Permits
2,956 permits • page 12 of 30
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 45 | roofing | 2024-10-18 | AUSTIN | 2219 MANOR RD | Mechanically attach new .60 mil. TPO over existing hail damage modified. No structural changes. | Daniel McCoy | finaled | |
| 45 | roofing | 2024-09-30 | AUSTIN | 607 RED RIVER ST | Roof Replacement | Molly Johnston | finaled | |
| 45 | roofing | 2024-09-12 | AUSTIN | 8733 BURNET RD | Roof Replacement to existing Retail Building | Molly Johnston | finaled | |
| 45 | roofing | 2024-08-13 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | David Paone | finaled | |
| 45 | roofing | 2024-07-03 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | Keating Kuhn | finaled | |
| 45 | roofing | 2024-07-03 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | David Demoss | finaled | |
| 45 | roofing | 2024-06-17 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | $1 | Cameron Treme | finaled |
| 45 | roofing | 2024-06-11 | AUSTIN | 3811 AIRPORT BLVD | Replacement of TPO roof system. New system to meet IECC minimum requirements of R-25. | Steven Sartory | finaled | |
| 45 | roofing | 2024-05-28 | AUSTIN | 6205 BURNET RD | Replace existing TPO membrane from hail damage april 9 2024. Remove existing .60 mil. TPO and replace with new .60 mil. TPO using TPO bonding adhesive | Daniel McCoy | finaled | |
| 40 | roofing | 2026-09-29 | AUSTIN | 3907 SOUTH INDUSTRIAL DR | Simple re-roof. Existing Austin Water offices. | Jaleel Natour | active | |
| 40 | roofing | 2026-09-29 | AUSTIN | 3306 CHERRY LN | additionof attached screened porch. Composite Deck 19x16 and a screen enclosed covering lean-to style roof cover | $1 | Brian Johnson | active |
| 40 | roofing | 2026-09-29 | AUSTIN | 13006 COUNCIL BLUFF DR | Express - Re-roof replace siding and replacing 9 windows. | $1 | HIPOLITO CASTANO | active |
| 40 | roofing | 2026-09-29 | AUSTIN | 3000 GUADALUPE ST | Reroof of TAMKO Titan XT Class 3 - Weathered Wood dimensional asphalt shingles. Existing multifamily. | Nathan Navarro | active | |
| 40 | roofing | 2026-09-28 | AUSTIN | 11108 BEXLEY LN | New 1-story detached stand-alone bathroom 8x10 single slope roof containing plumbing/electrical. | Gary Anderson | active | |
| 40 | roofing | 2026-09-28 | AUSTIN | 606 W ELIZABETH ST | Porch Enclosure- Enclose existing second floor balcony to create a sunroom. No expansion of building footprint of modification to existing roof columns beams or framing. EP added 9/28/2026 | Paul Bolin | applied | |
| 40 | roofing | 2026-09-25 | AUSTIN | 709 MERIDEN LN | *partial demo* New exterior stairs replace roof & rear deck interior remodel Notary to be confirmed | Daniel Nova | active | |
| 40 | roofing | 2026-09-25 | AUSTIN | 6905 DONEGAL RD | Express: re-roof | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-09-24 | AUSTIN | 2500 DOVE SPRINGS DR | Express- Reroof shingle to shingle. | $1 | Stacie Feller | finaled |
| 40 | roofing | 2026-09-23 | AUSTIN | 12221 N MOPAC EXPY SVRD NB | Reroof - emergency department and postpartum. Existing hospital. | Miguel Juarez | active | |
| 40 | roofing | 2026-09-18 | AUSTIN | 5613 SHOALWOOD AVE | Roof mounted solar | Mark Pride | active | |
