40solar2026-05-06AUSTIN1000 E 41ST STInstall new 100.00 KWDC Rooftop solar system servicing existing commercial.RON PHIPPSactive
40solar2026-05-06AUSTIN13102 GEARY DRInstallation of a 8.2 solar panels system with Panel Q. PEAK DUO BLK ML-G10.C+ 410W (x20) (20) Enphase IQ8HC DomesticLogan Stonefinaled
40solar2026-05-05AUSTIN12513 ENCHANTED FOREST DRREQUEST TO DISCONNECT. Installing a 26.136 kW PV system and (2) Tesla Inc. 1707000-XX-Y inverters/batteries.Michael Solanofinaled
40solar2026-05-05AUSTIN7301 TRACE CHAIN DRHafezizadeh-Kelbaugh - 39-49689 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps. underground wire pullMark Bedellactive
40solar2026-05-05AUSTIN508 SOUTH PARK DR1.Replacing an interior sub panel with new one. 2. Replace two kitchen outlets with GFCI 3.install 5 battery smoke detectors 4. Replace three outlets and install GFCI breakers for non grounding circuitry *Per City Of Austin GO replair program we need inspections.Christian Jimenezfinaled
40solar2026-05-04AUSTIN4112 MEDICAL PKWYRooftop Solar with Line Side Tap Interconnection.Mark Pridefinaled
40solar2026-04-30AUSTIN5908 MOUNTAINCLIMB DRPrewire for SolarMark Pridefinaled
40solar2026-04-30AUSTIN11308 MONET DRInstalling 9.68 kW DC solar with ESS PECMark Pridefinaled
40solar2026-04-30AUSTIN6201 HIGHLAND HILLS DR**REQUEST TO DISCONNECT** We will conduct a service upgrade from a 150amp meter can to a 200amp meter can as there is a 200 amp main panel currently installed. This permit is linked to permit # 2026-052525 EP as we are also installing a 9.90KW solar system.Genaro Brionesfinaled
40solar2026-04-29AUSTIN6805 WEST COURTYARD DRPrewire for 18.48 kW DC solar systemMark Pridefinaled
40solar2026-04-27AUSTIN3101 FOXTON CVMahoney - 39-62289 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 125 Amp Main Breaker. Upgrading revenue meter toMark Bedellfinaled
40solar2026-04-27AUSTIN1141 CHICON ST BLDG 2QT - Rooftop Solar. No battery or energy storage. Line side tap interconnection Aux EP needed. Remodel EP not needed. Existing multi family - OVAJeff Bendallactive
40solar2026-04-27AUSTIN3101 FOXTON CVMahoney - 39-62289 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 125 Amp Main Breaker. Upgrading revenue meter to 200 Amps.Mark Bedellfinaled
40solar2026-04-22AUSTIN1200 BRUS BNDDisconnect and reconnect meter to install battery backup. Install new main service disconnect. Aux Electrical Permit # 2026-047904 EPMartin Rodriguezfinaled
40solar2026-04-22AUSTIN1703 CLIFFSIDE DRBackup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job compleMartin Rodriguezactive
40solar2026-04-22AUSTIN701 LITTLE OAK DRZappen 39-58964 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _200__ Main Breaker Upgrading revenue meter to 2Mark Bedellfinaled
40solar2026-04-22AUSTIN1703 CLIFFSIDE DRDisconnect and reconnect meter to install battery backup. Aux Electrical Permit # 2026-048492 EPMartin Rodriguezfinaled
40solar2026-04-22AUSTIN1907 TRAVIS HEIGHTS BLVDDisconnect and reconnect meter to install battery backup. Aux Electrical Permit # 2026-041437 EPMartin Rodriguezfinaled
40solar2026-04-22AUSTIN900 SPRINGDALE RDInstall a pergola with solar panels attached to the topJeffrey Shedactive
40solar2026-04-22AUSTIN701 LITTLE OAK DRZappen 39-58964 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _200__ Main Breaker Upgrading revenue meter to 200 Amps ONLY.Mark Bedellfinaled
