PPermitDrop

Permits

2,003 permits • page 10 of 21

Export CSV
ScoreTradeDateCityAddressDescriptionValueContractorStatus
45solar2026-04-16AUSTIN3301 DOLPHIN CV UNIT 2Prewire for SolarMark Pridefinaled
45solar2026-04-16AUSTIN8304 JANCY DRGeneral work on existing solar system. No other work being performed.Adrian Buckactive
45solar2026-04-15AUSTIN6623 GREENSBORO DRPennick 39-48486 - Disconnect/reconnect power to move rev meter up to minimum required height. We will tie in PV component to existing MSP _200__ AmpMark Bedellfinaled
45solar2026-04-13AUSTIN10610 SIERRA OAKSBackup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job compleMartin Rodriguezactive
45solar2026-04-10AUSTIN1907 TRAVIS HEIGHTS BLVDBackup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job compleMartin Rodriguezactive
45solar2026-04-10AUSTIN2400 TRAIL OF MADRONESWe want to install a Battery at this residence. We will be installing downstream of main service disconnect.Martin Rodriguezactive
45solar2026-04-08AUSTIN704 FORT CHADBOURNE DRREQUEST TO DISCONNECT - Davis/Gonzales 39-52582 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main BreakeMark Bedellfinaled
45solar2026-04-08AUSTIN8104 PARKDALE DRLyon - 39-53920 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 Main Breaker. Upgrading revenue meter to 200 AmMark Bedellfinaled
45solar2026-04-08AUSTIN5703 BOULDER CREEKREQUEST TO DISCONNECT - Gillespie 39-53602 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 Main Breaker.Mark Bedellfinaled
45solar2026-04-07AUSTIN8301 JOHNNY MORRIS RDInstallation of 368.16 kW rooftop PV systemAdrian Buckactive
45solar2026-04-07AUSTIN8301 JOHNNY MORRIS RDInstallation of 247.24 kW rooftop PV systemAdrian Buckactive
45solar2026-04-07AUSTIN8301 JOHNNY MORRIS RDInstallation of 198.24 kW rooftop PV systemAdrian Buckactive
45solar2026-04-07AUSTIN8301 JOHNNY MORRIS RDINstallation of 331.58 kW rooftop PV systemAdrian Buckactive
45solar2026-04-07AUSTIN3005 WESTLAKE DRExpress- Rooftop solar panels tilted up (not aligned with roof plane). Aux Power permit 2024-126200 EP (No PV at the request of the applicant).$1Jeff Bendallfinaled
45solar2026-04-07AUSTIN1304 W OLTORF STInstallation of 29.10 KW Rooftop PV System for Existing Office/WarehouseAdrian Buckactive
45solar2026-04-06AUSTIN8904 TRONEWOOD DRInstallation new 4.4kw solar DC system with new 11.92kwh energy storage system . Installation new 125A Service sub panelMark Barylskiactive
45solar2026-04-06AUSTIN12513 ENCHANTED FOREST DRREQUEST TO DISCONNECT. Installing a 26.136 kW PV system and (2) Tesla Inc. 1707000-XX-Y inverters/batteries.Michael Solanofinaled
40solar2026-04-16AUSTIN3301 DOLPHIN CV UNIT 1Prewire for SolarMark Pridefinaled
40solar2026-04-08AUSTIN16601 E BRAKER LN BLDG 1Electrical temporary disconnect required for solar energy system install. No changes to structure proposed.David Wrightactive
40solar2026-04-02AUSTIN10205 VAQUERO TRLInstallation of 7.6kw PV Solar system.Michael Novakactive
40solar2026-04-02AUSTIN741 DALTON LNInstallation of 60.72 kW solar panel system on existing metal structure. I was instructed by commercial permit review to file for an AUX permit for thRobert Krousactive
40solar2026-03-26AUSTIN2904 MONTEBELLO CTReplace a 200 amp breaker to a 150 amp main breaker per the solar inspector and possibly a new meter can NO OTHER WORK this job has previous passed fiEduardo Martellfinaled
40solar2026-03-25AUSTIN3106 E 14TH HALF STSolar panels for existing church. No Meter review needed.Lavelle Chandleractive
40solar2026-03-18AUSTIN11700 COYOTE CALL WAYWe plan to install 4.840 KW DC ROOF MOUNT SOLAR PV SYSTEM WITH 11 - HYUNDAI SOLAR: HiS-T440NF(BK) 440W PV MODULES WITH 11 - ENPHASE IQ8A-72-2-US 349WPhillip Thompsonactive