| 40 | roofing | 2026-09-18 | AUSTIN | 13212 N LAMAR BLVD | Remodel of restrooms on the first and second levels; new window openings in the existing exterior walls at weight room; new roof top skylights lighting and acoustical tiles at corridor north of competition gym | Ian Rolls | active | |
| 40 | roofing | 2026-09-18 | AUSTIN | 5811 RISING HILLS DR | 8.28kw roof mounted solar system | Mark Pride | active | |
| 40 | roofing | 2026-09-18 | AUSTIN | 2103 E M FRANKLIN AVE | Overylay roof with Karnak Silicone Roofing System | Jason Armstrong | active | |
| 40 | roofing | 2026-09-17 | AUSTIN | 4825 DAVIS LN BLDG 14 | simple re-roof - remove and replace shingles on existing roof. BLDG 14 | Brad Davis | finaled | |
| 40 | roofing | 2026-09-17 | AUSTIN | 3600 GREYSTONE DR BLDG 10 | Re-roof | Ryan Curtis | active | |
| 40 | roofing | 2026-09-17 | AUSTIN | 3600 GREYSTONE DR BLDG 9 | Re-roof | Ryan Curtis | active | |
| 40 | roofing | 2026-09-17 | AUSTIN | 4825 DAVIS LN BLDG 21 | simple re-roof - remove and replace shingles on existing roof. BLDG 21 | Brad Davis | finaled | |
| 40 | roofing | 2026-09-17 | AUSTIN | 3600 GREYSTONE DR BLDG 11 | Re-roof | Ryan Curtis | active | |
| 40 | roofing | 2026-09-17 | AUSTIN | 3600 GREYSTONE DR | Re-roof for Mailbox | Ryan Curtis | active | |
| 40 | roofing | 2026-09-17 | AUSTIN | 3600 GREYSTONE DR BLDG 1 | Re-roof | Ryan Curtis | active | |
| 40 | roofing | 2026-09-17 | AUSTIN | 11117 CAP STONE DR | Express: Wui Zone A/B - Reroofing with Class A Fire Roofing Material- Owens Coming Duration shingles and OC underlayment mesh in ventilation. | $1 | Fareed Tulbah | active |
| 40 | roofing | 2026-09-17 | AUSTIN | 3600 GREYSTONE DR | Re-roof for office | Ryan Curtis | active | |
| 40 | roofing | 2026-09-17 | AUSTIN | 4825 DAVIS LN BLDG 16 | simple re-roof - remove and replace shingles on existing roof. BLDG 16 | Brad Davis | finaled | |
| 40 | roofing | 2026-09-17 | AUSTIN | 4825 DAVIS LN BLDG 19 | simple re-roof - remove and replace shingles on existing roof. BLDG 19 | Brad Davis | finaled | |
| 40 | roofing | 2026-09-17 | AUSTIN | 3600 GREYSTONE DR BLDG 12 | Re-roof | Ryan Curtis | active | |
| 40 | roofing | 2026-09-17 | AUSTIN | 3600 GREYSTONE DR BLDG 13 | Re-roof | Ryan Curtis | active | |
| 40 | roofing | 2026-09-17 | AUSTIN | 3600 GREYSTONE DR BLDG 5 | Re-roof | Ryan Curtis | active | |
| 40 | roofing | 2026-09-17 | AUSTIN | 3600 GREYSTONE DR BLDG 8 | Re-roof | Ryan Curtis | active | |
| 40 | roofing | 2026-09-17 | AUSTIN | 3708 BONNELL DR | Interior Remodel 4/23/26 SM - REVISED ** Replace multiple windows and doors (primary suite windows to remain). Bath 1 window to be reframed replace brick gable with 3/4 cement board siding Hall sheetrock to be replaced (ceiling and walls) replace roof. | Gilbert Rosipal | active | |
| 40 | roofing | 2026-09-17 | AUSTIN | 4825 DAVIS LN BLDG 15 | simple re-roof - remove and replace shingles on existing roof. BLDG 15 | Brad Davis | finaled | |
| 40 | roofing | 2026-09-17 | AUSTIN | 3600 GREYSTONE DR BLDG 6 | Re-roof | Ryan Curtis | active | |
| 40 | roofing | 2026-09-17 | AUSTIN | 4825 DAVIS LN BLDG 20 | simple re-roof - remove and replace shingles on existing roof. | Brad Davis | finaled | |
| 40 | roofing | 2026-09-16 | AUSTIN | 4617 PEACH GROVE RD | Express - Re-roof (Shingle to Shingle) | $1 | Stacie Feller | finaled |
| 40 | roofing | 2026-09-16 | AUSTIN | 2300 LEAR LN | Express: Reroof | $1 | Stacie Feller | finaled |
