Permits
2,593 permits • page 10 of 26
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 45 | roofing | 2026-06-12 | AUSTIN | 1605 W 11TH ST | Express: Replace siding insulation drywall doors and windows; new electrical new A/C drain line re-roof | Jared Thompson | active | |
| 45 | roofing | 2026-06-12 | AUSTIN | 4301 FARHILLS DR | Demo old upper deck and rebuilding with wui approved materials adding existing unpermitted canopy roof so that it will be properly permitted | $1 | George Barnett | active |
| 45 | roofing | 2026-06-12 | AUSTIN | 1143 SALINA ST | RE-ROOF - re roof existing office building - OVA | Miguel Juarez | active | |
| 45 | roofing | 2026-06-08 | AUSTIN | 1708 ADINA ST | Demo fence carport conc patio slab; Fill in exist. ext door/curb; Replace exist. ext. doors/windows (same size); Replace drywall at w. heater closet; Replace exist. A/C water heater flooring cabinets doors trim/shelving fans switches outlets AC vents tile plumbing fixtures; Add recess lighting. New roof fence | Richard P Rayborn | active | |
| 45 | roofing | 2026-06-01 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 14 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-05-28 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 13 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-05-18 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 11 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-05-18 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 12 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-04-30 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 10 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-04-21 | AUSTIN | 3215 CUPID DR | Express: Roof replacement with re-deck of plywood underneath the shingles with 7/16 OSB | $1 | Ben Keiderling | finaled |
| 45 | roofing | 2026-04-15 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 9 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-04-03 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 8 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-03-26 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 7 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-03-25 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | Monty Lamb | active | |
| 45 | roofing | 2026-03-18 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 6 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-02-25 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 5 | TPO Roof Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-02-19 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | Colton Conklin | active | |
| 45 | roofing | 2026-02-19 | AUSTIN | 905 CONGRESS AVE | Restoration of interior finishes and millwork due to fire/water damage. Include replacement of damaged roofing skylights and rooftop equipment. | George Picken | active | |
| 45 | roofing | 2026-02-18 | AUSTIN | 905 CONGRESS AVE | Restoration of interior finishes and millwork due to fire/water damage. Include replacement of damaged roofing skylights and rooftop equipment. | Tu Huynh | active | |
| 45 | roofing | 2026-02-18 | AUSTIN | 905 CONGRESS AVE | Restoration of interior finishes and millwork due to fire/water damage. Include replacement of damaged roofing skylights and rooftop equipment. | Scott Schenk | active | |
| 45 | roofing | 2026-01-06 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | Tad Perkin | active | |
| 45 | roofing | 2025-12-31 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | $1 | Tres Davis | active |
| 45 | roofing | 2025-12-31 | AUSTIN | 5614 BULL CREEK RD | Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | $1 | Tres Davis | active |
| 45 | roofing | 2025-12-02 | AUSTIN | 701 CONGRESS AVE | Roof replacement - TPO | David Bernal | active | |
| 45 | roofing | 2025-11-20 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 4 | TPO Roof Replacement | Brad Davis | finaled | |
| 45 | roofing | 2025-11-06 | AUSTIN | 2406 BROKEN OAK DR | Express: Re-roof 2800 SqFt decking removal and replacement | $1 | Tyler Beal | active |
| 45 | roofing | 2025-09-15 | AUSTIN | 7601 BURNET RD | Roof Replacement for St. Louis Catholic Church | Steven Sartory | active | |
| 45 | roofing | 2025-08-28 | AUSTIN | 4330 BULL CREEK RD | Asphalt shingle roof replacement | Chris Macias | finaled | |
