ScoreTradeDateCityAddressDescriptionValueContractorStatus
40solar2025-10-14AUSTIN2201 LANGFORD CVDue to Solar Auxiliary failing inspection for clearance issues main panel size and meter pan issues. We are upgrading meter can main panel and relocatScott Wilsonfinaled
40solar2025-10-13AUSTIN9600 RYOAKS CVDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Adrian Buckfinaled
40solar2025-10-10AUSTIN11923 SKY WEST DRnew rooftop solar install 8.5 kW DC total of 20 425 W panel and a tesla inverter 7.6 kW ACAdam Palaciosfinaled
40solar2025-10-10AUSTIN11923 SKY WEST DRMain panel Upgrade to accommodate the additional solar capacityAdam Palaciosfinaled
40solar2025-10-10AUSTIN1625 WATCHHILL RDDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Adrian Buckfinaled
40solar2025-10-09AUSTIN12915 N US 183 HWY SVRD NBInstallation of a 85.36 kW solar PV system. Consisting of (1) 3-string inverters roof mounted arrays and corresponding electrical metering and safetyAdrian Buckfinaled
40solar2025-10-08AUSTIN3005 LYNRIDGE DRNeed reconnection of Solar PV Meter after meter was removed during construction project. No new solar panels or ESS to be installed. (re-opened per AEric Hoffmanfinaled
40solar2025-10-03AUSTIN3807 ROCKLEDGE DRInstallation of 8.1kW Solar with Battery PV SystemMichael Novakfinaled
40solar2025-10-03AUSTIN14800 HYSON XINGINSTALLATION OF A 6.88 SOLAR PANEL SYSTEM WITH 16 ROOF MOUNTED SOLAR SYSTEM AND 1 SOLAREDGE INVERTERLogan Stonefinaled
40solar2025-10-02AUSTIN4453 STONY MEADOW LNInstallation of a 8.17kW Solar PV SystemMichael Novakfinaled
40solar2025-10-02AUSTIN10421 JENNYS JUMP DRREQUEST TO DISCONNECT Disconnect/reconnect to tie in PV/ESS components. We are not upgrading the size of the service not upgrading the meter size.Adrian Buckfinaled
40solar2025-10-01AUSTIN6043 BEL FAY LNTo install 29 solar panels and 2 batteries outside.Alejandro Mompazfinaled
40solar2025-10-01AUSTIN6043 BEL FAY LNPermit required for outage. Outage needed to tie in solar system. Please reference Auxiliary Permit 2025-124090 EP at 6043 BEL FAY LANEAlejandro Mompazfinaled
40solar2025-09-30AUSTIN7300 ANAQUA DRInstalling a 7.83 kW PV solar system and 1 Tesla PW 3Michael Solanofinaled
40solar2025-09-30AUSTIN9700 E US 290 HWY SVRD WB BLDG 37Commercial rooftop solar PV array installation to offset onsite energy consumptionJoseph Birkenbackfinaled
40solar2025-09-29AUSTIN7101 N IH 35 SVRD NBRooftop SolarMark Prideactive
40solar2025-09-26AUSTIN11704 N LAMAR BLVDRooftop Solar for existing Multi-family housing.Mark Pridefinaled
40solar2025-09-25AUSTIN6018 PONCA ST BLDG 1Installing a 9.2 kW PV solar system and 1 Tesla PW 3Michael Solanofinaled
40solar2025-09-23AUSTIN3600 E K LNPermit required for outage. Outage needed to tie in solar system. Please reference Auxiliary Permit 2025-113376 EP at 3600 E K LNAlejandro Mompazfinaled
40solar2025-09-22AUSTIN11704 N LAMAR BLVDRooftop Solar for existing Multi-family housing.Jeff Bendallactive
40solar2025-09-22AUSTIN7101 N IH 35 SVRD NBRooftop SolarJeff Bendallactive
40solar2025-09-22AUSTIN9029 RATTLESNAKE TRLDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Adrian Buckfinaled
40solar2025-09-19AUSTIN14608 OLIVE HILL DRInstallation of 14.19kW Solar InstallationMichael Novakfinaled
40solar2025-09-18AUSTIN6308 MESA GRANDE DRInstallation of 9.03kW Solar PV SystemMichael Novakfinaled
40solar2025-09-18AUSTIN3109 WILD ROCK CVInstallation of 13.76kW Solar PV SystemMichael Novakfinaled