| 40 | roofing | 2026-09-15 | AUSTIN | 3708 BONNELL DR | Interior Remodel 4/23/26 SM - REVISED ** Replace multiple windows and doors (primary suite windows to remain). Bath 1 window to be reframed replace brick gable with 3/4 cement board siding Hall fur down to be deleted (sheetrock to be replaced ceiling and walls) replace roof. Everything else is cosmetic. | Richard J Rinehart | active | |
| 40 | roofing | 2026-09-14 | AUSTIN | 4001 CAMPO VIEJO CV | New 1-story detached accessory structure (pool side cabana) 1 bath with stone veneer flat TPO roof wood frame on drilled concrete caissons. Cabana includes bathroom (shower + WC). Reconnect to existing underground electrical conduit previously servicing pergola. Install new 60 amp subpanel in cabana. One dedicated circuit for 1-ton ductless mini-split (230v) | Oscar Prince Jr. | active | |
| 40 | roofing | 2026-09-14 | AUSTIN | 11108 BEXLEY LN | New 1-story detached stand-alone bathroom 8x10 single slope roof containing plumbing/electrical. | $0 | Joshua Bucio | active |
| 40 | roofing | 2026-09-14 | AUSTIN | 1118 RICHARDINE AVE | Express- Foundation repair (lift 3 ft per code) replace roof with asphalt shingles siding replace 6 windows (same size) replace exterior doors (same size) skim coat interior walls interior/exterior paint replace interior doors (same size) flooring replace some floor decking upgrade plumbing fixtures electrical fixtures upgrade exterior electrical panel replace hvac | Eric Garcia | active | |
| 40 | roofing | 2026-09-11 | AUSTIN | 1729 E 38TH HALF ST | EXPRESS: Re-Roofing with new decking | $1 | Ami Feller | finaled |
| 40 | roofing | 2026-09-10 | AUSTIN | 11016 ALHAMBRA DR | Completely remove old main service including rag wire. Installing new 200 amp through the roof mast to current code. | Ronald Norwood | finaled | |
| 40 | roofing | 2026-09-09 | AUSTIN | 2315 E ANDERSON LN SVRD EB | Remove/replace existing roof system as required and install new TPO roofing system. No structural work. No insulation work no changes to the pitch | Kathleen Marston | finaled | |
| 40 | roofing | 2026-09-08 | AUSTIN | 4825 DAVIS LN BLDG 17 | simple re-roof - remove and replace shingles on existing roof. BLDG 17 | Brad Davis | finaled | |
| 40 | roofing | 2026-09-08 | AUSTIN | 4825 DAVIS LN BLDG 18 | simple re-roof - remove and replace shingles on existing roof. BLDG 18 | Brad Davis | finaled | |
| 40 | roofing | 2026-09-08 | AUSTIN | 4115 HONEYCOMB ROCK CIR | Addition and remodel: full interior remodel with small interior additions on rear and new covered back porch all new interior finishes and fixtures all new exterior windows doors roofing and siding (except brick) new gas fire place decorative structural changes to front side of roof all new plumbing and electrical. Pool not in scope | Matthew Archer | active | |
| 40 | roofing | 2026-09-04 | AUSTIN | 2116 HANCOCK DR | Installation of a new TPO Roofing System. Existing retail. | Nathan Navarro | active | |
| 40 | roofing | 2026-09-03 | AUSTIN | 2424 S LAMAR BLVD | Roof overlay with mechanically fastened TPO. Existing retail. | Molly Johnston | active | |