40solar2026-03-17AUSTIN14620 LAKE VICTOR DRROOFTOP SOLAR WITH BACKUP BATTERY ONCOR EnergyPaul Joyceactive
40solar2026-03-12AUSTIN5717 MC CARTY LNInstallation of 8.8kW Solar PV SystemMichael Novakfinaled
40solar2026-03-11AUSTIN6601 ROTAN DRAng 39-38414 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _125__ Main Breaker. Upgrading revenue meter to 200Mark Bedellfinaled
40solar2026-03-11AUSTIN1314 ROCKCLIFF RDInstallation of 33.82 kW roof mounted solar system + 7 Powerwall 3 Batteries + 3 Powerwall 3 Expansions + 2 SPAN PanelsRobert Krousactive
40solar2026-03-10AUSTIN9928 THANE WAYInstallation of Roof Mounted 9.03kW Solar System. 21x SEG 430 Panels & 1x Tesla Powerwall 3.William Johnsonfinaled
40solar2026-03-06AUSTIN3106 E 14TH HALF STSolar panels for existing church.Lavelle Chandleractive
40solar2026-03-06AUSTIN6308 TOSCANA AVEDisconnect and reconnect meter to install battery backup system Ref: AUX 2026-023493 EPMartin Rodriguezfinaled
40solar2026-03-05AUSTIN6308 TOSCANA AVEWe want to install a Battery at this residence.Martin Rodriguezactive
40solar2026-03-05AUSTIN8100 TIFFANY DRDay 39-39387 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _125__ Amps. _125__ Main Breaker. Upgrading revenue meter to 20Mark Bedellfinaled
40solar2026-03-03AUSTIN9600 ANGELWYLDE DRInstall roof-mounted solar system: TOTAL INSTALL; 38.92kW - 92x RUNERGY 410w PV Modules (HY-DH108P8) with 6x Savant Power Inverters (PS-INV 12.5kW-100RICKEY YATESactive
40solar2026-03-03AUSTIN6803 BREEZY HILL DRThe previous contractor for the PV system that was installed never pulled a permit and the system was never commissioned. We are making corrections toJEREMIE BRANTONactive
40solar2026-02-26AUSTIN9604 ANGELWYLDE DRInstall roof-mounted solar system: 49.61kW - 121x RUNERGY 410w PV Modules (HY-DH108P8) with 4x Savant Power Inverters (PS-INV-12.5kW-100a) and 2x SavaRICKEY YATESactive
40solar2026-02-25AUSTIN8005 BRAMBLE BUSH DRREQUEST TO DISCONNECT - Dilworth - 39-37629 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 125 amp Main Breaker.Mark Bedellfinaled
40solar2026-02-25AUSTIN12513 ENCHANTED FOREST DRInstalling a 26.136 kW PV system and (2) Tesla Inc. 1707000-XX-Y inverters/batteries.Michael Solanoactive
40solar2026-02-25AUSTIN1304 W OLTORF STInstallation of 29.10 KW Rooftop PV System for Existing Office/WarehouseAdrian Buckactive
40solar2026-02-23AUSTIN916 FALKLAND TRCEROOFTOP SOLAR WITH BACKUP BATTERY ONCOR EnergyPaul Joycefinaled
40solar2026-02-23AUSTIN3106 E 14TH HALF STSolar panels for existing church.Lee Brandyactive
40solar2026-02-18AUSTIN1910 CYPRESS POINT WESTInstallation of 23.3kw PV Solar SystemMichael Novakactive
40solar2026-02-18AUSTIN5510 BRADFORD PEAR LNDisconnect/reconnect to tie in PV/ESS components. We are not upgrading the size of the service not upgrading the meter sizeAdrian Buckfinaled
40solar2026-02-17AUSTIN8227 N LAMAR BLVDInstalling 90.2 kW Solar System with 164 ALEX-550-W panels 1 SCA50KTL-DO and 1 SCA25KTL-DO Inverters.Stephan Engelactive
40solar2026-02-16AUSTIN6109 LOST HORIZON DRInstallation of 8.12kw Solar PV System with Battery Backup.Michael Novakfinaled
40solar2026-02-13AUSTIN9015 COLLINFIELD DRInstall 14.000 KWDC roof mounted solar pv system.John Coyleactive
40solar2026-02-10AUSTIN1129 GILLESPIE PLThe team will be wiring the meter to the battery and the battery to the main panel.Oscar Escamillafinaled
40solar2026-02-10AUSTIN3301 FAR VIEW DRInstallation of 30.600 DC ground mounted solar system with 2 tesla powerwall 3s (1608 sqft)Adrian Buckactive