40solar2026-04-22AUSTIN1703 CLIFFSIDE DRBackup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job completion.Martin Rodriguezactive
40solar2026-04-21AUSTIN1311 ALTA VISTA AVE BLDG AThis is for a battery backup system with automatic transfer switch.Martin Rodriguezactive
40solar2026-04-21AUSTIN1141 CHICON ST BLDG 3Rooftop solar. No battery energy storage. Lineside tap interconnection. Aux EP needed. Remodel EP not needed. Multifamily Affordable Housing.Jeff Bendallactive
40solar2026-04-20AUSTIN7300 COOPER LNiNSTALL SOLAR FOR EXISTING RESIDENCEChristopher Cibulkaactive
40solar2026-04-20AUSTIN7300 COOPER LNRebuilding electrical service to current code for solar meter interconnectChristopher Cibulkafinaled
40solar2026-04-20AUSTIN12904 DEBARR DRHorne - 39-56969 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200amp Main Breaker. Upgrading revenue meter to 20Mark Bedellfinaled
40solar2026-04-20AUSTIN6510 MIDDLEHAM PLPrice 39-59708 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading subpanel and revenueMark Bedellfinaled
40solar2026-04-20AUSTIN12904 DEBARR DRHorne - 39-56969 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200amp Main Breaker. Upgrading revenue meter to 200 Amps.Mark Bedellfinaled
40solar2026-04-20AUSTIN6510 MIDDLEHAM PLPrice 39-59708 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading subpanel and revenue meter to 200 Amps.Mark Bedellfinaled
40solar2026-04-17AUSTIN10610 SIERRA OAKSDisconnect and reconnect meter to install battery backup. Aux Electrical Permit #: 2026-043420 EPMartin Rodriguezfinaled
40solar2026-04-17AUSTIN3201 CATALINA DRInstalling (1) Tesla PW3 Battery and a Main Panel Upgrade (SPAN).Michael Solanofinaled
40solar2026-04-16AUSTIN3301 DOLPHIN CV UNIT 2Prewire for SolarMark Pridefinaled
40solar2026-04-16AUSTIN8304 JANCY DRGeneral work on existing solar system. No other work being performed.Chadwyck Preeceactive
40solar2026-04-15AUSTIN6623 GREENSBORO DRPennick 39-48486 - Disconnect/reconnect power to move rev meter up to minimum required height. We will tie in PV component to existing MSP _200__ AmpMark Bedellfinaled
40solar2026-04-15AUSTIN6623 GREENSBORO DRPennick 39-48486 - Disconnect/reconnect power to move rev meter up to minimum required height. We will tie in PV component to existing MSP _200__ Amps. _200__ Main Breaker only.Mark Bedellfinaled
40solar2026-04-13AUSTIN10610 SIERRA OAKSBackup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job compleMartin Rodriguezactive
40solar2026-04-13AUSTIN10610 SIERRA OAKSBackup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job completion.Martin Rodriguezactive
40solar2026-04-10AUSTIN1907 TRAVIS HEIGHTS BLVDBackup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job compleMartin Rodriguezactive
40solar2026-04-10AUSTIN2400 TRAIL OF MADRONESWe want to install a Battery at this residence. We will be installing downstream of main service disconnect.Martin Rodriguezactive
40solar2026-04-10AUSTIN1907 TRAVIS HEIGHTS BLVDBackup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job completion.Martin Rodriguezactive
40solar2026-04-08AUSTIN704 FORT CHADBOURNE DRREQUEST TO DISCONNECT - Davis/Gonzales 39-52582 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main BreakeMark Bedellfinaled
40solar2026-04-08AUSTIN8104 PARKDALE DRLyon - 39-53920 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 Main Breaker. Upgrading revenue meter to 200 AmMark Bedellfinaled