40solar2025-09-18AUSTIN5808 BELL TOWER LNadding a solar pv rooftop system to an existing residenceDavid Davisfinaled
40solar2025-09-17AUSTIN6804 STAR DRBrunson - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _150__ Main Breaker. Upgrading revenue meter to 200 AmpsMark Bedellfinaled
40solar2025-09-17AUSTIN4900 MUELLER BLVDInstall 172 solar panels.Arnulfo Carrilloactive
40solar2025-09-17AUSTIN205 E SKYVIEW RDReplacing existing 7.6 kW AC inverter with 11.5 kW AC inverter and energy storage system. Pre-existing solar panels installed not be changed.David Wrightfinaled
40solar2025-09-17AUSTIN205 E SKYVIEW RDRequest to Disconnect installing 200 amp automatic transfer switch on the existing 200 amp main breaker for energy storage system.David Wrightfinaled
40solar2025-09-17AUSTIN3704 GABLE DRupgrading a load center to accommodate adding a solar system on a separate active permit (2025-106260 EP)David Davisfinaled
40solar2025-09-16AUSTIN10931 RESEARCH BLVD SVRD NB UNIT BInstall an 80 kW AC roof-mounted solar photovoltaic system or existing commercial building meter 6156331- ccb shows this meter number as Unit A- thisAdrian Buckfinaled
40solar2025-09-16AUSTIN4009 LEWIS LN BLDG BInstallation of 9.46 kW Solar PV Installation with battery backupMichael Novakfinaled
40solar2025-09-16AUSTIN4009 LEWIS LN BLDG AInstallation of 9.46 kW Solar PV Installation with battery backupMichael Novakfinaled
40solar2025-09-16AUSTIN2721 BARTON SKWYShutdown needed for Installation of a 13.92kW system with 1 Powerwall 3 & 1 EV chargerRobert Krousfinaled
40solar2025-09-16AUSTIN10931 RESEARCH BLVD SVRD NB UNIT BInstall an 80 kW AC roof-mounted solar photovoltaic system or existing commercial building meter 6156331Adrian Buckactive
40solar2025-09-16AUSTIN8016 JOURNEYVILLE DRInstallation of 14.62kW Solar SystemMichael Novakfinaled
40solar2025-09-15AUSTIN8609 BROOKFIELD DRInstallation of 4.5KW Solar PV and 8KWH Energy Storage System to Residence.Eric Hoffmanfinaled
40solar2025-09-15AUSTIN3704 GABLE DRadding a solar pv rooftop system to an existing residenceDavid Davisfinaled
40solar2025-09-15AUSTIN9700 E US 290 HWY SVRD WB BLDG MSBATurnkey 5.5 MW Rooftop PV installation including but not limited to: rooftop PV panel racking system and ballasting PV panel equipment DC/AC electricaJoseph Birkenbackfinaled
40solar2025-09-12AUSTIN4133 LAWLESS STThis is a repair of PV meter permit on an existing project!!William Johnsonfinaled
40solar2025-09-11AUSTIN5301 DIMESKY LNRemoval/reinstallation of existing solar system. AE. No changes being made.Wesley Davisactive
40solar2025-09-10AUSTIN5512 COVENTRY LN6.44kW rooftop solar installationMark Pridefinaled
40solar2025-09-10AUSTIN1505 W 29TH STInstallation of 11.5KW Solar PV and 30KWH Energy Storage System to Residence.Eric Hoffmanfinaled
40solar2025-09-10AUSTIN11925 ROTHERHAM DRSolar installationJEREMIE BRANTONfinaled
40solar2025-09-10AUSTIN4604 AVENUE DDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Adrian Buckfinaled
40solar2025-09-09AUSTIN12610 VELARDE CVTo install 15 solar panels.Alejandro Mompazfinaled
40solar2025-09-09AUSTIN4501 ROUNDUP TRLDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Adrian Buckfinaled
40solar2025-09-09AUSTIN3600 E K LNTo install 22 solar panels and 1 batteryAlejandro Mompazfinaled
40solar2025-09-08AUSTIN8517 FENTON DRInstallation of 17.94 kW Solar PV Installation with battery backupMichael Novakfinaled