40solar2026-02-09AUSTIN11407 JANUARY DRChance - 39-31962 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 Amp Main Breaker. Upgrading revenue meter toMark Bedellfinaled
40solar2026-02-05AUSTIN9989 E US 290 HWY SVRD EBInstallation of 149.38kw rooftop PV system.Adrian Buckactive
40solar2026-02-04AUSTIN3301 FAR VIEW DRInstallation of 30.600 DC ground mounted solar system with 2 tesla powerwall 3s (1608 sqft)$0Adrian Buckactive
40solar2026-02-04AUSTIN9701 COTTLE DRREQUEST TO DISCONNECT - KOSH 39-33581 - DISCONNECT/RECONNECT POWER TO TIE IN PV COMPONENT AND UPGRADING MSP TO 200AMP 200AMP MAIN BREAKER ONLY.Mark Bedellfinaled
40solar2026-02-04AUSTIN3301 FAR VIEW DRInstallation of 30.600 DC ground mounted solar system with 2 tesla powerwall 3s (1608 sqft)Adrian Buckfinaled
40solar2026-02-03AUSTIN7300 ANAQUA DRWill be installing (1) TESLA INC. 1807000-XX-Y. The customer has an existing system that consists of (18) MISSION SOLAR ENERGY LLC MSX10-435HN0B panelMichael Solanoactive
40solar2026-01-30AUSTIN1704 CAMINO VIEJOInstallation of 14.72kw Solar PV system with Battery Backup.Michael Novakfinaled
40solar2026-01-30AUSTIN10021 WIND CAVE TRLWe plan to install 7.820 KW DC ROOF MOUNT SOLAR PV SYSTEM WITH 17 - REC SOLAR: REC460AA PURE-RX 460W PV MODULES WITH 17 - ENPHASE IQ8X-80-M-US 380W MIPhillip Thompsonfinaled
40solar2026-01-29AUSTIN2702 EAST SIDE DRJimenez - 39-28439 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Full service upgrade upgrMark Bedellfinaled
40solar2026-01-28AUSTIN1405 MINNIE DRWe are requesting permit for Solar installation in 1405 Minnie Drive Austin Texas 78732.Abraham Talaveraactive
40solar2026-01-26AUSTIN1802 E 13TH STExpress: replace water heater tub to shower conversion install dedicated outlets & circuit for window units install battery powered smoke detectors foHomero Canetfinaled
40solar2026-01-26AUSTIN1802 E 13TH STExpress: replace water heater tub to shower conversion install dedicated outlets & circuit for window units install battery powered smoke detectors fo$1Libia Cruzactive
40solar2026-01-26AUSTIN1802 E 13TH STExpress: replace water heater tub to shower conversion install dedicated outlets & circuit for window units install battery powered smoke detectors foSalomon Garciaactive
40solar2026-01-26AUSTIN8227 N LAMAR BLVDInstalling 90.2 kW Solar System with 164 ALEX-550-W panels 1 SCA50KTL-DO and 1 SCA25KTL-DO Inverters.Stephan Engelactive
40solar2026-01-26AUSTIN205 E ST ELMO RDInstallation of 76.15 kw rooftop PV system.Adrian Buckactive
40solar2026-01-23AUSTIN1005 WAGON TRLRooftop Solar 33 PV modulesJEREMIE BRANTONfinaled
40solar2026-01-23AUSTIN8227 N LAMAR BLVDInstalling 90.2 kW Solar System with 164 ALEX-550-W panels 1 SCA50KTL-DO and 1 SCA25KTL-DO Inverters.James Hiebertactive
40solar2026-01-23AUSTIN7401 ARCTIC CTInstallation of solar panels systemJEREMIE BRANTONfinaled
40solar2026-01-16AUSTIN3303 NEAL STREQUEST TO DISCONNECT. Installing a 15.225 kW PV solar system 1 Tesla PW 3 and 1 Tesla DC expansionMichael Solanofinaled
40solar2026-01-14AUSTIN3303 NEAL STInstalling a 15.225 kW PV solar system 1 Tesla PW 3 and 1 Tesla DC expansionMichael Solanofinaled
40solar2026-01-14AUSTIN903 SALEM LNTEMPOPARY DISCONNECT/RECONNECT REQUESTED FOR Solar and battery installLogan Stonefinaled
40solar2026-01-13AUSTIN2504 RIDGEVIEW STRemoval/reinstallation of existing solar system. AE. No changes being made.Wesley Davisactive
40solar2026-01-12AUSTIN1404 CANON YEOMANS TRLREQUEST TO DISCONNECT - Debbs - 39-25803 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 5.76 Amps. 200amp Main Breaker only.Mark Bedellfinaled
40solar2026-01-12AUSTIN11109 PLAYERS PATHREQUEST TO DISCONNECT - Sanchez 39-23583 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 225 Amps. 200 Main Breaker only.Mark Bedellfinaled
