Permits
2,746 permits • page 10 of 28
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 50 | roofing | 2024-05-20 | AUSTIN | 1924 E 38TH HALF ST | Roof Repair/ Membrane Replacement Remove Existing TPO Membrane and Install New. Replace comping and gutters no change to Structure | Will Atterberry | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 404 S LAMAR BLVD SB | Replacement of MAU on roof | Daniel Manrique-Greenwood | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement for Utility Pump Building | David Bernal | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement - SAR Roof Replacements - Flow Equalization Bld. B | David Bernal | finaled | |
| 50 | roofing | 2024-05-17 | AUSTIN | 5415 TIPTON DR | Express: roof/window/siding replacement (like for like) foundation repair interior wall reinsulation tub/shower/surround remodel HVAC/plumbing equipme | $1 | Gabriel Dunlap | finaled |
| 50 | roofing | 2024-05-17 | AUSTIN | 3001 BOXDALE DR | EMERGENCY REPAIR on riser and meter from storm damage | Averil White | finaled | |
| 50 | roofing | 2024-05-15 | AUSTIN | 5604 SUNDAY SILENCE DR | Express: Replace walk in shower Replace HVAC unit. **Full HVAC replacement New water heater New Roof New rear sliding glass door New weather stripping | Salomon Garcia | finaled | |
| 50 | roofing | 2024-05-14 | AUSTIN | 5808 ADAIR DR | express fire damage repair roof dormer truss & drywall | Alfonso Martinez | finaled | |
| 50 | roofing | 2024-05-13 | AUSTIN | 8108 BRIARWOOD LN | Storm damage*** rebuild main electrical service panel due to storm damage | Brian Robert West | finaled | |
| 50 | roofing | 2024-05-13 | AUSTIN | 5808 ADAIR DR | express fire damage repair roof dormer truss & drywall | Kris Koester | finaled | |
| 50 | roofing | 2024-05-13 | AUSTIN | 11911 ARBOR DOWNS RD | Express: roof decking repair shingle replacement (exempt) | $1 | Dylan Trotsek | finaled |
| 50 | roofing | 2024-05-07 | AUSTIN | 6101 PATTON RANCH RD | Partial renovation of existing Elementary School to include replacement of roof. | Alexis Stecker | finaled | |
| 50 | roofing | 2024-05-07 | AUSTIN | 8200 CROSS PARK DR | Roof Replacement. | David Bernal | finaled | |
| 50 | roofing | 2024-05-07 | AUSTIN | 1100 SUMMIT ST | express existing uncovered wood deck due to fire damage Eric Thomas approved for this to be processed as express fire damage Revision: Re-roof stru | Austin Johnson | active | |
| 50 | roofing | 2024-05-06 | AUSTIN | 4404 ADELPHI LN | REPAIR OF SOLAR SYSTEM DUE TO HAIL DAMAGE | Albert Garza | finaled | |
| 50 | roofing | 2024-05-06 | AUSTIN | 508 GATE TREE LN | Repair only permit pulled asap; Mast replacement storm damage. ***EMERGENCY INSPECTION DONE ON 4/29/24-HYATT*** | Brian Robert West | finaled | |
| 50 | roofing | 2024-05-06 | AUSTIN | 5317 HARVEST LN | Storm damage Replaced riser and meter socket damaged from storm. Inspected and re connected on 4/29 ***EMERGENCY INSPECTION DONE ON 4/29/24-HYATT*** | Brian Robert West | finaled | |
| 45 | roofing | 2026-08-12 | AUSTIN | 4711 CRESTWAY DR | Addition: Re-roofing existing front porch with new porch addition | $1 | Dave Weber | active |
| 45 | roofing | 2026-08-04 | AUSTIN | 12305 ABNEY DR | Express: Re-roofing (located in WUI) | $1 | Fareed Tulbah | finaled |
| 45 | roofing | 2026-08-03 | AUSTIN | 12809 N FM 620 RD NB | Simple Re-Roof. Existing retail. | Jaleel Natour | finaled | |
| 45 | roofing | 2026-07-14 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 18 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-06-25 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 17 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-06-24 | AUSTIN | 1200 E RUNDBERG LN | Interior renovations new secure entry vestibule & security fencing re-roofing elevator replacement exterior facade renovations. PuPR2 | Vincent Gillette | active | |
| 45 | roofing | 2026-06-23 | AUSTIN | 2209 S 3RD ST | Express; Metal roof replacement | $1 | Ace Fierro | finaled |
| 45 | roofing | 2026-06-22 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 16 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 209 | 7 DAY - renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT HVAC | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 110 | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 109 | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 108 | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 210 | 7 DAY - renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 208 | 7 DAY - renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-10 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 15 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-06-01 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 14 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-05-28 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 13 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-05-18 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 11 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-05-18 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 12 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-04-30 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 10 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-04-21 | AUSTIN | 3215 CUPID DR | Express: Roof replacement with re-deck of plywood underneath the shingles with 7/16 OSB | $1 | Ben Keiderling | finaled |
