Permits
2,751 permits • page 11 of 28
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 45 | roofing | 2024-07-03 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | David Demoss | finaled | |
| 45 | roofing | 2024-06-17 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | $1 | Cameron Treme | finaled |
| 45 | roofing | 2024-06-11 | AUSTIN | 3811 AIRPORT BLVD | Replacement of TPO roof system. New system to meet IECC minimum requirements of R-25. | Steven Sartory | finaled | |
| 45 | roofing | 2024-05-28 | AUSTIN | 6205 BURNET RD | Replace existing TPO membrane from hail damage april 9 2024. Remove existing .60 mil. TPO and replace with new .60 mil. TPO using TPO bonding adhesive | Daniel McCoy | finaled | |
| 40 | roofing | 2026-07-30 | AUSTIN | 11424 VIRIDIAN WAY | Express- WUI Zone C reroofing with Class A fire roofing materials - Owens Corning Duration Shingles and OC underlayment. Mesh in ventilation. | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-07-30 | AUSTIN | 9508 CHINA ROSE DR | Express: Re roof | $1 | Fareed Tulbah | active |
| 40 | roofing | 2026-07-29 | AUSTIN | 2623 W 45TH ST | Reconfigure main bedroom suite. Main bathroom and laundry relocated. Interior walls to be removed and supporting beams installed to support joist and roof structure. New windows in areas remodeled and new front door and patio door in area remodeled. Not same for same. retroactively permit garage conversion | Richard Shields | active | |
| 40 | roofing | 2026-07-29 | AUSTIN | 3633 NORTH HILLS DR | RE-ROOF. TPO OVERLAY | Harold Peterson | finaled | |
| 40 | roofing | 2026-07-29 | AUSTIN | 2701 MOUNTAIN LAUREL LN | Rear covered patio addition with a galvanized steel roof (270 sqft) | $1 | Joshua Bucio | active |
| 40 | roofing | 2026-07-29 | AUSTIN | 601 RIO GRANDE ST UNIT 300 | ePlan: Commercial Expedited Review - Exterior Remodel of an Existing Pool Bar Area and Addition of New Roof Area Over Two Portions of Level 3 (16000 SF) | Gary A Pritchard | active | |
| 40 | roofing | 2026-07-29 | AUSTIN | 1715 W CESAR CHAVEZ ST | ePlan: Commercial Expedited Review - [PUBLIC PROJECT] Interior Remodel to Austin High School. Roof Recovering at Theater Building. (396761 SF). | Michael Bradby | active | |
| 40 | roofing | 2026-07-27 | AUSTIN | 13212 N LAMAR BLVD | Remodel of restrooms on the first and second levels; new window openings in the existing exterior walls at weight room; new roof top skylights lighting and acoustical tiles at corridor north of competition gym | Belinda Payne | active | |
| 40 | roofing | 2026-07-27 | AUSTIN | 1607 NUECES ST | RE-ROOF - remove old metal roof install new metal one | Roman Aujon | active | |
| 40 | roofing | 2026-07-27 | AUSTIN | 5406 EVANS AVE | Express- replace existing metal roof with new standing seam metal roof. Decking will be replaced as a part of the project that necessitates permitting. | $1 | Ben Fuller | active |
| 40 | roofing | 2026-07-26 | AUSTIN | 1109 FIELDCREST DR | Relocate tub to where the toilet currently is and move toilet to where the tub was. Install shower valve. Run hot line from lavatory. Kill hot line to tub at manifold. Roll cold copper line into slab for commode. Run commode vent to another vent or through roof. | Cody Turner | active | |
| 40 | roofing | 2026-07-24 | AUSTIN | 3717 KANDY DR | Express: WUI zone C reroofing with class A fire roofing material- Owens Coming Duration shingles and OC Underlayment. | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-07-22 | AUSTIN | 9717 E US 290 HWY SVRD EB | ETJ Installing 101.75 kW Solar System with 185 ALEXUS ALEX-550-W-144-S Solar Panels and 2 SCA50KTL-DO/US-480 inverters on a commercial building roof. Disconnect/Reconnect + Upgrading main service* | Ortiz Moses | active | |
