothy Edwards | finaled |
| 40 | roofing | 2025-04-18 | AUSTIN | 13261 KERRVILLE FOLKWAY | Installation of a 9.020 kW DC | 7.600 kW AC roof mount PV system. | Chris Maxwell | finaled | |
| 40 | roofing | 2025-04-18 | AUSTIN | 13261 KERRVILLE FOLKWAY | We will need disconnect/reconnect as part of a PV inspection. Installation of a 9.020 kW DC | 7.600 kW AC roof mount PV system. | Chris Maxwell | finaled | |
| 40 | roofing | 2025-04-18 | AUSTIN | 1403 ALEGRIA RD | 1-story addition added to existing residence. New windows and exterior doors. Garage roof and existing roof to be tied in to new roof | $1 | Clayton Gilbert | finaled |
| 40 | roofing | 2025-04-17 | AUSTIN | 10556 BILBROOK PL | Construct 1 story 3 single slope super foam roof with shingles over new concrete | $1 | Michael Moore | finaled |
| 40 | roofing | 2025-04-17 | AUSTIN | 9400 TEXAS OAKS DR | Complete Removal of Existing Membrane Roofing; Selective Demolition of HVAC Units Admin Area and Associated HRUs. Selective Demolition of Classroom Wa | Joseph Rodriguez | active | |
| 40 | roofing | 2025-04-15 | AUSTIN | 4600 SECLUDED HOLW | Express: install tesla solar roof | Robert Krous | finaled | |
| 40 | roofing | 2025-04-14 | AUSTIN | 715 WEST AVE | express: replace roof decking over 128 sq ft | $1 | Harold Peterson | finaled |