| 40 | roofing | 2026-09-02 | AUSTIN | 2006 HAMILTON AVE | Have a customer with a 100amp service that needs the service panel replaced. The overhead riser is an old SER feeder so we were asked to replace the overhead with a rigid conduit thru the roof eave. The meter can has no issues but since replacing the riser and the panel we are going to go ahead and replace the meter can with a 200amp. There is no additional load added. We will need to schedule a shut down and turn back on the same day with A&E. Thank you | Steven Brown | active | |
| 40 | roofing | 2026-09-01 | AUSTIN | 601 RIO GRANDE ST UNIT 300 | ePlan: Commercial Expedited Review - Exterior Remodel of an Existing Pool Bar Area and Addition of New Roof Area Over Two Portions of Level 3 (16000 SF) | Matthew C Dunn | active | |
| 40 | roofing | 2026-09-01 | AUSTIN | 1605 W 11TH ST | Express: Replace siding insulation drywall doors and windows; new electrical new A/C drain line re-roof | Khanh Pham | active | |
| 40 | roofing | 2026-09-01 | AUSTIN | 307 FRANKLIN BLVD | REQUEST TO DISCONNECT Newton 39-92630. Disconnect/reconnect power to tie in PV component. Upgrading MSP to 200 Amps. 200 - Main Breaker. Upgrading revenue meter to 200 Amps. Extending overhead mast/weather head to over 8ft above roof plane only. | Mark Bedell | finaled | |
| 40 | roofing | 2026-09-01 | AUSTIN | 601 RIO GRANDE ST UNIT 300 | ePlan: Commercial Expedited Review - Exterior Remodel of an Existing Pool Bar Area and Addition of New Roof Area Over Two Portions of Level 3 (16000 SF) | Jacob Elrod | active | |
| 40 | roofing | 2026-09-01 | AUSTIN | 11008 JORDAN LN | Replacing the shingles of the roof removing pantry removing 1 bedroom closet removing and replacing a bearing wall with a 16 ft x 1 ft beam. Converting some of the garage to habitable space proposed 221 SF. | $1 | Suzie Alcivar | active |
| 40 | roofing | 2026-08-31 | AUSTIN | 610 DAVIS ST BLDG 1FLR UNIT 55 | ePlan: Expedited Review - Finish-Outs for Units on Level 55 with Roof Terrace (16551 SF) | Scott Tomhave | active | |
| 40 | roofing | 2026-08-27 | AUSTIN | 10816 WARDOUR LN | Express: Re-roofing (located in WUI) | $1 | Drew Proctor | finaled |
| 40 | roofing | 2026-08-27 | AUSTIN | 13212 N LAMAR BLVD | Remodel of restrooms on the first and second levels; new window openings in the existing exterior walls at weight room; new roof top skylights lighting and acoustical tiles at corridor north of competition gym | Thomas Montanez | active | |
| 40 | roofing | 2026-08-21 | AUSTIN | 1185 OAK GROVE AVE | Express: Replace drywall fixtures (like for like) countertops cabinets appliances flooring windows and doors like for like siding electrical outlets mechanical system roof shingles upgrade electrical service | $1 | Mark Taylor | active |
| 40 | roofing | 2026-08-19 | AUSTIN | 1501 HUCKLEBERRY LN | Express: Wui zone C reroofing with Class a Fire Roofing Material- Owens Coming Duration shingles and OC underlayment mesh in ventilation. | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-08-19 | AUSTIN | 10817 RIVER PLANTATION DR | Express: Wui zone C reroofing with Class a Fire Roofing Material- Owens Coming Duration shingles and OC underlayment mesh in ventilation. | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-08-18 | AUSTIN | 119 W 8TH ST | Re-Roof TPO Layover. Existing office building. | Daniel McCoy | finaled | |