40solar2026-01-07AUSTIN1115 BLUE FOX DRUpgrade meter can and MPU to support solar installLouis Vargasactive
40solar2026-01-05AUSTIN12506 N LAMAR BLVDIn 137.5 KW Solar System with 250 ALEX-550-W panels and 2 SCA60KTL-DO invertersStephan Engelactive
40solar2025-12-31AUSTIN1304 ALAMO STInstallation of a Tesla Powerwall 3 with a 9.345kW solar panel system. Potential shutdown neededRobert Krousfinaled
40solar2025-12-31AUSTIN13500 LATHE CVRooftop solar to existing residencePaul Ververfinaled
40solar2025-12-31AUSTIN2324 TUCKER LNWe plan to install a 8.28KW roof. mounted PV solar system.Genaro Brionesactive
40solar2025-12-29AUSTIN1304 ALAMO ST9.345 kW roof mounted solar + 1 Powerwall 3 BatteryRobert Krousfinaled
40solar2025-12-23AUSTIN2000 BARTON PKWYOnly reinstalling/ upgrading the PV meter and reinstalling the AC Disconnect due to electrical work by another contractor. Existing 10.64kW solar.Mark Pridefinaled
40solar2025-12-22AUSTIN2607 W BRAKER LNInstalling 133.65 KW Solar System with 243 ALEX 550 W panels and 2 SCA60KTL Do us 480 invertersStephan Engelfinaled
40solar2025-12-17AUSTIN7107 DUNKIRK DRHarkabus. Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 Main Breaker.Mark Bedellfinaled
40solar2025-12-16AUSTIN2607 W BRAKER LNInstalling 133.65 KW Solar System with 243 ALEX 550 W panels and 2 SCA60KTL Do us 480 invertersStephan Engelactive
40solar2025-12-16AUSTIN412 MOCK CHERRY CVRemoval/reinstallation of existing solar system. AE. No changes being made.Wesley Davisactive
40solar2025-12-16AUSTIN1403 JUSTIN LNRooftop solar w/ self consumption battery installationPaul Ververfinaled
40solar2025-12-16AUSTIN4112 MEDICAL PKWYRooftop Solar with Line Side Tap Interconnection.Mark Pridefinaled
40solar2025-12-16AUSTIN10516 ARCHDALE DRDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter sizeAdrian Buckfinaled
40solar2025-12-16AUSTIN4328 FAR WEST BLVDINSTALLTION OF A 6.880 SOLAR PANEL SYSTEM WITH 16 ROOF MOUNTED SOLAR PANELS AND 1 SOLAREDGELogan Stonefinaled
40solar2025-12-15AUSTIN17125 PAMPERING DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Jared Vaughtactive
40solar2025-12-15AUSTIN17121 PAMPERING DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Jared Vaughtactive
40solar2025-12-15AUSTIN17209 PAMPERING DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Jared Vaughtactive
40solar2025-12-15AUSTIN17221 PAMPERING DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Jared Vaughtactive
40solar2025-12-15AUSTIN4112 MEDICAL PKWYRooftop Solar with Line Side Tap Interconnection.Jeff Bendallactive
40solar2025-12-15AUSTIN5717 LOUISE LNThis project consists of installing a new grid-interactive photovoltaic and energy-storage system at 5717 Louise Ln Austin TX in accordance with the aOmar Beltranfinaled
40solar2025-12-15AUSTIN17213 PAMPERING DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Jared Vaughtactive
40solar2025-12-15AUSTIN17205 PAMPERING DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Jared Vaughtactive
40solar2025-12-12AUSTIN1104 BELMONT PKWYInstallation of 19.32kw Solar PV system.Michael Novakfinaled
40solar2025-12-12AUSTIN1120 BATTENBURG TRLRequest to disconnect to replace 200A meter can. Installing solar.David Wrightfinaled
40solar2025-12-12AUSTIN3610 OVERLORD LNInstallation of energy storage system into existing solar panel systemDavid Conradactive
40solar2025-12-12AUSTIN15117 GALENA DRInstalling 8.1 kW DC solar with ESSMark Pridefinaled
40solar2025-12-12AUSTIN10931 RESEARCH BLVD SVRD NB UNIT BInstall an 80 kW AC roof-mounted solar photovoltaic system or existing commercial building meter 6156331Adrian Buckfinaled
100 rows shown