40solar2026-04-08AUSTIN5703 BOULDER CREEKREQUEST TO DISCONNECT - Gillespie 39-53602 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 Main Breaker.Mark Bedellfinaled
40solar2026-04-08AUSTIN8104 PARKDALE DRLyon - 39-53920 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 Main Breaker. Upgrading revenue meter to 200 Amps full service upgrade for the meter the subpanel and the meter.Mark Bedellfinaled
40solar2026-04-08AUSTIN704 FORT CHADBOURNE DRREQUEST TO DISCONNECT - Davis/Gonzales 39-52582 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker.Mark Bedellfinaled
40solar2026-04-07AUSTIN8301 JOHNNY MORRIS RDInstallation of 368.16 kW rooftop PV systemChadwyck Preeceactive
40solar2026-04-07AUSTIN8301 JOHNNY MORRIS RDInstallation of 247.24 kW rooftop PV systemChadwyck Preeceactive
40solar2026-04-07AUSTIN8301 JOHNNY MORRIS RDInstallation of 198.24 kW rooftop PV systemChadwyck Preeceactive
40solar2026-04-07AUSTIN8301 JOHNNY MORRIS RDINstallation of 331.58 kW rooftop PV systemChadwyck Preeceactive
40solar2026-04-07AUSTIN3005 WESTLAKE DRExpress- Rooftop solar panels tilted up (not aligned with roof plane). Aux Power permit 2024-126200 EP (No PV at the request of the applicant).$1Jeff Bendallfinaled
40solar2026-04-07AUSTIN1304 W OLTORF STInstallation of 29.10 KW Rooftop PV System for Existing Office/WarehouseChadwyck Preeceactive
40solar2026-04-06AUSTIN8904 TRONEWOOD DRInstallation new 4.4kw solar DC system with new 11.92kwh energy storage system . Installation new 125A Service sub panelMark Barylskiactive
40solar2026-04-06AUSTIN12513 ENCHANTED FOREST DRREQUEST TO DISCONNECT. Installing a 26.136 kW PV system and (2) Tesla Inc. 1707000-XX-Y inverters/batteries.Michael Solanofinaled
40solar2026-04-02AUSTIN10205 VAQUERO TRLInstallation of 7.6kw PV Solar system.Michael Novakfinaled
40solar2026-04-02AUSTIN741 DALTON LNInstallation of 60.72 kW solar panel system on existing metal structure. I was instructed by commercial permit review to file for an AUX permit for thRobert Krousactive
40solar2026-04-02AUSTIN741 DALTON LNInstallation of 60.72 kW solar panel system on existing metal structure. I was instructed by commercial permit review to file for an AUX permit for this project as it is located in the Austin 2 mile ETJ and is outside their jurisdiction.Robert Krousactive
40solar2026-03-26AUSTIN2904 MONTEBELLO CTReplace a 200 amp breaker to a 150 amp main breaker per the solar inspector and possibly a new meter can NO OTHER WORK this job has previous passed fiEduardo Martellfinaled
40solar2026-03-26AUSTIN2904 MONTEBELLO CTReplace a 200 amp breaker to a 150 amp main breaker per the solar inspector and possibly a new meter can NO OTHER WORK this job has previous passed final inspection Austin energy solar inspector requested lowing the 200 amp to a 150 amp breaker in the outside main electrical service.Eduardo Martellfinaled
40solar2026-03-25AUSTIN3106 E 14TH HALF STSolar panels for existing church. No Meter review needed.Lavelle Chandleractive
40solar2026-03-25AUSTIN3106 E 14TH HALF STSolar panels for existing church. No Meter review needed. This project is being installed for the following AE Account + UNIT # (even though the addrLavelle Chandleractive
40solar2026-03-18AUSTIN11700 COYOTE CALL WAYWe plan to install 4.840 KW DC ROOF MOUNT SOLAR PV SYSTEM WITH 11 - HYUNDAI SOLAR: HiS-T440NF(BK) 440W PV MODULES WITH 11 - ENPHASE IQ8A-72-2-US 349WPhillip Thompsonfinaled