40solar2025-09-08AUSTIN9700 E US 290 HWY SVRD WB BLDG MSBATurnkey 5.5 MW Rooftop PV installation including but not limited to: rooftop PV panel racking system and ballasting PV panel equipment DC/AC electricaJoseph Birkenbackfinaled
40solar2025-09-06AUSTIN1305 HILLSIDE AVEadding a solar pv rooftop system to an existing residenceDavid Davisfinaled
40solar2025-09-06AUSTIN1305 HILLSIDE AVEshutdown to safely add a MDS breaker and tie in solar equipmentDavid Davisfinaled
40solar2025-09-05AUSTIN9808 BRANDYWINE CIRINSTALLATION OF A 6.88KW SOLAR SYSTEM WITH 16 ROOF MOUNTED SOLAR PANLES 16 MICRO-INVERTERS AND 1 ENPHASE BATTERYLogan Stonefinaled
40solar2025-09-05AUSTIN2529 BAXTER DRRodriguez - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _200__ Main Breaker. Upgrading revenue meter to 200 AmMark Bedellfinaled
40solar2025-09-05AUSTIN4517 SECURE LNTo install 22 panels and a batteryAlejandro Mompazfinaled
40solar2025-09-04AUSTIN11217 HENGE DRPermit required for outage. Outage needed to tie in solar system. Please reference Auxiliary Permit 2025-098324 EPAlejandro Mompazfinaled
40solar2025-09-04AUSTIN9521 LYNNHAVEN STadding a solar pv rooftop system to an existing residenceDavid Davisfinaled
40solar2025-09-04AUSTIN12420 THOMPKINS DR20 tunnel starting from cleanout to expose broken pipe under slab. This is a spot repair under slab in tunnel **main drain line under the slab. A 3 PVSamuel Martinfinaled
40solar2025-09-04AUSTIN1101 QUAIL PARK DRPermit Required for Outage Outage needed to tie in solar system. Please reference Auxiliary Permit 2025-093140 EPAlejandro Mompazfinaled
40solar2025-09-04AUSTIN3610 OVERLORD LNDisconnect/Reconnect Customer signed for a Tesla Energy Storage System (ESS) installation. In order to interconnect the ESS equipment and perform a whDavid Conradfinaled
40solar2025-09-03AUSTIN2200 W 9TH STInstalling 10.32 kW of solar capacity + 13.5 kWh ESS on an existing residence.Arthur Bucheractive
40solar2025-09-03AUSTIN10509 D K RANCH RDInstallation of 6.44kW Rooftop SolarMark Pridefinaled
40solar2025-09-03AUSTIN4307 SENDERO DRAdd 27 KWH Energy Storage System to existing Solar PV System on residence.Eric Hoffmanfinaled
40solar2025-09-02AUSTIN5616 S 1ST ST UNIT 6Installation of (1) Tesla Powerwall 3 to an existing systemRobert Krousfinaled
40solar2025-09-02AUSTIN12357 RIATA TRACE PKWY BLDG C UNIT 7install solar to existing rooftop.. BUILDING C UNIT 7Jason Thomasfinaled
40solar2025-09-02AUSTIN8629 TORO CREEK CV UNIT AINSTALLATION OF An 8.0KW SOLAR PANEL SYSTEM WITH 1 TESLA POWERWALL 3 INTERGRATED INVERTERLogan Stonefinaled
40solar2025-09-02AUSTIN8629 TORO CREEK CV UNIT ATEMPORARY DISCONNECT/ RECONNECTION REQUESTED FOR A TELSA POWERWALL INSTALLLogan Stonefinaled
40solar2025-09-02AUSTIN5616 S 1ST ST UNIT 6Shutdown needed for installation of 1 Powerwall 3. Removing current Fronius inverter and replacing with PowerwallRobert Krousfinaled
40solar2025-09-02AUSTIN8416 VALERIO LNDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Adrian Buckfinaled
40solar2025-08-30AUSTIN3006 LOCKE LNTo install 27 solar panels and a batteryAlejandro Mompazfinaled
40solar2025-08-29AUSTIN2209 GALWAY STSOLAR ROOFTOPPaul Joyceactive
40solar2025-08-27AUSTIN5414 EVANS AVERequest to disconnect New 200 amp automatic transfer switch installation on the existing 200 amp panel no new meter can is required. Battery backup iDavid Wrightfinaled
40solar2025-08-27AUSTIN9225 FM 2244 RD BLDG AInstall rooftop solar system to existing commercial only. Address is located in the ETJJason A Thomasfinaled