| 45 | roofing | 2026-04-15 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 9 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-04-03 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 8 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-03-26 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 7 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-03-25 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | Monty Lamb | active | |
| 45 | roofing | 2026-03-18 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 6 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-02-25 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 5 | TPO Roof Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-02-19 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | Colton Conklin | active | |
| 45 | roofing | 2026-02-19 | AUSTIN | 905 CONGRESS AVE | Restoration of interior finishes and millwork due to fire/water damage. Include replacement of damaged roofing skylights and rooftop equipment. | George Picken | active | |
| 45 | roofing | 2026-02-18 | AUSTIN | 905 CONGRESS AVE | Restoration of interior finishes and millwork due to fire/water damage. Include replacement of damaged roofing skylights and rooftop equipment. | Tu Huynh | active | |
| 45 | roofing | 2026-02-18 | AUSTIN | 905 CONGRESS AVE | Restoration of interior finishes and millwork due to fire/water damage. Include replacement of damaged roofing skylights and rooftop equipment. | Scott Schenk | active | |
| 45 | roofing | 2026-01-06 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | Tad Perkin | active | |
| 45 | roofing | 2025-12-31 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | $1 | Tres Davis | active |
| 45 | roofing | 2025-12-31 | AUSTIN | 5614 BULL CREEK RD | Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | $1 | Tres Davis | active |
| 45 | roofing | 2025-12-02 | AUSTIN | 701 CONGRESS AVE | Roof replacement - TPO | David Bernal | active | |
| 45 | roofing | 2025-11-20 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 4 | TPO Roof Replacement | Brad Davis | finaled | |
| 45 | roofing | 2025-11-06 | AUSTIN | 2406 BROKEN OAK DR | Express: Re-roof 2800 SqFt decking removal and replacement | $1 | Tyler Beal | active |
| 45 | roofing | 2025-09-15 | AUSTIN | 7601 BURNET RD | Roof Replacement for St. Louis Catholic Church | Steven Sartory | active | |
| 45 | roofing | 2025-08-28 | AUSTIN | 4330 BULL CREEK RD | Asphalt shingle roof replacement | Chris Macias | finaled | |
| 45 | roofing | 2025-08-27 | AUSTIN | 5010 OLD MANOR RD | Roof Replacement for City Office Building | Holly Zihlman | finaled | |
| 45 | roofing | 2025-08-18 | AUSTIN | 5440 BURNET RD | Non-structural re-roof like-for-like replacement only. | Cameron Smith | finaled | |
| 45 | roofing | 2025-07-24 | AUSTIN | 727 AIRPORT BLVD | Roof Replacement: Flute Fill and TPO Membrane over Existing Office/Warehouse | Michael Kastel | finaled | |
| 45 | roofing | 2025-07-24 | AUSTIN | 729 AIRPORT BLVD | Roof Replacement: Flute Fill and TPO Membrane over Existing Office/Warehouse | Michael Kastel | finaled | |
| 45 | roofing | 2025-07-14 | AUSTIN | 3613 BLUESTEIN DR | TPO Roof Replacement | David Bernal | finaled | |
| 45 | roofing | 2025-06-18 | AUSTIN | 600 CONGRESS AVE UNIT 3000 | REMODEL OF AN EXTERIOR ROOF DECK ON THE 30TH FLOOR - SCOPE INCLUDES REPLACEMENT OF EXTERIOR DOORS AND WINDOWS AND ROOFING STRUCTURAL REINFORCEMENT AND | Jesse Beckett | finaled | |
| 45 | roofing | 2025-06-18 | AUSTIN | 600 CONGRESS AVE UNIT 3000 | REMODEL OF AN EXTERIOR ROOF DECK ON THE 30TH FLOOR - SCOPE INCLUDES REPLACEMENT OF EXTERIOR DOORS AND WINDOWS AND ROOFING STRUCTURAL REINFORCEMENT AND | Erik Christiansen | finaled | |
| 45 | roofing | 2025-06-17 | AUSTIN | 600 CONGRESS AVE UNIT 3000 | REMODEL OF AN EXTERIOR ROOF DECK ON THE 30TH FLOOR - SCOPE INCLUDES REPLACEMENT OF EXTERIOR DOORS AND WINDOWS AND ROOFING STRUCTURAL REINFORCEMENT AND | Matt Dausch | active | |
| 45 | roofing | 2025-06-12 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | NATHAN DOELITSCH | finaled | |