| 40 | roofing | 2026-07-20 | AUSTIN | 902 RIO GRANDE ST | Re-Roof | Sandra Penick | finaled | |
| 40 | roofing | 2026-07-20 | AUSTIN | 3404 WINDSOR RD | Interior remodel Remodel of upper level beds vault existing ceiling to underside of roof structure remodel of baths and adding 3rd plumbing work (full scope attached) | Matthew Archer | active | |
| 40 | roofing | 2026-07-16 | AUSTIN | 1025 BARTON SPRINGS RD | RE ROOF overlay existing modified with coating using new .6mil tpo. mechanically fastened at existing restaurant - OVA | Daniel McCoy | active | |
| 40 | roofing | 2026-07-16 | AUSTIN | 8204 BURNT CIR | Express: Re-roofing | $1 | Priyanka Bharath | finaled |
| 40 | roofing | 2026-07-15 | AUSTIN | 3604 LUCAS DR | INTERIOR plumbing updates Structural wall modifications to accommodate a new floor plan Minor exterior framing adjustments at the front entry New roof installation to decking | HERIDO MORALES | active | |
| 40 | roofing | 2026-07-15 | AUSTIN | 3604 LUCAS DR | INTERIOR plumbing updates Structural wall modifications to accommodate a new floor plan Minor exterior framing adjustments at the front entry New roof installation to decking | Miguel Vargas | active | |
| 40 | roofing | 2026-07-14 | AUSTIN | 12113 METRIC BLVD BLDG 9 | Re-Roof for Building 9. | Russ Melbye | active | |
| 40 | roofing | 2026-07-14 | AUSTIN | 2412 LOYOLA LN | Express: Re-roofing (located in WUI) | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-07-13 | AUSTIN | 7103 MONTANA NORTE | Request to disconnect and Reconnect. TruTec will be upgrading exalting services to 200 amp service grounding system meter base and proper surge protection. Raising riser up to raise device wire off of roof and provide proper clearance. | Daniel Perez | active | |
| 40 | roofing | 2026-07-13 | AUSTIN | 3604 LUCAS DR | INTERIOR plumbing updates Structural wall modifications to accommodate a new floor plan Minor exterior framing adjustments at the front entry New roof installation to decking | Lucas Civita | active | |
| 40 | roofing | 2026-07-10 | AUSTIN | 1034 LIBERTY PARK DR | re-roof at existing senior living facility main building | JRC INC | active | |
| 40 | roofing | 2026-07-09 | AUSTIN | 5609 PORSCHE LN | Demolish existing detached metal carport and construct new attached 2 car garage conditioned hallway and connection and covered entry with new slab/foundation framing roofing exterior finishes electrical | $1 | Mohammad Zarbaf | active |
| 40 | roofing | 2026-07-08 | AUSTIN | 2101 E ST ELMO RD BLDG 1 UNIT 150 | Addition of exterior concrete enclosure with roof to store flammable gases in the truck court. | JJ Gomez | finaled | |
| 40 | roofing | 2026-07-08 | AUSTIN | 13212 N LAMAR BLVD | Remodel of restrooms on the first and second levels; new window openings in the existing exterior walls at weight room; new roof top skylights lighting and acoustical tiles at corridor north of competition gym | John Robinson | active | |
| 40 | roofing | 2026-07-08 | AUSTIN | 3604 LUCAS DR | INTERIOR plumbing updates Structural wall modifications to accommodate a new floor plan Minor exterior framing adjustments at the front entry New roof installation to decking | $1 | Ruhaab Markas | active |
| 40 | roofing | 2026-07-07 | AUSTIN | 11036 ARROYO CANYON DR | Installation of 42.275 kW roof mounted solar system + 2 PW3s + 1 PW3 Expansion Pack | Joungho Choi | active | |
| 40 | roofing | 2026-07-06 | AUSTIN | 10109 BRODIE LN | Express: Re-roofing repair bad decking and fascia where necessary. Replace drip edge | $1 | Michael Guiney | active |