40solar2025-08-26AUSTIN2113 CLIFFS EDGE DRInstallation of 9.03kW Solar PV InstallationMichael Novakfinaled
40solar2025-08-22AUSTIN12100 BLACK ANGUS DRRequest to Disconnect Installation of a solar PV system and a Franklin WH battery with 200 amp transfer switch. This involves a main service panel chaDavid Wrightfinaled
40solar2025-08-22AUSTIN10008 LAVON BNDPEC electric service. Installing automatic transfer switch with solar battery system.David Wrightfinaled
40solar2025-08-21AUSTIN3203 SANTA MONICA DRInstallation of 11.5KW Solar PV System to Residence.Eric Hoffmanfinaled
40solar2025-08-21AUSTIN201 N LOWELL LNDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Adrian Buckfinaled
40solar2025-08-19AUSTIN6020 EDEN DRadding a solar pv rooftop system to an existing residenceDavid Davisfinaled
40solar2025-08-19AUSTIN1136 EASTFIELD AVEInstallation of a 11.745kW system with a 7.6kW Tesla Inverter. NO batteriesRobert Krousfinaled
40solar2025-08-15AUSTIN8210 MARIGNY WAYTo install 19 solar panels and 1 batteryAlejandro Mompazfinaled
40solar2025-08-15AUSTIN4213 PARKWOOD RDBROWN - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _200__ Main Breaker. Upgrading revenue meter to 200 Amps.Mark Bedellfinaled
40solar2025-08-13AUSTIN617 HIGHLAND AVEInstallation of 10.12KW Solar PV System to Residence.Eric Hoffmanfinaled
40solar2025-08-13AUSTIN5805 PINON VISTA DRInstallation of 13.8KW Solar PV System to Residence.Eric Hoffmanfinaled
40solar2025-08-13AUSTIN2712 KINGSLAND WAY12.15kW Photovoltaic System (x30) REC 405W MOdules (x8) Hoymiles HM-1500 Micro InvertersArturo Acunaactive
40solar2025-08-12AUSTIN205 E ST ELMO RDInstallation of 76.15 kw rooftop PV system.Adrian Buckactive
40solar2025-08-12AUSTIN10501 BRIMFIELD CTFor the installation of rooftop solar panels and batteriesMarco Chavezfinaled
40solar2025-08-11AUSTIN5701 BULLARD DRINSTALLATION OF A 5.600 SOLAR PANEL SYSTEM WITH 14 MODULES AND 1 SOLAREDGE INVETERLogan Stonefinaled
40solar2025-08-11AUSTIN1145 EBERT AVEDisconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 125 Main Breaker. Upgrading revenue meter to 200 Amps.Mark Bedellfinaled
40solar2025-08-09AUSTIN6317 BIG CAT CVREQUEST TO DISCONNECT - MUNOZ - Disconnect/reconnect power to tie in PV component and upgrading MSP to _7.9__ Amps. _125__ Main Breaker.Mark Bedellfinaled
40solar2025-08-08AUSTIN7604 ORRICK DRDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Adrian Buckfinaled
40solar2025-08-07AUSTIN1105 CRYSTAL CREEK DRInstallation of 57 REC 450W Pure Solar Panels with 2 Tesla Powerwall 3 and Gateway 3. 24 Tesla Mid Circuit Interrupters will be used for meeting rapidScott Wilsonfinaled
40solar2025-08-07AUSTIN1509 WOODLAWN BLVDInstall additional energy storage system only to existing system. Overhead AEWesley Davisfinaled
40solar2025-08-07AUSTIN4503 ROUNDUP TRLDisconnect/reconnect to Upgrade main distribution panel. Disconnect/reconnect to tie in pv/ESS components.Adrian Buckfinaled
40solar2025-08-06AUSTIN1403 CORONA DRInstallation of 5.52KW Solar PV System to Residence.Eric Hoffmanfinaled
40solar2025-08-06AUSTIN1835 KRAMER LN BLDG B UNIT 125Rooftop Solar with Line Side Tap InterconnectionMark Pridefinaled
40solar2025-08-06AUSTIN1835 KRAMER LN BLDG B UNIT 100Rooftop Solar with Line Side Tap Interconnection.Mark Pridefinaled
40solar2025-08-06AUSTIN11217 HENGE DRTo install 22 panels and 1 batteryAlejandro Mompazfinaled
40solar2025-08-05AUSTIN11012 WARDOUR LNWe need a power shut down to safely interconnect the new solar system to the gridDavid Rizofinaled