| 45 | roofing | 2025-06-09 | AUSTIN | 6106 ROSS RD BLDG 2 | Bldg 2 - Repair broken gas line on roof due to storm damage | David L Kinney | finaled | |
| 45 | roofing | 2025-06-09 | AUSTIN | 6106 ROSS RD BLDG 1 | Bldg 1 - Repair broken gas line on roof due to storm damage | David L Kinney | finaled | |
| 45 | roofing | 2025-06-04 | AUSTIN | 1702 GILES ST | Emergency Permit from Storm Damage. Tree has fallen on power line and Austin Energy has cut power. ***Storm Related-Emergency inspection done on 6/3/ | William John Morris III | finaled | |
| 45 | roofing | 2025-06-02 | AUSTIN | 1428 WEBBERVILLE RD | Emergency (Storm Damage) - Service Replacement ***Storm Related-Emergency inspection done on 5/30/35. ESPA is required.-Hyatt*** | Benjamin Hubbard | finaled | |
| 45 | roofing | 2025-05-30 | AUSTIN | 1149 WEBBERVILLE RD | Emergency due to thunderstorm Emergency permit to replace riser only due to damaged by fallen tree. ***Emergency Inspection-Storm Damage-done on 5/29 | John Coppin | finaled | |
| 45 | roofing | 2025-05-29 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | Jerome Bell | finaled | |
| 45 | roofing | 2025-04-01 | AUSTIN | 8200 CAMERON RD BLDG B | Roof replacement | Holly Zihlman | finaled | |
| 45 | roofing | 2025-04-01 | AUSTIN | 8200 CAMERON RD BLDG A | Roof replacement | Holly Zihlman | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 10 | Roof Replacement for Building 10 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 12 | Roof Replacement for Building 12 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 1 | Roof Replacement for Building 1 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 9 | Roof Replacement for Building 9 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 11 | Roof Replacement for Building 11 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 13 | Roof Replacement for Building 13 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 8 | Roof Replacement for Building 8 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 2 | Roof Replacement for Building 2 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG E | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building E | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG C | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building C | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG K | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building K | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG A | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building A | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG H | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building H | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-03 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | Jacob Hussa | finaled | |
| 45 | roofing | 2025-01-23 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | $1 | Jacob Hussa | finaled |
| 45 | roofing | 2024-11-11 | AUSTIN | 6710 BURNET RD | Change of use from vehicle sales to vehicle rental. New CO no construction or change to the building profile. Potential roof replacement from hail dam | Cody Sprinkle | finaled | |
| 45 | roofing | 2024-10-18 | AUSTIN | 2219 MANOR RD | Mechanically attach new .60 mil. TPO over existing hail damage modified. No structural changes. | Daniel McCoy | finaled | |
| 45 | roofing | 2024-09-30 | AUSTIN | 607 RED RIVER ST | Roof Replacement | Molly Johnston | finaled | |
| 45 | roofing | 2024-09-12 | AUSTIN | 8733 BURNET RD | Roof Replacement to existing Retail Building | Molly Johnston | finaled | |
| 45 | roofing | 2024-08-13 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | David Paone | finaled | |
| 45 | roofing | 2024-07-03 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | Keating Kuhn | finaled | |
| 45 | roofing | 2024-07-03 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | David Demoss | finaled | |
| 45 | roofing | 2024-06-17 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | $1 | Cameron Treme | finaled |
| 45 | roofing | 2024-06-11 | AUSTIN | 3811 AIRPORT BLVD | Replacement of TPO roof system. New system to meet IECC minimum requirements of R-25. | Steven Sartory | finaled | |
| 45 | roofing | 2024-05-28 | AUSTIN | 6205 BURNET RD | Replace existing TPO membrane from hail damage april 9 2024. Remove existing .60 mil. TPO and replace with new .60 mil. TPO using TPO bonding adhesive | Daniel McCoy | finaled | |
| 40 | roofing | 2026-07-30 | AUSTIN | 11424 VIRIDIAN WAY | Express- WUI Zone C reroofing with Class A fire roofing materials - Owens Corning Duration Shingles and OC underlayment. Mesh in ventilation. | $1 | Fareed Tulbah | finaled |