40solar2026-03-18AUSTIN11700 COYOTE CALL WAYWe plan to install 4.840 KW DC ROOF MOUNT SOLAR PV SYSTEM WITH 11 - HYUNDAI SOLAR: HiS-T440NF(BK) 440W PV MODULES WITH 11 - ENPHASE IQ8A-72-2-US 349W MICRO INVERTERS EQUIPPED WITH RAPID SHUTDOWNPhillip Thompsonfinaled
40solar2026-03-17AUSTIN14620 LAKE VICTOR DRROOFTOP SOLAR WITH BACKUP BATTERY ONCOR EnergyPaul Joycefinaled
40solar2026-03-12AUSTIN5717 MC CARTY LNInstallation of 8.8kW Solar PV SystemMichael Novakfinaled
40solar2026-03-11AUSTIN6601 ROTAN DRAng 39-38414 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _125__ Main Breaker. Upgrading revenue meter to 200Mark Bedellfinaled
40solar2026-03-11AUSTIN1314 ROCKCLIFF RDInstallation of 33.82 kW roof mounted solar system + 7 Powerwall 3 Batteries + 3 Powerwall 3 Expansions + 2 SPAN PanelsRobert Krousactive
40solar2026-03-11AUSTIN6601 ROTAN DRAng 39-38414 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _125__ Main Breaker. Upgrading revenue meter to 200 Amps ONLY.Mark Bedellfinaled
40solar2026-03-10AUSTIN9928 THANE WAYInstallation of Roof Mounted 9.03kW Solar System. 21x SEG 430 Panels & 1x Tesla Powerwall 3.William Johnsonfinaled
40solar2026-03-06AUSTIN3106 E 14TH HALF STSolar panels for existing church.Lavelle Chandleractive
40solar2026-03-06AUSTIN6308 TOSCANA AVEDisconnect and reconnect meter to install battery backup system Ref: AUX 2026-023493 EPMartin Rodriguezfinaled
40solar2026-03-05AUSTIN6308 TOSCANA AVEWe want to install a Battery at this residence.Martin Rodriguezactive
40solar2026-03-05AUSTIN8100 TIFFANY DRDay 39-39387 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _125__ Amps. _125__ Main Breaker. Upgrading revenue meter to 20Mark Bedellfinaled
40solar2026-03-05AUSTIN8100 TIFFANY DRDay 39-39387 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _125__ Amps. _125__ Main Breaker. Upgrading revenue meter to 200 Amps ONLY.Mark Bedellfinaled
40solar2026-03-03AUSTIN9600 ANGELWYLDE DRInstall roof-mounted solar system: TOTAL INSTALL; 38.92kW - 92x RUNERGY 410w PV Modules (HY-DH108P8) with 6x Savant Power Inverters (PS-INV 12.5kW-100RICKEY YATESactive
40solar2026-03-03AUSTIN6803 BREEZY HILL DRThe previous contractor for the PV system that was installed never pulled a permit and the system was never commissioned. We are making corrections toJEREMIE BRANTONactive
40solar2026-03-03AUSTIN9600 ANGELWYLDE DRInstall roof-mounted solar system: TOTAL INSTALL; 38.92kW - 92x RUNERGY 410w PV Modules (HY-DH108P8) with 6x Savant Power Inverters (PS-INV 12.5kW-100a) and 6x Savant Power Storage Batteries (PS20-BATT-20kW-ENCL) and 92x Rapid Shutdown APSMART RSD-S-PLC devicesRICKEY YATESactive
40solar2026-03-03AUSTIN6803 BREEZY HILL DRThe previous contractor for the PV system that was installed never pulled a permit and the system was never commissioned. We are making corrections to their installation and then will need to have inspections.JEREMIE BRANTONactive
40solar2026-02-26AUSTIN9604 ANGELWYLDE DRInstall roof-mounted solar system: 49.61kW - 121x RUNERGY 410w PV Modules (HY-DH108P8) with 4x Savant Power Inverters (PS-INV-12.5kW-100a) and 2x SavaRICKEY YATESactive
40solar2026-02-26AUSTIN9604 ANGELWYLDE DRInstall roof-mounted solar system: 49.61kW - 121x RUNERGY 410w PV Modules (HY-DH108P8) with 4x Savant Power Inverters (PS-INV-12.5kW-100a) and 2x Savant Power Storage Batteries (PS20-BATT-20kW-ENCL) and 121x Rapid Shutdown APSMART RSD-S-PLC devicesRICKEY YATESactive