| 45 | roofing | 2025-08-27 | AUSTIN | 5010 OLD MANOR RD | Roof Replacement for City Office Building | Holly Zihlman | finaled | |
| 45 | roofing | 2025-08-18 | AUSTIN | 5440 BURNET RD | Non-structural re-roof like-for-like replacement only. | Cameron Smith | finaled | |
| 45 | roofing | 2025-07-24 | AUSTIN | 727 AIRPORT BLVD | Roof Replacement: Flute Fill and TPO Membrane over Existing Office/Warehouse | Michael Kastel | finaled | |
| 45 | roofing | 2025-07-24 | AUSTIN | 729 AIRPORT BLVD | Roof Replacement: Flute Fill and TPO Membrane over Existing Office/Warehouse | Michael Kastel | finaled | |
| 45 | roofing | 2025-07-14 | AUSTIN | 3613 BLUESTEIN DR | TPO Roof Replacement | David Bernal | finaled | |
| 45 | roofing | 2025-06-18 | AUSTIN | 600 CONGRESS AVE UNIT 3000 | REMODEL OF AN EXTERIOR ROOF DECK ON THE 30TH FLOOR - SCOPE INCLUDES REPLACEMENT OF EXTERIOR DOORS AND WINDOWS AND ROOFING STRUCTURAL REINFORCEMENT AND | Jesse Beckett | finaled | |
| 45 | roofing | 2025-06-18 | AUSTIN | 600 CONGRESS AVE UNIT 3000 | REMODEL OF AN EXTERIOR ROOF DECK ON THE 30TH FLOOR - SCOPE INCLUDES REPLACEMENT OF EXTERIOR DOORS AND WINDOWS AND ROOFING STRUCTURAL REINFORCEMENT AND | Erik Christiansen | finaled | |
| 45 | roofing | 2025-06-17 | AUSTIN | 600 CONGRESS AVE UNIT 3000 | REMODEL OF AN EXTERIOR ROOF DECK ON THE 30TH FLOOR - SCOPE INCLUDES REPLACEMENT OF EXTERIOR DOORS AND WINDOWS AND ROOFING STRUCTURAL REINFORCEMENT AND | Matt Dausch | active | |
| 45 | roofing | 2025-06-12 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | NATHAN DOELITSCH | finaled | |
| 45 | roofing | 2025-06-09 | AUSTIN | 6106 ROSS RD BLDG 2 | Bldg 2 - Repair broken gas line on roof due to storm damage | David L Kinney | finaled | |
| 45 | roofing | 2025-06-09 | AUSTIN | 6106 ROSS RD BLDG 1 | Bldg 1 - Repair broken gas line on roof due to storm damage | David L Kinney | finaled | |
| 45 | roofing | 2025-06-04 | AUSTIN | 1702 GILES ST | Emergency Permit from Storm Damage. Tree has fallen on power line and Austin Energy has cut power. ***Storm Related-Emergency inspection done on 6/3/ | William John Morris III | finaled | |
| 45 | roofing | 2025-06-02 | AUSTIN | 1428 WEBBERVILLE RD | Emergency (Storm Damage) - Service Replacement ***Storm Related-Emergency inspection done on 5/30/35. ESPA is required.-Hyatt*** | Benjamin Hubbard | finaled | |
| 45 | roofing | 2025-05-30 | AUSTIN | 1149 WEBBERVILLE RD | Emergency due to thunderstorm Emergency permit to replace riser only due to damaged by fallen tree. ***Emergency Inspection-Storm Damage-done on 5/29 | John Coppin | finaled | |
| 45 | roofing | 2025-05-29 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | Jerome Bell | finaled | |
| 45 | roofing | 2025-04-01 | AUSTIN | 8200 CAMERON RD BLDG B | Roof replacement | Holly Zihlman | finaled | |
| 45 | roofing | 2025-04-01 | AUSTIN | 8200 CAMERON RD BLDG A | Roof replacement | Holly Zihlman | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 10 | Roof Replacement for Building 10 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 12 | Roof Replacement for Building 12 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 1 | Roof Replacement for Building 1 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 9 | Roof Replacement for Building 9 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 11 | Roof Replacement for Building 11 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 13 | Roof Replacement for Building 13 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 8 | Roof Replacement for Building 8 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 2 | Roof Replacement for Building 2 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG E | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building E | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG C | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building C | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG K | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building K | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG A | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building A | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG H | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building H | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-03 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | Jacob Hussa | finaled | |
