PPermitDrop

Permits

3,028 permits • page 1 of 31

Export CSV
ScoreTradeDateCityAddressDescriptionValueContractorStatus
90solar2026-10-08AUSTIN10206 LA COSTA DRInstall new 13.5kw energy storage system & replacement of 1 energy storage system with second 13.5kW ess for existing residential only.Chadwyck Preeceactive
80solar2026-10-30AUSTIN14224 SANDROCK BNDNew solar system installation for new residential home buildJEREMIE BRANTONactive
80solar2026-10-30AUSTIN2013 ROGGE LNMartinez 40-08255 - Install new _6.9__kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
80solar2026-10-29AUSTIN2502 GIVENS AVEInstallation of 12.3KW DC of solar on residential homeScott Wilsonactive
80solar2026-10-28AUSTIN14400 VARRELMAN STCampbell - 40-27500 - Install new 3.8 kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
80solar2026-10-28AUSTIN6604 BRADLEY DRInstall residential energy storage system per stamped plans (Wyssling Consulting PE 140799): (1) FranklinWH aPower 2 battery (15 kWh 10 kW AC) with FranklinWH aGate X (200 A) AC-coupled to the existing 9.84 kW DC / 8.38 kW AC SunPower microinverter PV system. aGate X installed within 10 ft of the utility meter and serves as the main service disconnect; existing solar load center PV AC disconnect and PV production meter relocated to the left; existing 50A/2P PV backfeed breaker removed from the main panel and PV re-terminated on the aGate PV breaker. New visible lockable ESS disconnect and E-stop. Austin Energy DGPA (<25 kW no review required) and signed Residential Interconnection Agreement attached.Roy Jacksonactive
80solar2026-10-28AUSTIN7528 REDRICK DRBERA - Install new _7.3__kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
80solar2026-10-28AUSTIN3605 RIPPLE CREEK DRInstall residential energy storage system (whole-home backup) per stamped plans (Wyssling Consulting PE 140799): (2) FranklinWH aPower 2 batteries (30 kWh 20 kW AC total) with FranklinWH aGate X (125 A ESS breaker). aGate X installed adjacent to the utility meter and serves as the service disconnect; battery load center and ESS disconnect within 5 ft of the main service panel. Existing standby generator feeder re-routed to the aGate generator input through a new junction box. No PV. Austin Energy DGPA (<25 kW no review required) and signed Residential Interconnection Agreement attached. Property is in the Austin 2-mile ETJ.Roy Jacksonactive
80solar2026-10-28AUSTIN11208 HENGE DRLogrip - 40-25361 - Install new 5.7 kW rooftop solar system to existing residential only backfed breaker only.Mark Bedellactive
80solar2026-10-26AUSTIN4902 BOB CAT RUNUpgrade meter base to 200 Amp add outdoor main shut off add supplemental grounding system add whole home surge protection in preparation for upcoming Base Power battery backupCarl Geersactive
80solar2026-10-26AUSTIN11537 CHURCH CANYON DRInstall new 3.15kw rooftop solar system for existing residential only.Chadwyck Preeceactive
80solar2026-10-23AUSTIN4604 GRAY FOX DRGodigamuwa - 40-26987 - Install new 7.6 kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
80solar2026-10-09AUSTIN3605 RIPPLE CREEK DRService repair to facilitate the Austin Energy disconnect/reconnect for the residential energy storageRoy Jacksonactive
80solar2026-10-09AUSTIN6604 BRADLEY DRService repair to facilitate the Austin Energy disconnect/reconnect for the residential energy storage .disconnect and reconnectRoy Jacksonactive
80solar2026-10-08AUSTIN5603 FORKS RDInstall new 6.525kW rooftop solar system for existing residential only.Chadwyck Preeceactive
80solar2026-10-06AUSTIN6409 SALCON CLIFF DRAvery - 40-23269 - Install new 11.4kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
80solar2026-10-06AUSTIN7109 GENTLE OAK DRInstall new 7.37kw rooftop solar system and 13.5kw energy storage system for existing residential onlyChadwyck Preeceactive
80solar2026-09-30AUSTIN13317 SLOW POKE DRInstall new rooftop 4.5 kW solar and 11.5 kW energy storage system w/ meter socket mounted backup switch to existing residential. PV & ESS Supply side connection.Paul Ververactive
80solar2026-06-26AUSTIN4904 SEADRIFT DRResidential Installation of Solar PV System with Battery BackupMichael Novakactive
80solar2026-05-26AUSTIN6200 LOST HORIZON DRHuckabee - 39-53028 - Install new 200kW rooftop solar system to existing residential only using backfed breaker only. *200 Amp 6.57 kW DC / 5.76 kW AMark Bedellactive
75solar2026-10-26AUSTIN15925 NARCISSUS WAYInstall new 8kw rooftop solar system and 11.5kw energy storage system for existing residential onlyChadwyck Preeceactive
70solar2026-10-21AUSTIN6637 QUINTON DRTindall 40-25134 - Install new _6.9__kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
70solar2026-10-20AUSTIN2616 SHERWOOD LNPre-wire only for future residential rooftop solar. We are currently only contracted to complete the pre-wire.Eric Kayactive
70solar2026-10-13AUSTIN4515 MAGIN MEADOW DRInstall new 9.57kw rooftop solar system for existing residential only.Chadwyck Preeceactive
70solar2025-07-23AUSTIN1406 DWYCE DRJudge - Install new 7.30kW rooftop solar system to existing residential only using line side tap.finaled
70solar2025-07-23AUSTIN8302 KROMER STBrown - Install new 7.6kW rooftop solar system to existing residential only using backfed breakerfinaled