40solar2026-02-25AUSTIN8005 BRAMBLE BUSH DRREQUEST TO DISCONNECT - Dilworth - 39-37629 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 125 amp Main Breaker.Mark Bedellfinaled
40solar2026-02-25AUSTIN12513 ENCHANTED FOREST DRInstalling a 26.136 kW PV system and (2) Tesla Inc. 1707000-XX-Y inverters/batteries.Michael Solanofinaled
40solar2026-02-25AUSTIN1304 W OLTORF STInstallation of 29.10 KW Rooftop PV System for Existing Office/WarehouseChadwyck Preeceactive
40solar2026-02-23AUSTIN916 FALKLAND TRCEROOFTOP SOLAR WITH BACKUP BATTERY ONCOR EnergyPaul Joycefinaled
40solar2026-02-23AUSTIN3106 E 14TH HALF STSolar panels for existing church.Lee Brandyactive
40solar2026-02-18AUSTIN1910 CYPRESS POINT WESTInstallation of 23.3kw PV Solar SystemMichael Novakactive
40solar2026-02-18AUSTIN5510 BRADFORD PEAR LNDisconnect/reconnect to tie in PV/ESS components. We are not upgrading the size of the service not upgrading the meter sizeAdrian Buckfinaled
40solar2026-02-17AUSTIN8227 N LAMAR BLVDInstalling 90.2 kW Solar System with 164 ALEX-550-W panels 1 SCA50KTL-DO and 1 SCA25KTL-DO Inverters.Ortiz Mosesactive
40solar2026-02-16AUSTIN6109 LOST HORIZON DRInstallation of 8.12kw Solar PV System with Battery Backup.Michael Novakfinaled
40solar2026-02-13AUSTIN9015 COLLINFIELD DRInstall 14.000 KWDC roof mounted solar pv system.John Coyleactive
40solar2026-02-10AUSTIN1129 GILLESPIE PLThe team will be wiring the meter to the battery and the battery to the main panel.Oscar Escamillafinaled
40solar2026-02-10AUSTIN3301 FAR VIEW DRInstallation of 30.600 DC ground mounted solar system with 2 tesla powerwall 3s (1608 sqft)Chadwyck Preecefinaled
40solar2026-02-09AUSTIN11407 JANUARY DRChance - 39-31962 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 Amp Main Breaker. Upgrading revenue meter toMark Bedellfinaled
40solar2026-02-09AUSTIN11407 JANUARY DRChance - 39-31962 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 Amp Main Breaker. Upgrading revenue meter to 200 Amps. Replacing rag riser Full Service upgrade MPU meter riser and weatherhead only.Mark Bedellfinaled
40solar2026-02-05AUSTIN9989 E US 290 HWY SVRD EBInstallation of 149.38kw rooftop PV system.Chadwyck Preeceactive
40solar2026-02-04AUSTIN3301 FAR VIEW DRInstallation of 30.600 DC ground mounted solar system with 2 tesla powerwall 3s (1608 sqft)$0Chadwyck Preeceactive
40solar2026-02-04AUSTIN9701 COTTLE DRREQUEST TO DISCONNECT - KOSH 39-33581 - DISCONNECT/RECONNECT POWER TO TIE IN PV COMPONENT AND UPGRADING MSP TO 200AMP 200AMP MAIN BREAKER ONLY.Mark Bedellfinaled
40solar2026-02-04AUSTIN3301 FAR VIEW DRInstallation of 30.600 DC ground mounted solar system with 2 tesla powerwall 3s (1608 sqft)Adrian Buckfinaled
40solar2026-02-03AUSTIN7300 ANAQUA DRWill be installing (1) TESLA INC. 1807000-XX-Y. The customer has an existing system that consists of (18) MISSION SOLAR ENERGY LLC MSX10-435HN0B panelMichael Solanoactive
40solar2026-02-03AUSTIN7300 ANAQUA DRWill be installing (1) TESLA INC. 1807000-XX-Y. The customer has an existing system that consists of (18) MISSION SOLAR ENERGY LLC MSX10-435HN0B panels and (1) TESLA INC. 1707000-XX-Y inverter/battery.Michael Solanoactive
40solar2026-01-30AUSTIN1704 CAMINO VIEJOInstallation of 14.72kw Solar PV system with Battery Backup.Michael Novakfinaled