| 45 | roofing | 2025-01-23 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | $1 | Jacob Hussa | finaled |
| 45 | roofing | 2024-11-11 | AUSTIN | 6710 BURNET RD | Change of use from vehicle sales to vehicle rental. New CO no construction or change to the building profile. Potential roof replacement from hail dam | Cody Sprinkle | finaled | |
| 45 | roofing | 2024-10-18 | AUSTIN | 2219 MANOR RD | Mechanically attach new .60 mil. TPO over existing hail damage modified. No structural changes. | Daniel McCoy | finaled | |
| 45 | roofing | 2024-09-30 | AUSTIN | 607 RED RIVER ST | Roof Replacement | Molly Johnston | finaled | |
| 45 | roofing | 2024-09-12 | AUSTIN | 8733 BURNET RD | Roof Replacement to existing Retail Building | Molly Johnston | finaled | |
| 45 | roofing | 2024-08-13 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | David Paone | finaled | |
| 45 | roofing | 2024-07-03 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | Keating Kuhn | finaled | |
| 45 | roofing | 2024-07-03 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | David Demoss | finaled | |
| 45 | roofing | 2024-06-17 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | $1 | Cameron Treme | finaled |
| 45 | roofing | 2024-06-11 | AUSTIN | 3811 AIRPORT BLVD | Replacement of TPO roof system. New system to meet IECC minimum requirements of R-25. | Steven Sartory | finaled | |
| 45 | roofing | 2024-05-28 | AUSTIN | 6205 BURNET RD | Replace existing TPO membrane from hail damage april 9 2024. Remove existing .60 mil. TPO and replace with new .60 mil. TPO using TPO bonding adhesive | Daniel McCoy | finaled | |
| 40 | roofing | 2026-06-03 | AUSTIN | 2124 TURTLE MOUNTAIN BND | Express- Remove and replace shingles and remove and replace roof decking | $1 | Maria Marsh | active |
| 40 | roofing | 2026-06-01 | AUSTIN | 3201 WEST AVE | Interior remodel of existing detached 1-story garage to 2 bedroom 2 bath accessory to primary structure; modify the roof to add a roof skylight window. | Darby Spencer | active | |
| 40 | roofing | 2026-06-01 | AUSTIN | 3201 WEST AVE | Interior remodel of existing detached 1-story garage to 2 bedroom 2 bath accessory to primary structure; modify the roof to add a roof skylight window. | Kevin Jones | active | |
| 40 | roofing | 2026-05-29 | AUSTIN | 2901 VIA FORTUNA BLDG 6 | Simple Re Roof. Existing Office Building. | Holly Zihlman | active | |
| 40 | roofing | 2026-05-29 | AUSTIN | 4500 GREYSTONE DR | Express: Replace composite roof with metal roof replacing window for window | $1 | David Williamson | active |
| 40 | roofing | 2026-05-28 | AUSTIN | 3201 WEST AVE | Interior remodel of existing detached 1-story garage to 2 bedroom 2 bath accessory to primary structure; modify the roof to add a roof skylight window. | Darrin Petru | active | |
| 40 | roofing | 2026-05-27 | AUSTIN | 709 MERIDEN LN | *partial demo* New exterior stairs replace roof & rear deck interior remodel Notary to be confirmed | HERIDO MORALES | active | |
| 40 | roofing | 2026-05-27 | AUSTIN | 2002 NARROW GLEN PKWY | Express: reroof in WUI | $1 | Marika Little | active |
| 40 | roofing | 2026-05-26 | AUSTIN | 11205 MORNING GLORY TRL | Primary bathroom is to be remodeled w/scope of work to include large shower moving toilet over to accommodate required code clearances and plumbing for and installation of a dual sink vanity. New light fixtures a new bathroom fan and cosmetic upgrades will be made. No structural work to wall or roof is anticipated. | James Garcia | finaled | |
| 40 | roofing | 2026-05-26 | AUSTIN | 3201 WEST AVE | Interior remodel of existing detached 1-story garage to 2 bedroom 2 bath accessory to primary structure; modify the roof to add a roof skylight window. | $1 | Jamie Borkowski | active |
| 40 | roofing | 2026-05-22 | AUSTIN | 2113 CROWNSPOINT DR | Express- Replace 320 sq ft of decking on roof and replace roof shingles | $1 | Saul Vela | finaled |
| 40 | roofing | 2026-05-20 | AUSTIN | 3408 MOUNTAIN TOP CIR | Express: Installing Tesla solar roof system | Michael Solano | active | |
| 40 | roofing | 2026-05-20 | AUSTIN | 11312 ROBERT WOODING DR | Express: shingle/felt paper roof repair in WUI | $1 | Mauricio Quintero | finaled |