| 40 | roofing | 2026-07-03 | AUSTIN | 3404 WINDSOR RD | Interior remodel Remodel of upper level beds vault existing ceiling to underside of roof structure remodel of baths and adding 3rd plumbing work (full scope attached) | Sam E Eskew | active | |
| 40 | roofing | 2026-07-01 | AUSTIN | 3207 NORTHEAST DR | Express: Re-roofing (located in WUI) | $1 | Chris Haywood | active |
| 40 | roofing | 2026-07-01 | AUSTIN | 5811 TECHNI CENTER DR UNIT 200 | Install of new structural steel members Replace broken tilt wall panels Repair TPO Roof. | Kyle Hogg | active | |
| 40 | roofing | 2026-06-30 | AUSTIN | 611 S CONGRESS AVE | Demo roof mechanical existing condensing unit and associated refrigerant piping. Prepare roof penetrations for new piping. Install new curbed outside air intake and install condensing unit. install new exhaust fan Existing office building. | Mark McDonald | active | |
| 40 | roofing | 2026-06-30 | AUSTIN | 6306 CRAIGWOOD CIR | Express- Remove and replace roof with similar type material | $1 | Jessica Plata | active |
| 40 | roofing | 2026-06-30 | AUSTIN | 10508 MC MILLIAN DR | Express: Replace existing roof with metal roof and repair or replace any damaged eaves or facings | $1 | Kern Thwing | active |
| 40 | roofing | 2026-06-30 | AUSTIN | 1210 SAN ANTONIO ST | Reroof - Reinstall the pavers and pedestals using a slip sheet of HP Protective Mat or a sacrificial layer of TPO membrane. | Molly Johnston | active | |
| 40 | roofing | 2026-06-30 | AUSTIN | 1405 WHEATFALL LN | Express: Re-roofing (Located in WUI) | $1 | Nicole Christofilis | finaled |
| 40 | roofing | 2026-06-30 | AUSTIN | 4001 CAMPO VIEJO CV | New 1-story detached accessory structure (pool side cabana) 1 bath with stone veneer flat TPO roof wood frame on drilled concrete caissons. Cabana includes bathroom (shower + WC). Reconnect to existing underground electrical conduit previously servicing pergola. Install new 60 amp subpanel in cabana. One dedicated circuit for 1-ton ductless mini-split (230v) | $0 | Juan Gonzalez | active |
| 40 | roofing | 2026-06-29 | AUSTIN | 3015 INDUSTRIAL TER | TPO overlay over existing metal r-panel roof to include new metal trim gutters and downspouts. Existing auto parts store. | Barry Temnick | active | |
| 40 | roofing | 2026-06-29 | AUSTIN | 6008 LADY MILDRED WAY | Installation of roof mounted solar system 6.2kW | Logan Stone | finaled | |
| 40 | roofing | 2026-06-29 | AUSTIN | 9204 UNITED DR | Install TPO roofing system over existing metal R-panel roof. No structural modifications. No changes to occupancy use footprint building height or drainage. | Barry Temnick | active | |
| 40 | roofing | 2026-06-29 | AUSTIN | 1712 E 11TH ST | Removal of Existing Roofing System on the Entire School with a new PVC Roofing System. / Removal and disposal of existing mechanical roofing support members. Also work includes replacing of 8 existing skylights/ installed of through wall overflow rains AISD Project | Juan Garcia | finaled | |
| 40 | roofing | 2026-06-28 | AUSTIN | 2306 WILLOW ST | My Client needs the 2 riggid conduit Riser extended higher up 24 the service entrance wires inside the riser need to be extended 24 do to a new slope of the roof addition. Existing 200 amp service remains the same only the service wires and conduit need to extend higher. Contractor needs a disconnect/reconnect | Jose Lucio | finaled | |
| 40 | roofing | 2026-06-25 | AUSTIN | 2419 RIO GRANDE ST | Reroof TPO | Harold Peterson | finaled | |
| 40 | roofing | 2026-06-25 | AUSTIN | 7813 NORTHWEST DR | Replace roof shingles with new shingles and replace fascia and any bad decking as needed. | $1 | Charles Bertero | finaled |