| 40 | roofing | 2026-08-14 | AUSTIN | 2701 MOUNTAIN LAUREL LN | Rear covered patio addition with a galvanized steel roof (270 sqft) | Luis Ramirez | active | |
| 40 | roofing | 2026-08-14 | AUSTIN | 1118 RICHARDINE AVE | Express- Foundation repair (lift 3 ft per code) replace roof with asphalt shingles siding replace 6 windows (same size) replace exterior doors (same size) skim coat interior walls interior/exterior paint replace interior doors (same size) flooring replace some floor decking upgrade plumbing fixtures electrical fixtures upgrade exterior electrical panel replace hvac | $1 | Christi Johnson | active |
| 40 | roofing | 2026-08-14 | AUSTIN | 6412 KING GEORGE DR | Express: of decking on roof Replace shingle; Replace HVAC system | Cecilia Lopez | finaled | |
| 40 | roofing | 2026-08-12 | AUSTIN | 4711 CRESTWAY DR | Addition: Re-roofing existing front porch with new porch addition | $1 | Dave Weber | active |
| 40 | roofing | 2026-08-11 | AUSTIN | 7825 ELKHORN MOUNTAIN TRL | Re roofing project. SBS and metal panel | Jason Milliken | active | |
| 40 | roofing | 2026-08-11 | AUSTIN | 8505 CASPIAN DR | Express: WUI ZONE C reroofing with Class A Fire Roofing Material - Owens Corning Duration shingles and OC underlayment Mesh in ventilation. | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-08-10 | AUSTIN | 6412 KING GEORGE DR | Express: of decking on roof Replace shingle; Replace HVAC system | $1 | Saul Vela | finaled |
| 40 | roofing | 2026-08-10 | AUSTIN | 12416 ALCANZA DR | Express: WUI ZONE C reroofing with Class A Fire Roofing Material - Owens Corning shingles and OC underlyament Mesh in ventilation | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-08-07 | AUSTIN | 4010 SPEEDWAY BLDG B | Express- replace roof shingles and repair roof decking replacing windows like for like. | $1 | Corina Elegba | finaled |
| 40 | roofing | 2026-08-07 | AUSTIN | 4807 PROCK LN BLDG 2 | Power for Sauna *Location is in backyard of Building 2 Plan attached of location Roof Dimensions: 88 x 82 Cabin Dimensions Exterior Height: 88 Exterior Width: 72 Exterior Depth: 61.5 Interior Product Dimensions Interior Height: 73 Interior Width: 68 Interior Depth: 57 Product Weight: 401 | Adrian Martinez-Barron | finaled | |
| 40 | roofing | 2026-08-07 | AUSTIN | 4010 SPEEDWAY BLDG A | Express- Patch stucco siding replace roof shingles repair roof decking replace appliances and ac replace windows like for like. | $1 | Corina Elegba | finaled |
| 40 | roofing | 2026-08-06 | AUSTIN | 2910 E 5TH ST | Removal of thirteen corroded steel trusses. The existing roof will need to be removed to decommission the corroded steel trusses. Installation of thirteen new steel trusses with an Epoxy Novolac Coating to protect it from water chemical soaps and moisture. The new roof will transition with the existing roof construction aligned with existing parapet walls and maintain a weathertight building envelope. | Patrick Carter | active | |
| 40 | roofing | 2026-08-04 | AUSTIN | 3207 BRUCE DR | Express: Re roof and re deck | $1 | Jason McCombs | finaled |
| 40 | roofing | 2026-08-04 | AUSTIN | 12305 ABNEY DR | Express: Re-roofing (located in WUI) | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-08-03 | AUSTIN | 12809 N FM 620 RD NB | Simple Re-Roof. Existing retail. | Jaleel Natour | finaled | |