65solar2026-10-30AUSTIN13600 CALDWELL DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN3317 GALESBURG DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN4002 TAMARACK TRLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN2306 SHELBY OAK LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN2103 VANDERBILT LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN2206 TOWBRIDGE CIRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN4308 SMALL DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN12444 LAGUARDIA LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN1103 MERIDEN LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN2904 WHITE ROCK DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN4016 ENCLAVE MESA CIRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN3631 PEREGRINE FALCON DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN3601 MALONE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN4509 COOL GRAY CVBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN3101 SWEET AUTUMN CVBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN1100 DEXFORD DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN4501 WESTLAKE DR BLDG 29BASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN7204 CORDOBA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-30AUSTIN9405 CHINA ROSE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-29AUSTIN12404 BLUESTONE CIRAddition of 8.1kW DC. Existing 8.1kWDC 16kw inverter and 16kwh ESSPatrick Baxteractive
65solar2026-10-28AUSTIN5607 MAPLELEAF DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN2705 TOWNES LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN9200 LANTANA WAYBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN5602 SHOAL EDGE CTBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN2911 SORIN STBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN6204 BELFAST DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN2401 GIVENS AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN6602 LOST HORIZON DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN2610 HUME PLINSTALLATION OF 48.79KW PV SOLAR SYSTEM.Sudhakar Alladaactive
65solar2026-10-28AUSTIN3106 PERRY LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN2000 LIPAN TRLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN10016 DEER CHASE TRLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN4702 STRASS DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN5632 NIJMEGEN DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN4807 FORT MOULTRIE LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN5408 PROCK LN UNIT BUnit B per the DGPA - BASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN2008 OAKLEAF CIRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN1925 WIMBERLY LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN4001 CHAMISA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN408 CHIHUAHUA TRLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN6410 YAUPON DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN806 MARC TAYLOR DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN711 KINNEY AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN4401 GREYSTONE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN3701 HARPERS FERRY LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN4805 BALCONES DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN12102 CANTABRIA RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN5917 BAYTHORNE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN1229 DEXFORD DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN1717 PASADENA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN4508 FRONTIER TRLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN5312 MULBERRY GROVE LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN4501 WESTLAKE DR BLDG 3BASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN2119 W 11TH STBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN7606 CHELMSFORD DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN5907 BULLARD DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN10804 CULBERSON DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN6518 LADERA NORTEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN6912 RIDGE HOLWBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN3310 GRASSHOPPER DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN7106 TOWERING OAKS DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN3001 MC ELROY DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN12207 MIDLAND WALKBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN2019 BRENTWOOD STBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN810 NEWPORT AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN1112 REAGAN TERBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN11205 COUNTY DOWN DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN1103 AZIE MORTON RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN8105 ASMARA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN4204 WILSHIRE PKWYBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN1906 MAPLE AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN16505 FOREST WAYBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN11516 SPRING HILL DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-10-28AUSTIN5513 LINK AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
100 rows shown