| 40 | roofing | 2026-06-23 | AUSTIN | 13209 HYMEADOW CIR | Detach and Reset of Existing Solar System for Re-Roof. | Lucas Starbuck | active | |
| 40 | roofing | 2026-06-23 | AUSTIN | 10701 LAMBERT CIR | Express: Re-roofing - material change (asphalt shingles to metal) | $1 | Stacie Feller | finaled |
| 40 | roofing | 2026-06-23 | AUSTIN | 13377 POND SPRINGS RD | Remove existing roof down to deck install 4.4 inch of new insulation and .60 Mil TPO | Robert Ward | finaled | |
| 40 | roofing | 2026-06-23 | AUSTIN | 10600 LONDONSHIRE LN | Express: WUI zone c reroofing with Class A fire roofing material- owens corning duration shingles and OC underlayment mesh in ventilation | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-06-23 | AUSTIN | 7806 LAKEWOOD DR | Express: Re-roofing (located in WUI) | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-06-22 | AUSTIN | 2700 MOUNTAIN LAUREL LN | Express: reroof | $1 | Frank Rendon | active |
| 40 | roofing | 2026-06-22 | AUSTIN | 6028 SIGNAL PT | Express: Re-roofing (located in WUI) | $1 | Antonio Gonzalez | active |
| 40 | roofing | 2026-06-22 | AUSTIN | 3404 WINDSOR RD | Interior remodel Remodel of upper level beds vault existing ceiling to underside of roof structure remodel of baths and adding 3rd plumbing work (full scope attached) | Matthew Archer | active | |
| 40 | roofing | 2026-06-19 | AUSTIN | 6005 MESA VERDE CIR | Run Ducting and roof vent to an existing microwave appliance | Joseph Trevino | finaled | |
| 40 | roofing | 2026-06-19 | AUSTIN | 601 WILLIAMS ST | TPO Reroof. Existing union hall. | Austin Muth | active | |
| 40 | roofing | 2026-06-19 | AUSTIN | 8502 WALHILL CV | Express: Re-roof - material change (tile to metal) (Located in WUI) Revision: Re-deck. Tear off beginning on Monday 6/22 | $1 | Stacie Feller | finaled |
| 40 | roofing | 2026-06-18 | AUSTIN | 4201 SUPPLY CT | re roof | Jaleel Natour | finaled | |
| 40 | roofing | 2026-06-17 | AUSTIN | 3404 WINDSOR RD | Interior remodel Remodel of upper level beds vault existing ceiling to underside of roof structure remodel of baths and adding 3rd plumbing work (full scope attached) | $1 | Carlie Blandford | active |
| 40 | roofing | 2026-06-14 | AUSTIN | 1708 ADINA ST | Demo fence carport conc patio slab; Fill in exist. ext door/curb; Replace exist. ext. doors/windows (same size); Replace drywall at w. heater closet; Replace exist. A/C water heater flooring cabinets doors trim/shelving fans switches outlets AC vents tile plumbing fixtures; Add recess lighting. New roof fence | Francisco Casarez | active | |
| 40 | roofing | 2026-06-12 | AUSTIN | 1605 W 11TH ST | Express: Replace siding insulation drywall doors and windows; new electrical new A/C drain line re-roof | Jared Thompson | active | |
| 40 | roofing | 2026-06-12 | AUSTIN | 4301 FARHILLS DR | Demo old upper deck and rebuilding with wui approved materials adding existing unpermitted canopy roof so that it will be properly permitted | $1 | George Barnett | active |
| 40 | roofing | 2026-06-12 | AUSTIN | 300 WESTMORLAND DR | Express - Remove and dispose of existing roof covering and exterior siding. Re-roof 1300sqft using metal roofing over new synthetic underlayment. Re-side 1000 sqft with James Hardie fiber-cement siding over OSB sheathing. Total Project Scope includes like for like exterior weatherproofing with no structural wall relocations or changes to building footprint. | $1 | Jeff Madden | active |
| 40 | roofing | 2026-06-12 | AUSTIN | 1143 SALINA ST | RE-ROOF - re roof existing office building - OVA | Miguel Juarez | active | |