| 40 | roofing | 2026-08-03 | AUSTIN | 6406 OLD BURLESON RD | Simple Re-Roof. Existing office. | Jaleel Natour | finaled | |
| 40 | roofing | 2026-08-03 | AUSTIN | 10416 WALPOLE LN | EXPRESS: Re roofing project. No major roof decking will be altered. Installing new roof asphalt shingles | $1 | Jay Martinez | finaled |
| 40 | roofing | 2026-07-30 | AUSTIN | 11424 VIRIDIAN WAY | Express- WUI Zone C reroofing with Class A fire roofing materials - Owens Corning Duration Shingles and OC underlayment. Mesh in ventilation. | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-07-30 | AUSTIN | 9508 CHINA ROSE DR | Express: Re roof | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-07-29 | AUSTIN | 2623 W 45TH ST | Reconfigure main bedroom suite. Main bathroom and laundry relocated. Interior walls to be removed and supporting beams installed to support joist and roof structure. New windows in areas remodeled and new front door and patio door in area remodeled. Not same for same. retroactively permit garage conversion | Richard Shields | active | |
| 40 | roofing | 2026-07-29 | AUSTIN | 3633 NORTH HILLS DR | RE-ROOF. TPO OVERLAY | Harold Peterson | finaled | |
| 40 | roofing | 2026-07-29 | AUSTIN | 2701 MOUNTAIN LAUREL LN | Rear covered patio addition with a galvanized steel roof (270 sqft) | $1 | Joshua Bucio | active |
| 40 | roofing | 2026-07-29 | AUSTIN | 601 RIO GRANDE ST UNIT 300 | ePlan: Commercial Expedited Review - Exterior Remodel of an Existing Pool Bar Area and Addition of New Roof Area Over Two Portions of Level 3 (16000 SF) | Gary A Pritchard | active | |
| 40 | roofing | 2026-07-29 | AUSTIN | 1715 W CESAR CHAVEZ ST | ePlan: Commercial Expedited Review - [PUBLIC PROJECT] Interior Remodel to Austin High School. Roof Recovering at Theater Building. (396761 SF). | Michael Bradby | active | |
| 40 | roofing | 2026-07-27 | AUSTIN | 13212 N LAMAR BLVD | Remodel of restrooms on the first and second levels; new window openings in the existing exterior walls at weight room; new roof top skylights lighting and acoustical tiles at corridor north of competition gym | Belinda Payne | active | |
| 40 | roofing | 2026-07-27 | AUSTIN | 1607 NUECES ST | RE-ROOF - remove old metal roof install new metal one | Roman Aujon | active | |
| 40 | roofing | 2026-07-27 | AUSTIN | 5406 EVANS AVE | Express- replace existing metal roof with new standing seam metal roof. Decking will be replaced as a part of the project that necessitates permitting. | $1 | Ben Fuller | active |
| 40 | roofing | 2026-07-24 | AUSTIN | 3717 KANDY DR | Express: WUI zone C reroofing with class A fire roofing material- Owens Coming Duration shingles and OC Underlayment. | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-07-22 | AUSTIN | 9717 E US 290 HWY SVRD EB | ETJ Installing 101.75 kW Solar System with 185 ALEXUS ALEX-550-W-144-S Solar Panels and 2 SCA50KTL-DO/US-480 inverters on a commercial building roof. Disconnect/Reconnect + Upgrading main service* | Ortiz Moses | active | |
| 40 | roofing | 2026-07-20 | AUSTIN | 902 RIO GRANDE ST | Re-Roof | Sandra Penick | finaled | |
| 40 | roofing | 2026-07-20 | AUSTIN | 3404 WINDSOR RD | Interior remodel Remodel of upper level beds vault existing ceiling to underside of roof structure remodel of baths and adding 3rd plumbing work (full scope attached) | Matthew Archer | finaled |