| 40 | roofing | 2026-05-20 | AUSTIN | 1905 KERR ST | Partial Demolition1-story addition/interior remodel to existing residence. New covered porch new roof new flat work driveway (within property lines) remove brick veneer | Matthew Archer | active | |
| 40 | roofing | 2026-05-20 | AUSTIN | 2623 W 45TH ST | Reconfigure main bedroom suite. Main bathroom and laundry relocated. Interior walls to be removed and supporting beams installed to support joist and roof structure. New windows in areas remodeled and new front door and patio door in area remodeled. Not same for same. retroactively permit garage conversion | Joe Chavez | active | |
| 40 | roofing | 2026-05-18 | AUSTIN | 2901 S CAPITAL OF TEXAS HWY NB | Roof recover. No structural changes. Remove existing roof membrane. Install a Carlisle 135-Mil white TPO Fleeceback membrane over the existing insulation mechanically fastened. | Jarrell Perrin | active | |
| 40 | roofing | 2026-05-18 | AUSTIN | 4115 HONEYCOMB ROCK CIR | Addition and remodel: full interior remodel with small interior additions on rear and new covered back porch all new interior finishes and fixtures all new exterior windows doors roofing and siding (except brick) new gas fire place decorative structural changes to front side of roof all new plumbing and electrical. Pool not in scope | Paul O'Brien | active | |
| 40 | roofing | 2026-05-15 | AUSTIN | 3408 MOUNTAIN TOP CIR | Express: Installing Tesla solar roof system | $1 | Michael Solano | active |
| 40 | roofing | 2026-05-15 | AUSTIN | 2505 BRAEMAR CV | Express- RR Reroof Asphalt shingle to shingle. | $1 | TYRONE CARRINGTON | finaled |
| 40 | roofing | 2026-05-15 | AUSTIN | 4504 JINX AVE | Express- remove existing roof and replace with new modified roof that allows a 7 foot max gable height to accommodate new AC unit. This work does not involve changing of the floor structure. HVAC not part of this permit app. | $1 | Trinidad Aleman | active |
| 40 | roofing | 2026-05-15 | AUSTIN | 2623 W 45TH ST | Reconfigure main bedroom suite. Main bathroom and laundry relocated. Interior walls to be removed and supporting beams installed to support joist and roof structure. New windows in areas remodeled and new front door and patio door in area remodeled. Not same for same. retroactively permit garage conversion | Eulalio Torres | active | |
| 40 | roofing | 2026-05-14 | AUSTIN | 1715 W CESAR CHAVEZ ST | ePlan: Commercial Expedited Review - [PUBLIC PROJECT] Interior Remodel to Austin High School. Roof Recovering at Theater Building. (396761 SF). | Weldon Schmidt | active | |
| 40 | roofing | 2026-05-14 | AUSTIN | 2101 E ST ELMO RD BLDG 1 UNIT 150 | Addition of exterior concrete enclosure with roof to store flammable gases in the truck court. | Paul Wagner | active | |
| 40 | roofing | 2026-05-13 | AUSTIN | 6817 VALBURN DR | EXPRESS: Remove and replace existing roof with a .24 gauge standing seam roof system | $1 | Michael Biles | finaled |
| 40 | roofing | 2026-05-13 | AUSTIN | 6809 WILLAMETTE DR | Interior Remodel New electrical system mechanical system paint flooring interior doors plumbing fixtures & cabinets. New exterior paint and asphalt shingle roof. | Dave Gonzalez | active | |
| 40 | roofing | 2026-05-12 | AUSTIN | 1904 E 11TH ST | Express: roof repair down to decking boards | $1 | Kim Boyer | finaled |
| 40 | roofing | 2026-05-11 | AUSTIN | 7004 CRAYBROUGH CIR | Interior remodel and garage conversion to add bedroom closet bathroom and utility room. Remove the existing cover over the rear patio and grass area and construct pergola covered deck (less than 36 above grade) over the existing concrete patio. New asphalt shingle roof. No change to the front porch. | Luis Olivares | active | |
| 40 | roofing | 2026-05-07 | AUSTIN | 2110 W SLAUGHTER LN | reroof overlay - ova | Molly Johnston | active | |
| 40 | roofing | 2026-05-07 | AUSTIN | 11205 MORNING GLORY TRL | Primary bathroom is to be remodeled w/scope of work to include large shower moving toilet over to accommodate required code clearances and plumbing for and installation of a dual sink vanity. New light fixtures a new bathroom fan and cosmetic upgrades will be made. No structural work to wall or roof is anticipated. | Juan Charles | finaled | |
| 40 | roofing | 2026-05-06 | AUSTIN | 5337 TAMANGO WAY | Express: Re-roof | $1 | Fareed Tulbah | finaled |