| 40 | roofing | 2026-06-11 | AUSTIN | 4905 BRUSHY RIDGE DR | Express - Replace Decking on roof Replace shingles on roof Replace 6 windows | $1 | Saul Vela | finaled |
| 40 | roofing | 2026-06-11 | AUSTIN | 1708 ADINA ST | Demo fence carport conc patio slab; Fill in exist. ext door/curb; Replace exist. ext. doors/windows (same size); Replace drywall at w. heater closet; Replace exist. A/C water heater flooring cabinets doors trim/shelving fans switches outlets AC vents tile plumbing fixtures; Add recess lighting. New roof fence | Matthew Plante | active | |
| 40 | roofing | 2026-06-10 | AUSTIN | 8311 SPRING VALLEY DR | Express: Remove and replace new roof (not going past decking) | $1 | Victor Rodriguez | finaled |
| 40 | roofing | 2026-06-10 | AUSTIN | 10304 VAN WINKLE CT | Express: Re-roof - asphalt shingle to metal | $1 | Stacie Feller | finaled |
| 40 | roofing | 2026-06-08 | AUSTIN | 1708 ADINA ST | Demo fence carport conc patio slab; Fill in exist. ext door/curb; Replace exist. ext. doors/windows (same size); Replace drywall at w. heater closet; Replace exist. A/C water heater flooring cabinets doors trim/shelving fans switches outlets AC vents tile plumbing fixtures; Add recess lighting. New roof fence | Richard P Rayborn | active | |
| 40 | roofing | 2026-06-05 | AUSTIN | 1509 W 39TH HALF ST | Remove and replace TPO roofing. | Dean Martin | active | |
| 40 | roofing | 2026-06-03 | AUSTIN | 2124 TURTLE MOUNTAIN BND | Express- Remove and replace shingles and remove and replace roof decking | $1 | Maria Marsh | active |
| 40 | roofing | 2026-06-01 | AUSTIN | 3201 WEST AVE | Interior remodel of existing detached 1-story garage to 2 bedroom 2 bath accessory to primary structure; modify the roof to add a roof skylight window. | Darby Spencer | finaled | |
| 40 | roofing | 2026-06-01 | AUSTIN | 3201 WEST AVE | Interior remodel of existing detached 1-story garage to 2 bedroom 2 bath accessory to primary structure; modify the roof to add a roof skylight window. | Kevin Jones | finaled | |
| 40 | roofing | 2026-05-29 | AUSTIN | 2901 VIA FORTUNA BLDG 6 | Simple Re Roof. Existing Office Building. | Jaleel Natour | finaled | |
| 40 | roofing | 2026-05-29 | AUSTIN | 4500 GREYSTONE DR | Express: Replace composite roof with metal roof replacing window for window | $1 | David Williamson | active |
| 40 | roofing | 2026-05-28 | AUSTIN | 3201 WEST AVE | Interior remodel of existing detached 1-story garage to 2 bedroom 2 bath accessory to primary structure; modify the roof to add a roof skylight window. | Darrin Petru | finaled | |
| 40 | roofing | 2026-05-27 | AUSTIN | 709 MERIDEN LN | *partial demo* New exterior stairs replace roof & rear deck interior remodel Notary to be confirmed | HERIDO MORALES | active | |
| 40 | roofing | 2026-05-27 | AUSTIN | 2002 NARROW GLEN PKWY | Express: reroof in WUI | $1 | Marika Little | active |
| 40 | roofing | 2026-05-26 | AUSTIN | 11205 MORNING GLORY TRL | Primary bathroom is to be remodeled w/scope of work to include large shower moving toilet over to accommodate required code clearances and plumbing for and installation of a dual sink vanity. New light fixtures a new bathroom fan and cosmetic upgrades will be made. No structural work to wall or roof is anticipated. | James Garcia | finaled | |
| 40 | roofing | 2026-05-26 | AUSTIN | 3201 WEST AVE | Interior remodel of existing detached 1-story garage to 2 bedroom 2 bath accessory to primary structure; modify the roof to add a roof skylight window. | $1 | Jamie Borkowski | finaled |
| 40 | roofing | 2026-05-22 | AUSTIN | 2113 CROWNSPOINT DR | Express- Replace 320 sq ft of decking on roof and replace roof shingles | $1 | Saul Vela | finaled |
| 40 | roofing | 2026-05-20 | AUSTIN | 3408 MOUNTAIN TOP CIR | Express: Installing Tesla solar roof system | Michael Solano | active | |
| 40 | roofing | 2026-05-20 | AUSTIN | 11312 ROBERT WOODING DR | Express: shingle/felt paper roof repair in WUI | $1 | Mauricio Quintero | finaled |
| 40 | roofing | 2026-05-20 | AUSTIN | 1905 KERR ST | Partial Demolition1-story addition/interior remodel to existing residence. New covered porch new roof new flat work driveway (within property lines) remove brick veneer | Matthew Archer | active | |
| 40 | roofing | 2026-05-20 | AUSTIN | 2623 W 45TH ST | Reconfigure main bedroom suite. Main bathroom and laundry relocated. Interior walls to be removed and supporting beams installed to support joist and roof structure. New windows in areas remodeled and new front door and patio door in area remodeled. Not same for same. retroactively permit garage conversion | Joe Chavez | active | |
| 40 | roofing | 2026-05-18 | AUSTIN | 2901 S CAPITAL OF TEXAS HWY NB | Roof recover. No structural changes. Remove existing roof membrane. Install a Carlisle 135-Mil white TPO Fleeceback membrane over the existing insulation mechanically fastened. | Jarrell Perrin | finaled | |
| 40 | roofing | 2026-05-18 | AUSTIN | 4115 HONEYCOMB ROCK CIR | Addition and remodel: full interior remodel with small interior additions on rear and new covered back porch all new interior finishes and fixtures all new exterior windows doors roofing and siding (except brick) new gas fire place decorative structural changes to front side of roof all new plumbing and electrical. Pool not in scope | Paul O'Brien | active | |
| 40 | roofing | 2026-05-15 | AUSTIN | 3408 MOUNTAIN TOP CIR | Express: Installing Tesla solar roof system | $1 | Michael Solano | active |
| 40 | roofing | 2026-05-15 | AUSTIN | 2505 BRAEMAR CV | Express- RR Reroof Asphalt shingle to shingle. | $1 | TYRONE CARRINGTON | finaled |
| 40 | roofing | 2026-05-15 | AUSTIN | 4504 JINX AVE | Express- remove existing roof and replace with new modified roof that allows a 7 foot max gable height to accommodate new AC unit. This work does not involve changing of the floor structure. HVAC not part of this permit app. | $1 | Trinidad Aleman | active |
| 40 | roofing | 2026-05-15 | AUSTIN | 2623 W 45TH ST | Reconfigure main bedroom suite. Main bathroom and laundry relocated. Interior walls to be removed and supporting beams installed to support joist and roof structure. New windows in areas remodeled and new front door and patio door in area remodeled. Not same for same. retroactively permit garage conversion | Eulalio Torres | active | |
| 40 | roofing | 2026-05-14 | AUSTIN | 1715 W CESAR CHAVEZ ST | ePlan: Commercial Expedited Review - [PUBLIC PROJECT] Interior Remodel to Austin High School. Roof Recovering at Theater Building. (396761 SF). | Weldon Schmidt | active | |
| 40 | roofing | 2026-05-14 | AUSTIN | 2101 E ST ELMO RD BLDG 1 UNIT 150 | Addition of exterior concrete enclosure with roof to store flammable gases in the truck court. | Paul Wagner | active | |
| 40 | roofing | 2026-05-13 | AUSTIN | 6817 VALBURN DR | EXPRESS: Remove and replace existing roof with a .24 gauge standing seam roof system | $1 | Michael Biles | finaled |
| 40 | roofing | 2026-05-13 | AUSTIN | 6809 WILLAMETTE DR | Interior Remodel New electrical system mechanical system paint flooring interior doors plumbing fixtures & cabinets. New exterior paint and asphalt shingle roof. | Dave Gonzalez | active | |
| 40 | roofing | 2026-05-12 | AUSTIN | 1904 E 11TH ST | Express: roof repair down to decking boards | $1 | Kim Boyer | finaled |